GANGA UTOPIA E BUILDING
By GOEL GANGA DEVELOPMENTS LLP
RG-MH-13209 · RERA P52100022453 · Last updated on MahaRERA portal: 4 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 4 cases
- 3 complaints at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANGA UTOPIA E BUILDING is a Residential / Group Housing project by GOEL GANGA DEVELOPMENTS LLP in Pune, Maharashtra, registered with MahaRERA as P52100022453 on 24 Sep 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 160 of the 162 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameGANGA UTOPIA E BUILDING
- TypeResidential / Group Housing
- Location
- 5 BUND GARDEN ROAD
- PUNE CAMP
- Pune (M Corp.)
- Pune City
- Pune
- 411001
- Pincode411001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100022453
- ReraGenie IDRG-MH-13209
Builder
- NameGOEL GANGA DEVELOPMENTS LLP
- Entity typePartnership
- PartnerANURAG SUBHASH GOEL
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Sep 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed95 files
Current status
Figures as on 4 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E BUILDING | NA | 26 | 0 | 162 | 0 | 162 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.
E BUILDING: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Progress on shared amenities15
As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 98% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 94% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed199
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| E BUILDING | NA | Rs 37.83 cr | Rs 37.83 cr |
| - | NA | Rs 2.21 cr | Rs 2.21 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIJAY MALVE |
| Engineer | Z A BEKINALKAR |
| Engineer | C D TENDULKAR |
| Engineer | MILIND WANKHEDE |
| Chartered Accountant | MAHESH CHANDORKAR |
| Chartered Accountant | Atul Hattarge |
| Partner | Role in project |
|---|---|
| GOEL GANGA DEVELOPMENTS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. 80% Percentage of the project is completed. 2. Part OC is received from Pune municipal corporation vide letter no. OCC/0056/25 for 132 units. Possession of the same is given. 3. Part OC is uploaded in Other Tab 11 and main application. 4. Possession letters are uploaded from Tab 2 to Tab 7. 5. Revised Form B uploaded in other Tab 9 and main application.
Litigation declared4
| Case | Court | Status |
|---|---|---|
| RTS/2/A/875/2021/2021 | Add. Collector | Closed |
| 0/2025 | Hon'ble Debts Recovery Appellate Tribunal, Mumbai | Closed |
| CIVIL M.A. 381/2024/2024 | 69-DISTRICT JUDGE-2 AND ADDL. SESSIONS JUDGE, PUNE | Ongoing |
| SA/ 536/2025/2025 | DRT, Pune | Ongoing |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502340 | Kshitij Bhayyasaheb Godbole | GOEL GANGA DEVELOPMENTS LLP | 10/07/2025 |
| CC12601064 | HEMANT PRAKASHRAO DIWARE | GOEL GANGA DEVELOPMENTS LLP | 26/02/2026 |
| CC12602069 | Nilesh S Kshirsagar | GOEL GANGA DEVELOPMENTS LLP | 08/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Sep 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Sep 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 GANGA UTOPIA E JUN 26.pdf | 4 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 GANGA UTOPIA E JUN 26.pdf | 4 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 GANGA UTOPIA E JUN 26.pdf | 4 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1 GANGA UTOPIA E MAR 26.pdf | 6 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 GANGA UTOPIA E MAR 26.pdf | 6 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 GANGA UTOPIA E MAR 26.pdf | 6 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 GANGA UTOPIA E BLDG DEC 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 GANGA UTOPIA E DEC 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 GANGA UTOPIA E BLDG DEC 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCH CERT GANGA UTOPIA E JUN 25.pdf | 6 Dec 2025 |
| Withdrawal Update Form 2File: FORM 2 ER CERT-GANGA UTOPIA E JUN 25.pdf | 6 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERT GANGA UTOPIA E JUN 25.pdf | 6 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 GANGA UTOPIA E SEP 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCH CERT GANGA UTOPIA E JUN 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 GANGA UTOPIA E SEP 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 ER CERT-GANGA UTOPIA E JUN 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 GANGA UTOPIA E SEP 25.pdf | 1 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERT GANGA UTOPIA E JUN 25.pdf | 1 Nov 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A GANGA UTOPIA 2024-25.pdf | 1 Nov 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 GANGA UTOPIA E 2024-25.pdf | 1 Nov 2025 |
| Form 1File: FORM 1 GANGA UTOPIA E SEP 25.pdf | 15 Oct 2025 |
| Form 2File: FORM 2 GANGA UTOPIA E SEP 25.pdf | 15 Oct 2025 |
| Form 3File: FORM 3 GANGA UTOPIA E SEP 25.pdf | 15 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED GANGA UTOPIA E SEP 25.pdf | 15 Oct 2025 |
| Declaration in FORM BFile: FORM B.pdf | 24 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A GANGA UTOPIA 2024-25 (2).pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E MAR 23.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E JUN 23.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E SEP 23.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E DEC 23.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E MAR 24.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E JUN 24.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E SEP 24.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E DEC 24.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E MAR 25.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERT GANGA UTOPIA E JUN 25.pdf | 21 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E JUN 23.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E SEP 23.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E DEC 23.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E MAR 24.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E JUN 24.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E SEP 24.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E DEC 24.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E MAR 25.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E JUN 25.pdf | 18 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT GANGA UTOPIA E MAR 23.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sep 24.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 24.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june 25.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: march 25.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 24.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: march 24.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec 23 (1).pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep 23.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june 23.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: march23.pdf | 18 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june 24.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA DEC 23.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA JUN 25.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA MAR 25.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA DEC 24.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA SEP 24.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA JUN 24.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA MAR 24.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA SEP 23.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA JUN 23.pdf | 18 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSLOLD DISCLOSURE GANGA UTOPIA MAR 23.pdf | 18 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A GANGA UTOPIA E 2023-24.pdf | 18 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 GANGA UTOPIA E 2023-24.pdf | 18 Jul 2025 |
| OtherFile: Form 4 Arch Certificate Ganga Utopia E.pdf | 19 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_GGDLLP_Ganga Utoipa_2019.pdf | 13 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_GGDLLP_Ganga Utropia E_2020.pdf | 13 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_GGDLLP_Ganga Utropia E_2021.pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GGDLLP_Utopia E_Form 5 2020.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GGDLLP_Utopia E_Form 5 2021.pdf | 13 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GGDLLP_Utopia_E_Form 5 2022.pdf | 24 Jan 2023 |
| Proforma of Allotment letterFile: Unit Agreemnt-Ganga Utopia E- Building-revised-17-12-2019.pdf | 18 Dec 2019 |
| Proforma of Allotment letterFile: P7095-UNIT AGR-GANGA UTOPIA E BUILDING-27-11-2019.pdf | 27 Nov 2019 |
| Proforma of Allotment letterFile: P7095-UNIT AGR-GANGA UTOPIA E BUILDING-19th NOV 2019-clear-copy.pdf | 26 Nov 2019 |
| Building plan approvalFile: Building Approved Plans (1).pdf | 20 Sep 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GANGA UTOPIA E BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE CAMP13,700+ in Pune
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
HUES OF SKY
Bramhacorp Limited
Birla Punya Phase II
Birla Estates Private Limited
Birla Punya Phase 1
Birla Estates Private Limited
BOULEVARD TOWER A2
Bramhacorp Limited
One Place-Bund Garden Road
TOPSPACE LANDMARKS LLP
Eternia Phase 2
VENTURESPRO PROJECTS LLP
Builder: GOEL GANGA DEVELOPMENTS LLP
GOEL GANGA DEVELOPMENTS LLP has 2 registrations on MahaRERA, including GANGA UTOPIA COMMERCIAL and GANGA UTOPIA E BUILDING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GANGA UTOPIA E BUILDING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANGA UTOPIA E BUILDING?
The registered promoter entity is GOEL GANGA DEVELOPMENTS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANGA UTOPIA E BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GANGA UTOPIA E BUILDING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GANGA UTOPIA E BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANGA UTOPIA E BUILDING?
The professionals named in the filing: Architect: VIJAY MALVE; Engineer: Z A BEKINALKAR; Engineer: C D TENDULKAR; Engineer: MILIND WANKHEDE; Chartered Accountant: MAHESH CHANDORKAR; Chartered Accountant: Atul Hattarge. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANGA UTOPIA E BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback