ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Ganga Business Tower

Registered No litigation declared Commercial project

Ganga Business Tower

By ROYAL METROVILLE VENTURE

RG-MH-92893 · RERA P52100054918 · Last updated on MahaRERA portal: 14 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 65%
24 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Ganga Business Tower is a Commercial project by ROYAL METROVILLE VENTURE in Pune, Maharashtra, registered with MahaRERA as P52100054918 on 21 Feb 2024. Possession is promised by 31 Jul 2027. 13 of the 37 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameGanga Business Tower
  • TypeCommercial
  • Location
    • Balewadi Road
    • Near NICMAR Institute
    • Balewadi
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054918
  • ReraGenie IDRG-MH-92893

Builder

  • NameROYAL METROVILLE VENTURE
  • Entity typeOthers
  • MembersRoyal Vastuparv LLP LLP, Rohit Shinde Dhanaji, Prashant Chavan Arun, Ashok Sudrik HUF Bajirao, Jayshree Sudrik Sudrik, Yogita Divekar Divekar

Key dates

this monthRegisteredFeb 2024PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion31 Jul 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed87 files

Current status

35%13 of 37 units booked
19.9%Work done, per cost certificate

Figures as on 14 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building AA5502020
Building BB10801717

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 65%.

Building A · wing A38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises38%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%
Building B · wing B36%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks32%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed221

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots221
Closed/Covered177
Open Space44
BuildingClosed/CoveredOpen SpaceTotal
Building A A51217
Building B B17232204

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,150 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025
LandownerVillageDistrict
Saikiran Infra Projects LLPNavi Mumbai (M Corp.)Thane
Manojkumar BalwadkarBalewadiPune
Rajesh BalwadkarBalewadiPune
Rakesh Shrivastava-Purbi Singhbhum
Saket Sinha-Allahabad
Laliteshwar Prasad Sinha-Allahabad

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI4119.8
Proposed, not sanctioned4,057 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNandadeep Apartments, CTS no 1195/1, FP No 551/1, Shivajinagar, Near Dnyaneshwar Paduka Chowk, FC Ro
Estimated costRs 23.99 cr
Cost incurredRs 4.77 cr
Work done19.89%
BuildingWingEstimatedIncurred
Building BBRs 20.96 crRs 2.45 cr
Building AARs 3.03 crRs 2.32 cr

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKa Architecture
EngineerMatrix Engineers
EngineerSandip Shataram kadam
EngineerFiroz Ismail Madari
Chartered AccountantKKSS & Associates
Chartered AccountantDSD and Associates
Chartered AccountantA H V and Associates
Chartered AccountantVikas Naikwadi
Chartered AccountantRupali Vishwas Kawar
Chartered AccountantVKPS & ASSOCIATES
PartnerRole in project
ROYAL METROVILLE VENTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A-2025-26-Signed.pdf14 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 signed.pdf10 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 Mar 2025.pdf23 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf16 Jul 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (3).pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 FY 2026-27 Q1-Signed.pdf16 Jul 2026
Building plan approvalFile: Scan 1.pdf15 Jun 2026
Building plan approvalFile: Scan2.pdf15 Jun 2026
Building plan approvalFile: Wing B.pdf4 Jun 2026
Building plan approvalFile: Wing B 2.pdf4 Jun 2026
Layout approvalFile: Layout of the building_11zon.pdf28 Apr 2026
Building plan approvalFile: plan02-05_11zon.pdf28 Apr 2026
Building plan approvalFile: plan03-05_11zon.pdf28 Apr 2026
Building plan approvalFile: plan04-05_11zon.pdf28 Apr 2026
Building plan approvalFile: plan05-05_11zon.pdf28 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Apr 2026
Withdrawal Update Form 3File: Royal Metroville Ventures - Form 3 - Q4 FY 25-26.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1 _ Architect Certificate.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold.pdf16 Jul 2025
Form 1File: Form 1 Q1 25-26.pdf16 Jul 2025
Form 2File: Form 2 Q1 25-26.pdf16 Jul 2025
Form 3File: Form 3 Q1 25-26.pdf16 Jul 2025
Form 1File: Form 1 Q4 _ 23-24.pdf12 Jun 2025
Form 2File: Form 2 Mar 24.pdf12 Jun 2025
Form 3File: Form 3 march 24.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Mar 24.pdf12 Jun 2025
Form 1File: Form 1 June 24.pdf12 Jun 2025
Form 2File: Form 2 june 24.pdf12 Jun 2025
Form 3File: Form 3 june 24.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure June 24.pdf12 Jun 2025
Form 1File: Form 1 Q2 _ 24-25.pdf12 Jun 2025
Form 2File: Form 2 Sept 24.pdf12 Jun 2025
Form 3File: Metroville - Form 3 Q2 FY 2024-25.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sept 24.pdf12 Jun 2025
OthersFile: Form 5.pdf12 Jun 2025
Form 1File: Form 1 Dec 24.pdf12 Jun 2025
Form 2File: Form 2 dec 24.pdf12 Jun 2025
Form 3File: Form 3 dec 24.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 24.pdf12 Jun 2025
Form 1File: Form 1 March 25.pdf12 Jun 2025
Form 2File: Form 2 March 25.pdf12 Jun 2025
Form 3File: Form 3 march 25.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Mar 25.pdf12 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 New Signed.pdf12 Jun 2025
Declaration in FORM BFile: FORM B Developer.pdf21 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Prashant Chavan.pdf4 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A Yogita Divekar.pdf4 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Jayashree Ashok Sudrik.pdf4 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - Rajesh Deshmukh.pdf4 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A _ Ashok Bajirao Sudrik.pdf4 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A _ RMV.pdf4 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A _ Rohan Rankhambe.pdf4 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A _ ROHIT SHINDE.pdf4 Jan 2024
Copy of the legal title reportFile: LEGAL Title Report1-20.pdf18 Dec 2023
Copy of the legal title reportFile: LEGAL Title Report-21-39.pdf18 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank _ Declaration.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _ Architect Certificate.pdf13 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 updated.pdf12 Aug 2023
Deviation Report with respect to Allotment letterFile: Annexure 1 allotment letter_compressed.pdf10 Aug 2023
Other - TechnicalFile: CC OC mail.pdf10 Aug 2023
Layout approvalFile: LAYOUT_compressed.pdf1 Jul 2023
Building plan approvalFile: PLAN 01-04_11zon.pdf1 Jul 2023
Building plan approvalFile: PLAN 02-04_11zon.pdf1 Jul 2023
Building plan approvalFile: PLAN 03-04_11zon.pdf1 Jul 2023
Building plan approvalFile: PLAN 04-04_11zon.pdf1 Jul 2023
PAN CardFile: Royal Metroville venture pan card scan copy_1.pdf1 Jul 2023
Details of encumbrances concerned to FinanceFile: Declaration Non Ecumbrances.pdf1 Jul 2023
Details of encumbrances concerned to LegalFile: Declaration Non Ecumbrances.pdf1 Jul 2023
Copy of Layout Approval (in case of layout)File: LAYOUT_compressed.pdf1 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 01-04_11zon.pdf1 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 02-04_11zon.pdf1 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 03-04_11zon.pdf1 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 04-04_11zon.pdf1 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC (1).pdf1 Jul 2023

How this compares with Pune

35%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ganga Business Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near NICMAR Institute13,700+ in Pune

2 kmGanga Business TowerCompleted 132Lapsed / revoked 52Other 123Dot size: filed unitsN

Filed coordinates, straight-line distance. 307 registered projects within 2 km.

Builder: ROYAL METROVILLE VENTURE

ROYAL METROVILLE VENTURE has 1 registration on MahaRERA, including Ganga Business Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Ganga Business Tower is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ganga Business Tower?

The registered promoter entity is ROYAL METROVILLE VENTURE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ganga Business Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ganga Business Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ganga Business Tower?

The professionals named in the filing: Architect: VKa Architecture; Engineer: Matrix Engineers; Engineer: Sandip Shataram kadam; Engineer: Firoz Ismail Madari; Chartered Accountant: KKSS & Associates; Chartered Accountant: DSD and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ganga Business Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ganga Business Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ganga Business Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.