ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Gaurinandan Heights

Registered No litigation declared Residential / Group Housing project

Gaurinandan Heights

By Trident Civil Projects

RG-MH-23334 · RERA P52100078642 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
54 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Gaurinandan Heights is a Residential / Group Housing project by Trident Civil Projects in Pune, Maharashtra, registered with MahaRERA as P52100078642 on 30 Dec 2024. Possession is promised by 27 Dec 2027. 11 of the 65 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameGaurinandan Heights
  • TypeResidential / Group Housing
  • Location
    • Kolhemala Road
    • Narayangaon
    • Junnar
    • Pune
    • 410504
  • Pincode410504
  • RERA no.P52100078642
  • ReraGenie IDRG-MH-23334

Builder

  • NameTrident Civil Projects
  • Entity typePartnership

Key dates

this monthRegisteredDec 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Dec 2024
  • Promised completion27 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed72 files

Current status

17%11 of 65 units booked
57.3%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA6630535
Wing BWing B7630030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Wing A86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing B · wing Wing B21%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered86
Open Space9
BuildingClosed/CoveredOpen SpaceTotal
Wing A45954
Wing B Wing B41041

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,263 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jan 2026

Approvals and building plan

Sanctioning authorityJunnar ambegaon sub division pune
Permissible FSI5059.48
Proposed, not sanctioned5,059 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SWAMIRATNA BUILDING, PUNE-NASHIK HIGHWAY, OPP. HP PETROL PUMP, POST : NARAYANGAON, PIN : 410504, TALUKA : JUNNAR, DISTRICT : PUNE. MAHARASHTRA.
Estimated costRs 10.28 cr
Cost incurredRs 5.90 cr
Work done57.34%
BuildingWingEstimatedIncurred
Wing ANARs 5.00 crRs 4.50 cr
-NARs 4.78 crRs 1.20 cr
Wing BWing BRs 50.00 lakhRs 20.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVision Architects
EngineerPrudent Design Pvt. Ltd.
Chartered AccountantTTS And Associates
PartnerRole in project
Trident Civil Projects-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 27 Dec 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 upto 31-03-2026.pdf6 Jun 2026
Withdrawal Update Form 2File: form 2 upto 31-03-2026.pdf6 Jun 2026
Withdrawal Update Form 3File: form 3 upto 31-03-2026.pdf6 Jun 2026
Withdrawal Update Form 1File: form 1 upto 31-12-2025.pdf16 Mar 2026
Withdrawal Update Form 1File: form 1 upto 31-12-2025.pdf16 Mar 2026
Withdrawal Update Form 2File: form 2 upto 31-12-2025.pdf16 Mar 2026
Withdrawal Update Form 2File: form 2 upto 31-12-2025.pdf16 Mar 2026
Withdrawal Update Form 3File: form 3 upto 31-12-2025.pdf16 Mar 2026
Withdrawal Update Form 3File: form 3 upto 31-12-2025.pdf16 Mar 2026
Layout approvalFile: Highlighted NEW Sanctioned plan wing A and B.pdf12 Jan 2026
Building plan approvalFile: Highlighted NEW Building Plan Wing A.pdf12 Jan 2026
Building plan approvalFile: Highlighted NEW Building Plan Wing B.pdf12 Jan 2026
Building plan approvalFile: Highlighted NEW Building Plan Wing B.pdf12 Jan 2026
Layout approvalFile: NEW Sanctioned plan wing A and B.pdf11 Jan 2026
Building plan approvalFile: NEW Building Plan Wing A.pdf11 Jan 2026
Building plan approvalFile: NEW Building Plan Wing B.pdf11 Jan 2026
Layout approvalFile: NEW Sanctioned plan wing A and B.pdf4 Dec 2025
Building plan approvalFile: NEW Building Plan Wing A.pdf4 Dec 2025
Building plan approvalFile: NEW Building Plan Wing B.pdf4 Dec 2025
Layout approvalFile: scan2760.pdf31 Oct 2025
Building plan approvalFile: scan2761.pdf31 Oct 2025
Layout approvalFile: scan2762.pdf31 Oct 2025
Building plan approval or NA orderFile: NA ORDER.pdf31 Oct 2025
Withdrawal Update Form 1File: form 1 upto 30-09-2025.pdf16 Oct 2025
Withdrawal Update Form 2File: form 2 upto 30-09-2025.pdf16 Oct 2025
Withdrawal Update Form 3File: form 3 upto 30-09-2025.pdf16 Oct 2025
Form 1File: form 1 upto 31-12-2024.pdf24 Sep 2025
Form 2File: form 2 upto 31-12-2024.pdf24 Sep 2025
Form 3File: form 3 upto 31-12-2024.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold inventory Upto 31-12-2024.pdf24 Sep 2025
Form 5 (FY 2024-2025)File: Form 5.pdf22 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf8 Aug 2025
Form 1File: Form 1 Upto 31-03-2025.pdf4 Aug 2025
Form 2File: Form 2 Upto 31-03-2025.pdf4 Aug 2025
Form 3File: Form 3 Upto 31-03-2025.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold inventory Upto 31-03-2025.pdf4 Aug 2025
Form 1File: form 1 upto 30-06-2025.pdf26 Jul 2025
Form 2File: Form 2 upto 30-06-2025.pdf26 Jul 2025
Form 3File: form 3 upto 30-06-2025.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory upto 30-06-2025.pdf26 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Upto 31-03-2025.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate Gaurinandan Heights Upto 31-03-2025.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory Upto 31-03-2025.pdf9 May 2025
Copy of the legal title reportFile: Copy of the legal title reportpage0001.pdf19 Dec 2024
Proforma of Agreement for saleFile: Proforma of Agreement for Sale dated corrected order 63 afs.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SCAN.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 below 3mb scan.pdf28 Nov 2024
Other - LegalFile: sales deed Tridentcompressed.pdf28 Nov 2024
Other - TechnicalFile: Email from SDO.pdf28 Nov 2024
Other - TechnicalFile: Annexure A Order No 50.pdf5 Nov 2024
Proforma of Allotment letterFile: Proforma of Allotment Letter dated 04-09-2024 Allotment.pdf30 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to model form of allotment letter.pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A swapnil kute.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf27 Oct 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf27 Oct 2024
CERSAI detailsFile: Declration Cersai.pdf27 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dis Intrest other Real Estate Organization.pdf27 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about all RERA Designated Bank Accounts (Format A).pdf23 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B).pdf23 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf19 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation agreement Gaurinandan Heights.pdf19 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured_ unsecured finance Available for the project.pdf19 Oct 2024
Building plan approvalFile: Building Plan Aproval.pdf18 Oct 2024
Layout approvalFile: Plan.pdf18 Oct 2024
PAN CardFile: Pancard.pdf18 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter (Finance) .pdf18 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter (Legal) .pdf18 Oct 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf18 Oct 2024
Declaration in FORM BFile: BUILDER Form B affidavit cum declaration for Gaurinandan.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Aproval.pdf18 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter (Finance) .pdf18 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter (Legal) .pdf18 Oct 2024

How this compares with Pune

17%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gaurinandan Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Narayangaon13,700+ in Pune

Builder: Trident Civil Projects

Trident Civil Projects has 1 registration on MahaRERA, including Gaurinandan Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Gaurinandan Heights is delayed beyond 27 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gaurinandan Heights?

The registered promoter entity is Trident Civil Projects, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gaurinandan Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gaurinandan Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gaurinandan Heights?

The professionals named in the filing: Architect: Vision Architects; Engineer: Prudent Design Pvt. Ltd.; Chartered Accountant: TTS And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gaurinandan Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gaurinandan Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gaurinandan Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.