GAURAV WOODS II
RG-MH-12476 · RERA P51800011407 · Last updated on MahaRERA portal: 5 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 4 cases
- 17 complaints at MahaRERA
- Completion date moved by 60 months
- 2 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GAURAV WOODS II is a Residential / Group Housing project by Ravi Developments in Thane, Maharashtra, registered with MahaRERA as P51800011407 on 31 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 60 months from the original filing. 287 of the 495 units on this registration are recorded sold or booked, and 14 of 33 construction stages are filed complete. 17 complaints are on record with the regulator.
At a glance
Project
- NameGAURAV WOODS II
- TypeResidential / Group Housing
- Location
- Shri Kishoreji V Khimawat Marg
- Beverly Park Mira road
- Mira-Bhayandar (M Corp.)
- Thane
- 401107
- Pincode401107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800011407
- ReraGenie IDRG-MH-12476
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2023)
- Buildings3 building records
- Documents filed126 files
Current status
Figures as on 5 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| G1 | NA | 25 | 21 | 165 | 0 | 165 |
| G2 | NA | 25 | 21 | 165 | 0 | 165 |
| G3 | NA | 25 | 21 | 165 | 0 | 165 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 71%.
G167%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 71% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 54% |
| Sanitary Fittings within the flats / premises | 13% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 47% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 51% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
G244%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 70% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 8% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 1% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
G375%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 62% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 59% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 61% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| G1 | 1 | 1 |
| G2 | 1 | 1 |
| G3 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| G1 | NA | Rs 50.76 cr | Rs 32.49 cr |
| G3 | NA | Rs 50.71 cr | Rs 36.78 cr |
| G2 | NA | Rs 50.50 cr | Rs 19.29 cr |
| - | NA | Rs 6.08 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Design and Concepts |
| Architect | Zeesan Khan |
| Engineer | Subhash Chandra Singh |
| Chartered Accountant | Dhawan & Co. |
| Chartered Accountant | M/s. Dipika Patel & Co. |
| Partner | Role in project |
|---|---|
| Ravi Developments | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was impacted by the COVID-19 outbreak in 2020 and 2021, and the subsequent slow market conditions and labour shortages made it difficult for us to complete the project on time. Therefore, we are requesting an extension of time within which the project shall be completed by the promoter to 31st December 2025.
Reason as filed by the promoter1. The Commencement Certificate (CC) granted in respect of the project was subsequently found to be erroneous. Consequently, all projects undertaken by Ravi Developments were restrained from proceeding further, resulting in unavoidable delay in the construction and completion of the project. 2. The Promoter has suffered severe financial constraints on account of adverse and unforeseen economic conditions prevailing in the Indian real estate sector, which have materially affected the execution of the project. 3. The overall slowdown in the real estate market, coupled with shortage of labour, si
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 266/2007 | Thane Court | Closed |
| 469/2014 | Thane Court | Closed |
| 163/2015 | Thane Court | Apperance |
| 05/2016 | Consumer Court | Hearing |
Complaints filed with MahaRERA17
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000012146 | Kirtan Gupta | RAVI DEVELOPMENTS | 25/11/2017 |
| CC006000000012633 | Rajiv Gupta | Ravi Developments | 28/12/2017 |
| CC006000000023479 | Arjumand shaikh | Ravi development | 15/03/2018 |
| CC006000000001880 | ARUN PARSHURAM VEER | RAVI DEVELOPMENTS | 13/11/2017 |
| CC006000000194838 | ARJUMAND FARUQUE SHAIKH | RAVI DEVELOPMENTS | 07/11/2020 |
| CC006000000396111 | Ashish Ashok Borana | Ravi Developments | 07/06/2023 |
| CC006000000397180 | Prashant Chaudhary | Jayesh Shah | 05/09/2023 |
| CC12502974 | Ravi Developments | Neetu Sohanlal Raj | 23/08/2025 |
| CC12502977 | Ravi Developments | Akhileshwar Thakor | 23/08/2025 |
| CC12503090 | Ravi Developments | Sindoor Mohandas Shetty | 03/09/2025 |
| CC12503875 | Seemab A Shaikhang | Ravi Developments | 05/11/2025 |
| CC12504206 | Ravi Developments | Rahul Pathak | 28/11/2025 |
| CC12600863 | JIGNASHA ROHIT SOLANKI | Ravi Developments | 16/02/2026 |
| CC12602119 | Ravi Developments | Nagula Gangadhar | 10/04/2026 |
| CC12603097 | Ravi Developments | Nikhil Thakkar | 25/05/2026 |
| CC12604293 | Muhammad Rashid Rafique Parekh | Ravi Developments | 09/07/2026 |
| CC12604356 | Mukesh Yadav | Ravi developers | 12/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed126
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Woods Ph II 2026-27 June 26 - Merged.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Woods Ph II 2026-27 June 26 -Merged.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Woods Ph II 2026-27 Q1.pdf | 5 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Woods Ph II 2025-26 March26 - Merged.pdf | 28 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Woods Ph II 2025-26 March 26 -Merged.pdf | 28 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Woods Ph II 2025-26 Q4.pdf | 28 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 5 25-26 Gaurav Woods Ph II.pdf | 16 Jun 2026 |
| Form 5 (FY 2025-2026)File: Form 5 25-26 Gaurav Woods Ph II.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Woods Ph II 2025-26 March26 - Merged.pdf | 2 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Woods Ph II 2025-26 March 26 -Merged.pdf | 2 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Woods Ph II 2025-26 Q4.pdf | 2 Jun 2026 |
| Form 5 (FY 2024-2025)File: Draft Form 5 24-25 Gaurav Woods Ph II.pdf | 11 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Woods Ph II 2024-25 march 2025.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Woods Ph II 2024-25 June 25 - Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Woods Ph II 2024-25 June 25 - Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Woods Ph II 2025-26 Sep 25 Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Woods Ph II 2025-26 Dec 25 - Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Woods Ph II 2025-26 June 25 -Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Woods Ph II 2025-26 June 25 -Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Woods Ph II 2025 26 September 25 Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Woods Ph II 2025-26 December 25 -Merged.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Woods Ph II 2023-24 Q3.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Woods Ph II 2023-24 Q3.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Woods Ph II 2025-26 Q2.pdf | 2 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Woods Ph II 2025-26 Q3.pdf | 2 Mar 2026 |
| Form 1File: Form 1 Architect Certificate Woods ABC March 2024 Merged.pdf | 26 Feb 2026 |
| Form 2File: Form 2 Woods Ph II 2023-24 March 2024 ABC Merged.pdf | 26 Feb 2026 |
| Form 3File: Form 3 Woods Ph II 2023-24 Q4.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Woods PH II Mar 24.pdf | 26 Feb 2026 |
| Form 1File: Form 1 Woods Ph II 2024-25 June 24 -merged.pdf | 26 Feb 2026 |
| Form 2File: Form 2 Woods Ph II 2024-25 June 24 Merged.pdf | 26 Feb 2026 |
| Form 3File: Form 3 Woods Ph II 2024-25 Q1.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Woods PH II June 2024.pdf | 26 Feb 2026 |
| Form 1File: Form 1 Woods Ph II 2024-25 Sep 24 -merged.pdf | 26 Feb 2026 |
| Form 2File: Form 2 Woods Ph II 2024-25 Sep 24 Merged.pdf | 26 Feb 2026 |
| Form 3File: Form 3 Woods Ph II 2024-25 Q2.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Woods PH II Sep 2024.pdf | 26 Feb 2026 |
| Form 1File: Form 1 Woods Ph II 2024-25 Dec 24 -Merged.pdf | 26 Feb 2026 |
| Form 2File: Form 2 Woods Ph II 2024-25 Dec 24 Merged.pdf | 26 Feb 2026 |
| Form 3File: Form 3 Woods Ph II 2024-25 Q3.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Woods PH II Dec 2024.pdf | 26 Feb 2026 |
| Form 1File: Form 1 Woods Ph II 2024-25 March 25 Merged.pdf | 26 Feb 2026 |
| Form 2File: Form 2 Woods Ph II 2024-25 March 25 Merged.pdf | 26 Feb 2026 |
| Form 3File: Form 3 Woods Ph II 2024-25 Q4.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Woods PH II March 2025.pdf | 26 Feb 2026 |
| Layout approvalFile: Woods Layout Plan.pdf | 13 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Woods Layout Plan.pdf | 13 Mar 2024 |
| Building plan approvalFile: Building Plan Approval G1, G3.PDF | 5 Mar 2024 |
| Building plan approvalFile: Building Plan Approval G2.pdf | 5 Mar 2024 |
| Building Plan Approval (IOD)File: Building Plan Approval G1, G3.PDF | 5 Mar 2024 |
| Building Plan Approval (IOD)File: Building Plan Approval G2.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Woods Architect Certificate Dec 2023.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Woods Inventory Disclosure dec 2023.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Woods Inventory Disclosure Nov 2023.pdf | 13 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2023-24 November.pdf | 13 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Woods June 2023.pdf | 10 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Woods Sept 2023.pdf | 10 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Woods Dec 2023.pdf | 10 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Woods PH II Dec 2023.pdf | 10 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2023-24 Q1.pdf | 8 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2023-24 Q2.pdf | 8 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2023-24 Q3.pdf | 8 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Gaurav Woods Declaration.pdf | 23 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2022-23 Q1.pdf | 23 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2022-23 Q2.pdf | 23 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2022-23 Q3.pdf | 23 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2022-23 Q4.pdf | 23 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Woods PH II.pdf | 11 Jan 2024 |
| CERSAI detailsFile: Gaurav Woods PH II CERSAI.pdf | 8 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Ketan Shah.pdf | 8 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Jayesh Shah.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23 Gaurav Woods Ph II.pdf | 2 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance Form 2A Gaurav Woods PH II.pdf | 31 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold inventory_Woods PH II.pdf | 29 Dec 2023 |
| Declaration in FORM BFile: Woods Form B.pdf | 27 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Woods A,B,C September 2023.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 Woods PH II 2017-18.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 Woods PH II 2018-19.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 Woods Ph II 2019-20.pdf | 24 Nov 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Gaurav Woods i | Mira Road East | 234 | Completed | Dec 2011 | Late, Mar 2012 |
| Gaurav Excellency I | Mira road east | 510 | Completed | Sep 2011 | Late, Mar 2012 |
| Gaurav Valley 2 | Mira road east | 197 | Completed | Feb 2010 | Feb 2010 |
| Gaurav Valley 1 | Mira Road East | 270 | Completed | Mar 2009 | Mar 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 126 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GAURAV WOODS II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Beverly Park Mira road7,600+ in Thane
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: Ravi Developments
Ravi Developments has 13 registrations on MahaRERA, including Gaurav Excellency and Gaurav Crest. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if GAURAV WOODS II is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GAURAV WOODS II?
The registered promoter entity is Ravi Developments, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GAURAV WOODS II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GAURAV WOODS II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GAURAV WOODS II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GAURAV WOODS II?
The professionals named in the filing: Architect: Design and Concepts; Architect: Zeesan Khan; Engineer: Subhash Chandra Singh; Chartered Accountant: Dhawan & Co.; Chartered Accountant: M/s. Dipika Patel & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GAURAV WOODS II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback