Home / Browse projects / Thane, Maharashtra / GAURAV ASTER

Registered No litigation declared Residential / Group Housing project

GAURAV ASTER

By Ravi Developments

RG-MH-73250 · RERA P51700011796 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • 14 complaints at MahaRERA
  • Completion date moved by 96 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 96 months from the original
24 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 74%
2 of 76Units unsoldnot recorded sold or booked
14Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

GAURAV ASTER is a Residential / Group Housing project by Ravi Developments in Thane, Maharashtra, registered with MahaRERA as P51700011796 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 96 months from the original filing. 74 of the 76 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete. 14 complaints are on record with the regulator.

At a glance

Project

  • NameGAURAV ASTER
  • TypeResidential / Group Housing
  • Location
    • Vinay Nagar Rd
    • Kashimira
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700011796
  • ReraGenie IDRG-MH-73250

Builder

  • NameRavi Developments
  • Entity typePartnership
  • PartnerKetan Tokershi Shah
  • Other registrations12 more →
  • Completed3 of 13
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed112 files

Current status

97%74 of 76 units booked
122.3%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA181624024
B WINGNA191728028
C WINGNA181624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 74%.

A WING86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.74%
B WING86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.74%
C WING86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.74%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
A WING11
B WING11
C WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area582 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI8193.19
Proposed, not sanctioned8,193 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI WEST
Estimated costRs 36.25 cr
Cost incurredRs 44.33 cr
Work done122.3%
BuildingWingEstimatedIncurred
A WINGNARs 11.65 crRs 14.25 cr
B WINGNARs 11.65 crRs 14.25 cr
C WINGNARs 11.65 crRs 14.25 cr
-NARs 1.29 crRs 1.58 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH & ASSOCIATES
ArchitectDesign and Concepts
EngineerSubhash Chandra Singh
Chartered AccountantM/s. Dipika Patel & Co.
Chartered AccountantDhawan & Co.
Chartered AccountantHardik Choudhary & Associates
PartnerRole in project
Ravi Developments-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700011362Dec 2018 → Dec 2022

Reason as filed by the promoterWE HAVE TO APPLY ONLY FOR THE OCCUPATION CERTIFICATE FROM THE MIRA BHAYANDER MUNICIPAL CORPORATION. THE BUILDING IS READY FOR POSSESSION.

EXT51700002069Dec 2018 → Apr 2020

Reason as filed by the promoterThe CC from the MBMC , which we have revised and applied again with MBMC on Jan 2016, has been further delay , and hence we need to extend the completion date.

EXT51700017841Dec 2018 → Dec 2025

Reason as filed by the promoterThe allotees residing from floors 1 to 10 have been delaying the process of construction of the upper floors, i.e from floor 11 and onwards.

EA03042620548Dec 2018 → Dec 2026

Reason as filed by the promoter1.The Commencement Certificate (CC) granted in respect of the project was subsequently found to be erroneous. Consequently, all projects undertaken by Ravi Developments were restrained from proceeding further, resulting in unavoidable delay in the construction and completion of the project. 2.The Promoter has suffered severe financial constraints on account of adverse and unforeseen economic conditions prevailing in the Indian real estate sector, which have materially affected the execution of the project. 3. The overall slowdown in the real estate market, coupled with shortage of labour, sign

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC006000000001337Kirit SoniRavi Developments22/10/2017
CC006000000012041SANJEEV SHARMARAVI DEVELOPERS27/03/2019
CC006000000012332Sher Singh Balbir Singh ChilotraJayesh T shah.and ketan T shah11/01/2018
CC006000000012372Suryadas GuruduRavi Developments10/12/2017
CC006000000022861HARMEET SINGH CHILOTRARavi Development11/01/2018
CC006000000057310ROHIT KOTNIS &MAITHLI KOTNISRAVI DEVELOPMENTS14/12/2018
CC006000000078618Gaurav Aster CHS LtldRavi Developments29/03/2019
CC006000000079309Rakhi M RajM/s. Ravi Developments17/05/2019
CC006000000079310Rekha Ramkishan VermaM/s. Ravi Developments17/05/2019
CC006000000090159Hingwala Sufiyan Mohamed YusufM/S Ravi Developments14/08/2019
CC006000000292787KAJAL THAKURRAVI DEVELOPMENTS28/09/2022
CC006000000396854Ashish Ramjeet Pandey and Asha Ramjeet PandeyRavi Developments28/07/2023
CC006000000591186Alka Jaikishin HarjaniRavi Developments16/07/2024
CC12602515Ravi DevelopmentsAshok Ramanlal Barot29/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 May 2022

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate Aster march 26.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Gaurav Aster march 26.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3 Gaurav Aster 25-26 Q3.pdf8 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 (2025-26) Gaurav Aster.pdf8 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A Aster 24-25 March 2025.pdf6 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A Aster 23-24 March 2024.pdf6 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 (2024-25) Gaurav Aster.pdf6 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 (2023-24) Gaurav Aster.pdf6 Apr 2026
Form 1File: Form 1 Architect Certificate Aster March 24.pdf4 Apr 2026
Form 2File: Form 2 Engineer Certificate Gaurav Aster March 24.pdf4 Apr 2026
Form 3File: Form 3 Gaurav Aster Q4 2023-24.pdf4 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Aster March 2024.pdf4 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Aster June 25.pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Aster Sept 25.pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Aster Dec 25.pdf3 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Gaurav Aster JUNE 25.pdf3 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Gaurav Aster SEPT 25.pdf3 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Gaurav Aster DEC 25.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 Gaurav Aster 25-26 Q1.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 Gaurav Aster 25-26 Q2.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 Gaurav Aster 25-26 Q3.pdf3 Apr 2026
Form 1File: Form 1 Architect Certificate Aster June 24.pdf2 Apr 2026
Form 2File: Form 2 Engineer Certificate Gaurav Aster JUNE 24.pdf2 Apr 2026
Form 3File: Form 3 Gaurav Aster 24-25 Q1.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Excellency June 2024.pdf2 Apr 2026
Form 1File: Form 1 Architect Certificate Aster Sept 24.pdf2 Apr 2026
Form 2File: Form 2 Engineer Certificate Gaurav Aster SEPT 24.pdf2 Apr 2026
Form 3File: Form 3 Gaurav Aster 24-25 Q2.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Excellency Sep 2024.pdf2 Apr 2026
Form 1File: Form 1 Architect Certificate Aster Dec 24.pdf2 Apr 2026
Form 2File: Form 2 Engineer Certificate Gaurav Aster DEC 24.pdf2 Apr 2026
Form 3File: Form 3 Gaurav Aster 24-25 Q3.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Excellency Dec 2024.pdf2 Apr 2026
Form 1File: Form 1 Architect Certificate Aster March 25.pdf2 Apr 2026
Form 2File: Form 2 Engineer Certificate Gaurav Aster MARCH 25.pdf2 Apr 2026
Form 3File: Form 3 Gaurav Aster 24-25 Q4.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory_Excellency March 2025.pdf2 Apr 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Aster A,B,C September 2023.pdf24 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Jayesh Shah.pdf17 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Aster Form 5 22-23.pdf6 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance [2A] Gaurav Aster.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Gaurav Aster 17-18.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Gaurav Aster 18-19.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Gaurav Aster 19-20.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Gaurav Aster 20-21.pdf20 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Ketan Shah.pdf19 Oct 2023
Certificates of CA (Form 3)File: Aster Form 3 17-18.pdf18 Oct 2023
Certificates of CA (Form 3)File: Aster Form 3 18-19.pdf18 Oct 2023
Certificates of CA (Form 3)File: Aster Form 3 19-20.pdf18 Oct 2023
Certificates of CA (Form 3)File: Aster Form 3 20-21.pdf18 Oct 2023
Certificates of CA (Form 3)File: Aster Form 3 21-22.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Gaurav Aster 21-22.pdf18 Oct 2023
Details of encumbrances concerned to FinanceFile: Aster Decelaration legal 23.pdf20 Apr 2023
Details of encumbrances concerned to FinanceFile: Aster Decelaration Finance 23.pdf20 Apr 2023
Details of encumbrances concerned to LegalFile: Aster Decelaration legal 23.pdf20 Apr 2023
Details of encumbrances concerned to LegalFile: Aster Decelaration Finance 23.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aster A Arc.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aster B Arc.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aster C Arc.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aster A Engg.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aster B Engg.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aster C Engg.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Aster QA 1920.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Aster QA 2021.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aster QA 2122.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aster QA 2122.pdf20 Apr 2023
CERSAI detailsFile: Aster Undertakinf for CERSAI 23.pdf20 Apr 2023
Declaration about Commencement CertificateFile: Aster cc.pdf31 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ArchitectCertificate.pdf28 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc letter.pdf28 May 2022
OtherFile: Engineer Certificate 2021.pdf28 May 2022
Declaration about Commencement CertificateFile: Format D.pdf12 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate.pdf12 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate 2021.pdf12 May 2022
CERSAI detailsFile: Undertaking Gaurav Aster.pdf12 May 2022
Disclosure of sold/ booked inventoryFile: Building Aster Sold-Unsold Inventary.pdf12 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Adobe Scan Mar 17, 2022.pdf12 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Aster Form 5 2020-21.pdf12 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Aster - A WING.pdf29 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gaurav Aster - B WING.pdf29 Mar 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Gaurav Woods iMira Road East234CompletedDec 2011Late, Mar 2012
Gaurav Excellency IMira road east510CompletedSep 2011Late, Mar 2012
Gaurav Valley 2Mira road east197CompletedFeb 2010Feb 2010
Gaurav Valley 1Mira Road East270CompletedMar 2009Mar 2009

How this compares with Thane

97%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 96 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAURAV ASTER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kashimira7,600+ in Thane

2 kmGAURAV ASTERCompleted 88Lapsed / revoked 67Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: Ravi Developments

Ravi Developments has 13 registrations on MahaRERA, including Gaurav Excellency and Gaurav Crest. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GAURAV ASTER is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAURAV ASTER?

The registered promoter entity is Ravi Developments, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAURAV ASTER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GAURAV ASTER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GAURAV ASTER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAURAV ASTER?

The professionals named in the filing: Architect: ANISH & ASSOCIATES; Architect: Design and Concepts; Engineer: Subhash Chandra Singh; Chartered Accountant: M/s. Dipika Patel & Co.; Chartered Accountant: Dhawan & Co.; Chartered Accountant: Hardik Choudhary & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAURAV ASTER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAURAV ASTER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAURAV ASTER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.