Home / Browse projects / Mumbai Suburban, Maharashtra / GAURAV SOCIETY

Registration lapsed No litigation declared Residential / Group Housing project

GAURAV SOCIETY

By PADMAVATI MAITRI CORPORATION LLP

RG-MH-39783 · RERA P51800013434 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 6 complaints at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
7 of 11Construction stages donefurthest along: Internal walls, 23%
60 of 75Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

GAURAV SOCIETY is a Residential / Group Housing project by PADMAVATI MAITRI CORPORATION LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800013434 on 5 Oct 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 30 months from the original filing. 15 of the 75 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameGAURAV SOCIETY
  • TypeResidential / Group Housing
  • Location
    • Haji Bapu Road
    • Malad (East)
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800013434
  • ReraGenie IDRG-MH-39783

Builder

  • NamePADMAVATI MAITRI CORPORATION LLP
  • Entity typePartnership
  • GSTIN27AAKFP2808F1Z9

Key dates

34 months past promisethis monthRegisteredOct 2017First promiseJun 2021Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Oct 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed68 files

Current status

20%15 of 75 units booked
122.2%Work done, per cost certificate

Figures as on 10 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAITRI GAURAV SOCIETY- Wing A and BNA151575075

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 23%.

MAITRI GAURAV SOCIETY- Wing A and B: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises23%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.17%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered62
Open Space2

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,488 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI4216.51
Proposed, not sanctioned2,698 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI WEST BRANCH
Estimated costRs 7.52 cr
Cost incurredRs 9.19 cr
Work done122.21%
BuildingWingEstimatedIncurred
MAITRI GAURAV SOCIETY- Wing A and BNARs 7.15 crRs 8.73 cr
-NARs 37.61 lakhRs 45.96 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectInd Architects
EngineerVishesh Shah
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantPratiksha Tulshyan & Associates
PartnerRole in project
PADMAVATI MAITRI CORPORATION LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010153Jun 2021 → Jun 2022

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain has broken down. It appears that it is going to take a lot of time to normalize the real estate industry.

EXT51800013488Jun 2021 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 54.55% allottees for purpose of extension of RERA registration period of the said project.

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000012802VARUN GOENKAAPURVA SHAH08/01/2018
CC006000000197959Malad Gaurav CHS LtdPadmavati Maitri Corporation15/08/2021
CC006000000197960Rakesh Jagdishchandra ShahPadmavati Maitri Corporation15/08/2021
CC006000000197961Shailesh V PatadiaPadmavati Maitri Corporation15/08/2021
CC12400513Jayshri Deepakbhai MagiyaPADMAVATI MAITRI CORPORATION LLP22/10/2024
CC12400527Jayshri Deepakbhai MagiyaPADMAVATI MAITRI CORPORATION LLP22/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf10 Jun 2026
Form 2File: Form 2 QPR.pdf10 Jun 2026
Form 3File: Form 3 QPR.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold booked.pdf10 Jun 2026
Form 2A (FY 2023-2024)10 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A 2023 24.pdf10 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 2023 24.pdf10 Jun 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf15 Feb 2025
Certificates of CA (Form 3)File: 13 Certificates of CA (Form 3).pdf15 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf15 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Gaurav Society as on Sep 2024.pdf11 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Gaurav Society as on Sep 2024.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Gaurav Society As on 31-03-2024.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Gaurav Society as on June 2024.pdf15 Oct 2024
Certificates of CA (Form 3)File: Form 3 Gaurav Society as on 30-06-2024.pdf11 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf16 Jul 2024
Certificates of CA (Form 3)File: 10 Certificates of CA (Form 3).pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Gaurav Society as on March 2024.pdf15 Jun 2024
Certificates of CA (Form 3)File: Form 3 - Gaurav Society as on March 2024.pdf15 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Gaurav Society as on Dec 2023.pdf23 Feb 2024
Certificates of CA (Form 3)File: Form 3 - Gaurav Society as on Dec 2023.pdf23 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gaurav Society June 23 - Form 2.pdf30 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Gaurav Society as on 30-09-2023.pdf30 Oct 2023
Certificates of CA (Form 3)File: Form 3 Gaurav Society as on 30-09-2023.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 as on FY 22-23- Gaurav Society.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Gaurav Society as on 2022-23_compressed.pdf18 Aug 2023
Certificates of CA (Form 3)File: Form 3- Gaurav Society as on 30-06-2023.pdf18 Aug 2023
Building plan approvalFile: Latest Layout Plan Approval.pdf17 Jun 2023
Building Plan Approval (IOD)File: Latest Layout Plan Approval.pdf17 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Gaurav Society as on March 2022.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Gaurav Society as on June 2022.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Gaurav Society as on September 2022.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Gaurav Society as on December 2022.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Gaurav Society as on March 2023.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Gaurav Society as on March 2022.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Gaurav Society as on June 2022.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Gaurav Society as on September 2022.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Gaurav Society as on 31-12-2022.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3- Gaurav Society as on 31-03-2023.pdf17 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certificates of CA (Form 5) (3).pdf28 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Gaurav Society FY 2019-2020_compressed.pdf28 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Gaurav Society FY 2020-21_compressed.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Padmavati.pdf29 Jun 2021
Declaration about Commencement CertificateFile: Gaurav Society.pdf25 Jun 2021
Disclosure of sold/ booked inventoryFile: Gaurav Society.pdf25 Jun 2021
Layout approvalFile: Plan 1 - Gaurav Society.pdf10 Jul 2020
Building plan approvalFile: Plan 2 Gaurav Society.pdf10 Jul 2020
Copy of Layout Approval (in case of layout)File: Plan 1 - Gaurav Society.pdf10 Jul 2020
Building Plan Approval (IOD)File: Plan 2 Gaurav Society.pdf10 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: 2126567Amendletter_signed (1).pdf10 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: CC upto 7th floor.pdf8 Jun 2019
Certificates of CA (Form 5)File: Form 5 - 18-19.pdf8 Jun 2019
Building plan approvalFile: IOD 1.pdf18 Sep 2017
Building plan approvalFile: IOD 2.pdf18 Sep 2017
Layout approvalFile: IOD 2.pdf18 Sep 2017
PAN CardFile: 2 pan card PMC.pdf18 Sep 2017
Copy of the legal title reportFile: Title Report.pdf18 Sep 2017
Details of encumbrancesFile: 3 encumb letter.pdf18 Sep 2017
Copy of Layout Approval (in case of layout)File: IOD 2.pdf18 Sep 2017
Building Plan Approval (IOD)File: IOD 1.pdf18 Sep 2017
Building Plan Approval (IOD)File: IOD 2.pdf18 Sep 2017
Declaration in FORM BFile: 1 form b reduced.pdf18 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Rera letter (ARCHITECT) reduced.pdf18 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 engineer certificate reduced.pdf18 Sep 2017
Certificates of CA (Form 3)File: 9 form 3 reduced.pdf18 Sep 2017
Proforma of Allotment letterFile: AFS Maitri Gaurav.pdf18 Sep 2017

How this compares with Mumbai Suburban

20%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 30 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAURAV SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad (East)6,700+ in Mumbai Suburban

2 kmGAURAV SOCIETYCompleted 140Lapsed / revoked 84Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 376 registered projects within 2 km.

Builder: PADMAVATI MAITRI CORPORATION LLP

PADMAVATI MAITRI CORPORATION LLP has 1 registration on MahaRERA, including GAURAV SOCIETY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that GAURAV SOCIETY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GAURAV SOCIETY is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAURAV SOCIETY?

The registered promoter entity is PADMAVATI MAITRI CORPORATION LLP, a partnership as per the filing. Its GSTIN 27AAKFP2808F1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAURAV SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GAURAV SOCIETY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GAURAV SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAURAV SOCIETY?

The professionals named in the filing: Architect: Ind Architects; Engineer: Vishesh Shah; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAURAV SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAURAV SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAURAV SOCIETY to a free account