Gaondevi Crown
RG-MH-30788 · RERA P51700031502 · Last updated on MahaRERA portal: 5 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gaondevi Crown is a Others project by GOPAL KRISHNA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700031502 on 25 Oct 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 95 of the 168 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameGaondevi Crown
- TypeOthers
- Location
- Goandevi Road
- Kalyan East
- Tisgaon
- Kalyan
- Thane
- 421306
- Pincode421306
- RERA no.P51700031502
- ReraGenie IDRG-MH-30788
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Oct 2021
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2026)
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 5 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gaondevi Crown | NA | 22 | 21 | 168 | 0 | 168 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 68%.
Gaondevi Crown: 65% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed71
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Datta Govind Gaikwad | Tisgaon | Thane |
| Pandurang Govind Gaikwad | Tisgaon | Thane |
| Vishnu Govind Gaikwad | Tisgaon | Thane |
| Bharat Govind Gaikwad | Tisgaon | Thane |
| Jayvant Govind Gaikwad | Tisgaon | Thane |
| Bhagwan Govind Gaikwad | Tisgaon | Thane |
| Gajanan Govind Gaikwad | Tisgaon | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Gaondevi Crown | NA | Rs 34.13 cr | Rs 25.60 cr |
| - | NA | Rs 2.10 cr | Rs 1.57 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | De Con Consultants |
| Architect | UP Creation |
| Engineer | Sandeep Khandode |
| Engineer | INFINITY GROW DESIGN CONSULTANT LLP |
| Chartered Accountant | Pooja Jain |
| Chartered Accountant | Darshan Thakkar |
| Partner | Role in project |
|---|---|
| GOPAL KRISHNA DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project completion has been delayed due to circumstances beyond the control of the promoter. The project was adversely affected by delays in statutory approvals, disruption in availability of labor and construction materials, and interruptions caused by external factors. In addition, unforeseen administrative and operational challenges impacted the planned construction schedule. Despite these difficulties, the promoter has continued construction activities and remains fully committed to completing the project at the earliest. The extension is sought to ensure timely completion with require
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTICATE - CROWN-QTR-1- 2026-27.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTICATE - CROWN-QTR-1- 2026-27.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: crown ca certifivcate 4th qtr 25-26.pdf | 5 Aug 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTICATE - CROWN-QTR-1- 2026-27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTICATE - CROWN-QTR-1- 2026-27.pdf | 31 Jul 2026 |
| Withdrawal Update Form 3File: crown ca certifivcate 4th qtr 25-26.pdf | 31 Jul 2026 |
| Building plan approvalFile: Plan_compressed.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: crown architect 4th qtr 25-26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: crown engineer 4th qtr 25-26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: crown ca certifivcate 4th qtr 25-26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: crown architect ceirtificate third qtr-25-26.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: crown engineer second qtr 25-26.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: crown ca ceirtificate third qtr 25-26.pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Crown.pdf | 27 Nov 2025 |
| Withdrawal Update Form 1File: crown architect second qtr 25-26.pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Crown.pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: crown engineer second qtr 25-26.pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Crown.pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: crown ca certificte second qtr 25-26.pdf | 27 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Crown Mar 25.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Crown Mar 25 (1).pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Crown Mar 25.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Goandevi Dec 24.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Goandevi Dec 24.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Goandevi Dec 24.pdf | 27 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Crown 23-24.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Goandevi Crown.pdf | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Goandevi Crown (1).pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Goandevi Crown.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Crown.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Crown.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Crown (1).pdf | 24 Jul 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale (2).pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate G-Crown.pdf | 10 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate G-Crown.pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Certificate G-Crown (1).pdf | 10 May 2024 |
| Details of encumbrancesFile: Encumbrance Letter Crown.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CROWN ARCHITECTS CERTIFICATE.pdf | 2 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CROWN ENGINEERS CERTIFICATE.pdf | 2 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CROWN CA CERTIFICATE (1).pdf | 2 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Crown 22-23.pdf | 2 Feb 2024 |
| Layout approvalFile: Revise Plan Goandevi Crown (1) (1).pdf | 10 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Revise Plan Goandevi Crown (1) (1).pdf | 10 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Revise CC Goandevi Crown (1).pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Crown ( Sep 23).pdf | 10 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Crown ( Sep 23).pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Crown (Sep 23).pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 GC June 23.pdf | 12 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 GC June 23.pdf | 12 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GC June 23.pdf | 12 Aug 2023 |
| Declaration about Commencement CertificateFile: Form D - Emerald Pacific.pdf | 8 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf | 8 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Gaondevi Crown_1 (3 files merged).pdf | 8 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (1).pdf | 29 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf | 29 Jun 2023 |
| Details of encumbrancesFile: Encumbernce Letter.pdf | 24 Jun 2023 |
| Layout approvalFile: REVISED PLAN Highlight Changes value.pdf | 27 May 2023 |
| Copy of Layout Approval (in case of layout)File: REVISED PLAN Highlight Changes value.pdf | 27 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Gaondevi Crown Revise CC.pdf | 27 May 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 27 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf | 27 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 27 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A (1).pdf | 27 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (2).pdf | 27 May 2023 |
| Layout approvalFile: Goandevi Crown Revise Plan.pdf | 8 May 2023 |
| Copy of Layout Approval (in case of layout)File: Goandevi Crown Revise Plan.pdf | 8 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Gaondevi Crown Revise CC.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A Crown.pdf | 8 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 8 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 Crown.pdf | 8 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 3 May 2023 |
| Disclosure of sold/ booked inventoryFile: Desclosure of Sold Unsold Inventory.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 3 May 2023 |
| Other - TechnicalFile: format c crown.pdf | 3 May 2023 |
| Layout approvalFile: REVISED PLAN 10 FLOR (1).pdf | 24 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: REVISED PLAN 10 FLOR (1).pdf | 24 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISE CC 10 FLR.pdf | 24 Mar 2023 |
| Copy of the legal title reportFile: Title Carrtificate Goandevi.pdf | 23 Oct 2021 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KRISHNA PARADISE PHASE I | 100 FT ROAD TISGAON KALYAN EAST | 236 | Completed | May 2016 | Late, Jul 2017 |
| KRISHNA HEIGHT | 100FT ROAD TISGAON KALYAN EAST | 154 | Completed | Jan 2016 | Late, May 2016 |
| GOPAL KRISHNA PARK PHASE II | HAJI MALANG ROAD KALYAN EAST | 83 | Completed | Jun 2007 | Late, Jul 2008 |
| GOPAL KRISHNA PARK PHASE I | 100 FT ROAD TISGAON KALYAN EAST | 196 | Completed | Dec 2004 | Late, Dec 2004 |
| RADHE KRISHNA PARK | HAJI MALANG ROAD | 196 | Completed | Apr 2004 | Apr 2004 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gaondevi Crown on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalyan East7,600+ in Thane
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: GOPAL KRISHNA DEVELOPERS
GOPAL KRISHNA DEVELOPERS has 5 registrations on MahaRERA, including KRISHNA NISARGA and KRISHNA PARADISE. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Gaondevi Crown is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gaondevi Crown?
The registered promoter entity is GOPAL KRISHNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gaondevi Crown?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gaondevi Crown?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gaondevi Crown?
The professionals named in the filing: Architect: De Con Consultants; Architect: UP Creation; Engineer: Sandeep Khandode; Engineer: INFINITY GROW DESIGN CONSULTANT LLP; Chartered Accountant: Pooja Jain; Chartered Accountant: Darshan Thakkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gaondevi Crown?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback