Home / Browse projects / Palghar, Maharashtra / GANGOTRI HEIGHTS
GANGOTRI HEIGHTS
By SHREE YOGI BUILDERS & DEVELOPER
RG-MH-66686 · RERA P99000033448 · Last updated on MahaRERA portal: 2 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGOTRI HEIGHTS is a Residential / Group Housing project by SHREE YOGI BUILDERS & DEVELOPER in Palghar, Maharashtra, registered with MahaRERA as P99000033448 on 22 Feb 2022. Possession is promised by 31 Dec 2028. 79 of the 156 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameGANGOTRI HEIGHTS
- TypeResidential / Group Housing
- Location
- phoolpada Road
- Virar East
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401305
- Pincode401305
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000033448
- ReraGenie IDRG-MH-66686
Builder
- NameSHREE YOGI BUILDERS & DEVELOPER
- Entity typePartnership
- PartnersSudesh Prabhakar Chaudhari, Poonam Prabhakar Vartak
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Feb 2022
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed68 files
Current status
Figures as on 2 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GANGOTRI HCEIGHTS - Wings A,B,C | NA | 8 | 8 | 156 | 0 | 156 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
GANGOTRI HCEIGHTS - Wings A,B,C: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership10
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Manoj Anant Patil | Vasai-Virar City (M Corp) | Palghar |
| Rama Anant Patil | Vasai-Virar City (M Corp) | Palghar |
| Jayant Chintaman Patil | Vasai-Virar City (M Corp) | Palghar |
| Mohan Chintaman Patil | Vasai-Virar City (M Corp) | Palghar |
| Kalpana Anant Patil | Vasai-Virar City (M Corp) | Palghar |
| Bahavana Mohan Vartak | Mahim | Palghar |
| Gulab Rambhau Patil | Vasai-Virar City (M Corp) | Palghar |
| Sadhana Kishor Mhatre | Vasai-Virar City (M Corp) | Palghar |
| Tanuja Milind Kawali | Andheri | Mumbai Suburban |
| Mahesh Rambhau Patil | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GANGOTRI HCEIGHTS - Wings A,B,C | NA | Rs 20.57 cr | Rs 16.05 cr |
| - | NA | Rs 1.50 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KULDEEP B PATIL |
| Engineer | Satish B Kemkar |
| Engineer | Mohammad S Bhati |
| Engineer | Siddhesh M Gawde |
| Chartered Accountant | Kalpak Laxman Churi |
| Chartered Accountant | MISHRA MAYEKAR & CO. |
| Partner | Role in project |
|---|---|
| SHREE YOGI BUILDERS & DEVELOPER | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Shree Yogi QRTR 4.pdf | 2 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Shree yogi QRTR 4.pdf | 2 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Yogi QRTR 4.pdf | 2 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Shree Yogi QRTR 3.pdf | 21 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Shree Yogi QRTR 3.pdf | 21 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Yogi QRTR 3.pdf | 21 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 2nd QRTR Shree yogi.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 2nd QRTR Shree yogi.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 2nd QRTR sHREE YOGI.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 2nd QRTR sHREE YOGI.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Form 2nd QRTR 2025 Shree yogi.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Form 2nd QRTR 2025 Shree yogi.pdf | 13 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 2024-25 Shree Yogi.pdf | 31 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A shree yogi Bldrs.pdf | 6 Oct 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ShreeYogi March 2025.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY SHREE YOGI.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHREE YOGI (2).pdf | 4 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 December 2024 Shree Yogi_compressed.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory Shree Yogi.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 shree yogi25.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 shree yogi 25.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shree yogi (2)_compressed.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shree yogi.pdf | 25 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 shree yogi.pdf | 25 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 yogi builders.pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 YOGI.pdf | 31 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 YOGI.pdf | 31 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YOGI.pdf | 31 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YOGI.pdf | 31 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTRY YOGI.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree yogi_compressed.pdf | 24 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A shree yogi 1.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SHREE YOGI.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 1 yogi.pdf | 23 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shree Yogi bldrs.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree Yogi bldrs.pdf | 8 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Isold a wing_merged.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 shree yogi bldrs.pdf | 20 Oct 2023 |
| Layout approvalFile: LAY OUT SHEET 1 YOGI.pdf | 6 Sep 2023 |
| Building plan approvalFile: BLDG PLAN SHEET 2 YOGI.pdf | 6 Sep 2023 |
| Building plan approvalFile: BLDG PLAN SHEET 3 YOGI.pdf | 6 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: LAY OUT SHEET 1 YOGI.pdf | 6 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN SHEET 2 YOGI.pdf | 6 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG PLAN SHEET 3 YOGI.pdf | 6 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 2022-23 SHREE YOGI.pdf | 5 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: ilovepdf_merged.pdf | 5 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: sold inventory shree yogi.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 shree yogi.pdf | 3 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 shree yogi_compressed.pdf | 2 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 shree yogi_compressed.pdf | 2 May 2023 |
| Proforma of Agreement for saleFile: RERA SALES AGREEMENT.pdf | 15 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: MAHARERA RVD SHREE YOGI FINAL.pdf | 16 Sep 2022 |
| Proforma of Allotment letterFile: SALES AGREEMENT SHREE YOGI 01042022.pdf | 1 Apr 2022 |
| Copy of the legal title reportFile: RERA Development shree yogi.pdf | 18 Feb 2022 |
| Layout approvalFile: RERA LAYOUT SHREE YOGI.pdf | 17 Feb 2022 |
| Building plan approvalFile: RERA Bld plan shree yogi.pdf | 17 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: RERA LAYOUT SHREE YOGI.pdf | 17 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: RERA Bld plan shree yogi.pdf | 17 Feb 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200230306299_For_Asset_Based_Search_16_02_2022_10_01_16_827.pdf | 17 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA 3.pdf | 13 Feb 2022 |
| Proforma of Allotment letterFile: RERA SALES AGREEMENT.pdf | 13 Feb 2022 |
| PAN CardFile: pancard shree yogi.pdf | 4 Feb 2022 |
| Details of encumbrancesFile: Rera non-incumbrance.pdf | 4 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: RERA CC FINAL.pdf | 4 Feb 2022 |
| Declaration about Commencement CertificateFile: Rera CC dcelaration.pdf | 4 Feb 2022 |
| Declaration in FORM BFile: Form B promoter affidavit.pdf | 4 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech.pdf | 4 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginerr.pdf | 4 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GANGOTRI HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Virar East3,200+ in Palghar
Filed coordinates, straight-line distance. 137 registered projects within 2 km.
AV PEARL BLDG NO.4 WING BCD
AVM BUILDCON LLP
HARI RESIDENCY PHASE I
LOTUS LAKSHMINARAYAN HOMES
Mrida Innovista Homes
NINE MEGACORP DEVELOPERS LLP
AV PEARL BUILDING NO. 3, C WING
AVM BUILDCON LLP
MJV CORPORATION
VYANKATI CHINNAVISHRWAPAPA SAMAKOTI
AV PEARL BUILDING NO. 3, WING B
SHREE SAI JIVDANI DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: SHREE YOGI BUILDERS & DEVELOPER
SHREE YOGI BUILDERS & DEVELOPER has 1 registration on MahaRERA, including GANGOTRI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if GANGOTRI HEIGHTS is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGOTRI HEIGHTS?
The registered promoter entity is SHREE YOGI BUILDERS & DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGOTRI HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GANGOTRI HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGOTRI HEIGHTS?
The professionals named in the filing: Architect: KULDEEP B PATIL; Engineer: Satish B Kemkar; Engineer: Mohammad S Bhati; Engineer: Siddhesh M Gawde; Chartered Accountant: Kalpak Laxman Churi; Chartered Accountant: MISHRA MAYEKAR & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGOTRI HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback