Home / Browse projects / Pune, Maharashtra / GAURAV ICON TOWER
GAURAV ICON TOWER
By GAURAV ICON INFRATECH PRIVATE LIMITED
RG-MH-22712 · RERA P52100032040 · Last updated on MahaRERA portal: 3 Oct 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GAURAV ICON TOWER is a Commercial project by GAURAV ICON INFRATECH PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100032040 on 3 Dec 2021. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 10 of the 14 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameGAURAV ICON TOWER
- TypeCommercial
- Location
- -
- PUNE
- Wakad
- Mulshi
- 411057
- Pincode411057
- RERA no.P52100032040
- ReraGenie IDRG-MH-22712
Builder
- NameGAURAV ICON INFRATECH PRIVATE LIMITED
- Entity typeCompany
- CINU00500PN2006PTC022349
- GSTIN27AACCK8310L2ZD
- DirectorsVILAS LAXMAN LONDHE, PRADNYA PRASHANT WAGHMARE, GAURAV PRASHANT WAGHMARE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Dec 2021
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed82 files
Current status
Figures as on 3 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GAURAV ICON TOWER | NA | 17 | 14 | 0 | 14 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
GAURAV ICON TOWER: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed72
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MR PRASHANT MADHUKAR WAGHMARE | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prakash Kulkarni |
| Architect | Prakash Narsinhrao Kulkarni |
| Engineer | GAURAV PRASHANT WAGHMARE |
| Engineer | AKSHAY MOHIRE |
| Engineer | AKSHAY GAVALI |
| Chartered Accountant | PGP AND ASSOCIATES |
| Chartered Accountant | JUI JOSHI |
| Chartered Accountant | MAHESH GHARE |
| Partner | Role in project |
|---|---|
| GAURAV ICON INFRATECH PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Jan 2025
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form -2A.pdf | 3 Oct 2025 |
| Form 1File: Architech Certificate 310325.pdf | 7 Jun 2025 |
| Form 2File: Form 2 ( 310325 ) (1).pdf | 7 Jun 2025 |
| Form 3File: CA CERTIFICATE - FORM 3.pdf | 7 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 31032025.pdf | 7 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Architech Certificate 310325.pdf | 7 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: march 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: june 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: june 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: september 2024.pdf | 27 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: december 2024.pdf | 27 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Gaurav Icon Tower - Part OC.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 311224 gaurav icon tower.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: certificate 31 dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: inventory sold unsold311224.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 300624 (1).pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 300924 (1).pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold 30092024.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold unit 30062024.pdf | 8 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 7 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory sold unsold 31 march 24.pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate sept 23.pdf | 28 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate june 23 (1).pdf | 31 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate sept 23 (1).pdf | 31 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold june23.pdf | 26 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold sept 23.pdf | 26 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech cer june 23.pdf | 12 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate sept 23.pdf | 12 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form A2 june23 (1).pdf | 12 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form A2 sept 23 (1).pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 22.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 23.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold dec 22.pdf | 30 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Mar 23.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1 architech cer dec 22.pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1 architech certi March.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A SEPT 22.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A DEC 22.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A MARCH 23.pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1 dec22 Archirech certi.pdf | 28 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1 march 23 architech certificate.pdf | 28 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 eng certificate DEC 22.pdf | 28 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 eng certificate MARCH 23.pdf | 28 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Gaurav Icon Tower 31122022_compressed.pdf | 28 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Gaurav Icon Tower 31032023_compressed.pdf | 28 Sep 2023 |
| Building plan approvalFile: BPWAKAD912023.pdf | 4 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BPWAKAD912023.pdf | 4 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: commisment certificate.pdf | 4 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA certificate (3)_compressed.pdf | 22 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 Annual audit report.pdf | 22 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechs certificate GIT 300922.pdf | 18 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate GIT 300922.pdf | 18 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventory (2).pdf | 18 Oct 2022 |
| Layout approvalFile: HPSC5202_compressed.pdf | 1 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: HPSC5202_compressed.pdf | 1 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: new commencement_compressed.pdf | 1 Jun 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archirech's Certificate.pdf | 26 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf | 26 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory (2).pdf | 26 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate No 2_compressed.pdf | 26 Mar 2022 |
| Details of encumbrancesFile: No encumbrance.pdf | 15 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed (1).pdf | 15 Nov 2021 |
| Declaration about Commencement CertificateFile: Declaration about commencement.pdf | 15 Nov 2021 |
| Declaration in FORM BFile: Promoter Declaration.pdf | 15 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate_compressed.pdf | 15 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_compressed.pdf | 15 Nov 2021 |
| Layout approvalFile: Layout_compressed.pdf | 13 Nov 2021 |
| Building plan approvalFile: Plan_compressed.pdf | 13 Nov 2021 |
| Building plan approvalFile: PLan 2_compressed.pdf | 13 Nov 2021 |
| Building plan approvalFile: Lower basement plan_compressed.pdf | 13 Nov 2021 |
| Building plan approvalFile: 1st floor plan_compressed.pdf | 13 Nov 2021 |
| PAN CardFile: 2 Karantej Pancard.pdf | 13 Nov 2021 |
| Copy of the legal title reportFile: search title_compressed.pdf | 13 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf | 13 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_compressed.pdf | 13 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLan 2_compressed.pdf | 13 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Lower basement plan_compressed.pdf | 13 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 1st floor plan_compressed.pdf | 13 Nov 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep GAURAV ICON TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: GAURAV ICON INFRATECH PRIVATE LIMITED
GAURAV ICON INFRATECH PRIVATE LIMITED has 1 registration on MahaRERA, including GAURAV ICON TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that GAURAV ICON TOWER shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GAURAV ICON TOWER is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GAURAV ICON TOWER?
The registered promoter entity is GAURAV ICON INFRATECH PRIVATE LIMITED, a company as per the filing. Its CIN U00500PN2006PTC022349 and GSTIN 27AACCK8310L2ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GAURAV ICON TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GAURAV ICON TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GAURAV ICON TOWER?
The professionals named in the filing: Architect: Prakash Kulkarni; Architect: Prakash Narsinhrao Kulkarni; Engineer: GAURAV PRASHANT WAGHMARE; Engineer: AKSHAY MOHIRE; Engineer: AKSHAY GAVALI; Chartered Accountant: PGP AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GAURAV ICON TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback