Registered No litigation declared Residential / Group Housing project

Ganesh Bella Rossa - Phase 2

By Veddant Buildcon

RG-MH-16771 · RERA P52100026780 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
27 of 55Construction stages doneacross 5 buildings; furthest along: Plinth, 90%
89 of 606Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 167 documents Report an error

Ganesh Bella Rossa - Phase 2 is a Residential / Group Housing project by Veddant Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100026780 on 25 Oct 2020. Possession is promised by 30 Jun 2028. 517 of the 606 units on this registration are recorded sold or booked, and 27 of 55 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGanesh Bella Rossa - Phase 2
  • TypeResidential / Group Housing
  • Location
    • main punawale Road
    • Koyate Wasti
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100026780
  • ReraGenie IDRG-MH-16771

Builder

  • NameVeddant Buildcon
  • Entity typePartnership
  • PartnersSanjay Maganlal Patel, Mohit Subhashchand Daga, Dinesh Shantilal Jain, Sandeepkumar Jhanwarlal Lunawat
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2020PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Oct 2020
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed167 files

Current status

85%517 of 606 units booked
79.6%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - CNA19171340134
Building E MHADANA7756056
Building ANA23201570157
Building -BNA20181410141
Building - DNA16151180118

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Plinth, at 90%.

Building - C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building E MHADA51%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth90%
Stilt Floor90%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Building A35%
ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)40%
Plinth80%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building -B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building - D66%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes45%
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes40%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1193

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,193
Closed/Covered578
Open Space615
BuildingClosed/CoveredOpen SpaceTotal
Building - C134134268
Building E MHADA285684
Building A157157314
Building -B141150291
Building - D118118236

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,400 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Aug 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI58990.58
Proposed, not sanctioned19,258 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOld Mumbai Pune Highway, Shop No 3 To 8, Ground Floor, F Wing Premier Plaza, Pune, Maharashtra 41101
Estimated costRs 177.68 cr
Cost incurredRs 141.41 cr
Work done79.59%
BuildingWingEstimatedIncurred
Building - CNARs 32.41 crRs 26.69 cr
Building E MHADANARs 32.41 crRs 26.69 cr
Building ANARs 32.41 crRs 26.69 cr
Building -BNARs 32.41 crRs 26.69 cr
Building - DNARs 32.41 crRs 26.69 cr
-NARs 15.65 crRs 7.96 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSakaar Architects and Planners
EngineerAshok Kumar Jaibir Singh
EngineerPatil Annaso Bhopal
EngineerAditya Santosh Bahikar
Chartered AccountantJoshi Jethale and Associates
Chartered AccountantS. C. Bathiya Co.
PartnerRole in project
Veddant Buildcon-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12502618Prashant RahateVeddant Buildcon29/07/2025
CC12600730Sumit BhandareVeddant Buildcon08/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed167

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 167 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate .pdf4 May 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate .pdf4 May 2026
Withdrawal Update Form 3File: Form 3B MAR 2026 _compressed.pdf4 May 2026
Withdrawal Update Form 1File: FORM -1 ARCHITECH CERTIFICATE_compressed.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM-2 ENGINEER CERTIFICATE_compressed.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3 CA _ Revise_compressed.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: FORM -5 ANNEXURE F_compressed.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate vb JUNE 2025.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 CA_compressed.pdf4 Nov 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep 2025.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 CA certificate.pdf16 Oct 2025
Form 1 Arch Cert March 202529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert March 2025.pdf29 Apr 2025
Form 2 Eng Cert March 202529 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A Eng Cert march 25.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert JUNE 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc Cert Sept 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc Cert dec 24.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Cert June 2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert Sept 2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Dec 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERT JUN 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate sept 2024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 ENG CERT Dec 2024.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BUIDING WISE.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sept 2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer's certificate.pdf30 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A,Assurance Certificate.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate.pdf30 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-2023 FINAL.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Engineers certificate.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect Certificate Punawale.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf18 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers certificate for quality assurance.pdf18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - final- FY 21-22.PDF17 Feb 2023
Layout approvalFile: 01 Layout 2023.pdf2 Feb 2023
Building plan approvalFile: 02 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 03 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 04 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 05 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 06 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 07 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 08 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 09 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 10 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 11 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 12 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 13 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 14 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 15 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 16 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 17 Sanctioned Plan 2023.pdf2 Feb 2023
Building plan approvalFile: 18 Sanctioned Plan 2023.pdf2 Feb 2023
Copy of Layout Approval (in case of layout)File: 01 Layout 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 02 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 03 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 04 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 05 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 06 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 07 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 08 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 09 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 10 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 11 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 12 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 13 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 14 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 15 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 16 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 17 Sanctioned Plan 2023.pdf2 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 18 Sanctioned Plan 2023.pdf2 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 00 Commencement Certificate.pdf2 Feb 2023
Layout approvalFile: 01 DWG LAY Out 2022.pdf5 May 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Ganesh Bella RossaS.No. 35 Part Punavale Taluka Mulshi District Pune63CompletedAug 2017Jul 2017

How this compares with Pune

85%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ganesh Bella Rossa - Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koyate Wasti13,700+ in Pune

Builder: Veddant Buildcon

Veddant Buildcon has 1 registration on MahaRERA, including Ganesh Bella Rossa - Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Ganesh Bella Rossa - Phase 2 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ganesh Bella Rossa - Phase 2?

The registered promoter entity is Veddant Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ganesh Bella Rossa - Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ganesh Bella Rossa - Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ganesh Bella Rossa - Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ganesh Bella Rossa - Phase 2?

The professionals named in the filing: Architect: Sakaar Architects and Planners; Engineer: Ashok Kumar Jaibir Singh; Engineer: Patil Annaso Bhopal; Engineer: Aditya Santosh Bahikar; Chartered Accountant: Joshi Jethale and Associates; Chartered Accountant: S. C. Bathiya Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ganesh Bella Rossa - Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ganesh Bella Rossa - Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ganesh Bella Rossa - Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.