GANDHARV GALAXIA
RG-MH-20649 · RERA P52100009123 · Last updated on MahaRERA portal: 6 Feb 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 60 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANDHARV GALAXIA is a Commercial project by GANDHARV REALTY in Pune, Maharashtra, registered with MahaRERA as P52100009123 on 19 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 60 months from the original filing.
At a glance
Project
- NameGANDHARV GALAXIA
- TypeCommercial
- Location
- PUNE -SOLAPUR rD
- HADAPSAR
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100009123
- ReraGenie IDRG-MH-20649
Builder
- NameGANDHARV REALTY
- Entity typePartnership
- PartnersPREETAM PRAVIN BHALGAT, SANJAY RAMCHANDRA RASKAR, PRAVIN FULCHAND BHALGAT, LOKESH ANANDKUMAR POKHARNA, VIKAS RAMCHANDRA RASKAR, ANANDKUMAR SHOBHACHAND POKHARNA, PRAMOD PRAVIN BHALGAT
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Aug 2017
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed165 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GANDHARV GALAXIA | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
GANDHARV GALAXIA: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 6 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| Club House Cafe | Yes | 0% |
| Society Office | Yes | 100% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M.B.Chaudhari & Associates |
| Engineer | M/S. G. A.Bhilare Consultants Pvt. Ltd. |
| Chartered Accountant | Birla & Company |
| Partner | Role in project |
|---|---|
| GANDHARV REALTY | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur Project is consisting of Lower Ground Floor+Upper Ground Floor+ 1st Floor to 8th Floor. We have completed the project upto 6th Level & 100% of work completed for the 7th Floor & 85% of work completed for the 8th Floor and obtained a part Completion Certificate (Part - 1) upto Third Floor on 18/08/2018 under CC No. OCC/0656/18 & Part Completion Certificate (Part - II) upto 6th Floor on 30/12/2019 under CC No. OCC/0786/19 vide No. 5415. Sir, earlier the entire 3rd (A) floor was sanctioned as two-wheeler parking as per sanction plan No.CC/1154/17dated 26/07/2017,however now as per the revised
Reason as filed by the promoterDue to the lockdown and the restrictions imposed by the government time to time in the light of covid-19 pandemic situation & the very severe adverse market conditions and construction want of labour we are unable to complete 7th & 8th Floor of our project within the time period as mentioned while registering the project before the MAHARERA Authority. In view of the abovesaid reason it is humble request that the further period be extended upto 30th June 2022. For this act of kindness we shall be highly obliged.
Reason as filed by the promoterOur Project is consisting of Lower Ground Floor+Upper Ground Floor+ 1st Floor to 8th Floor. We have completed the project upto 6th Level & 100% of work completed for the 7th Floor & 85% of work completed for the 8th Floor and obtained a part Completion Certificate (Part - 1) upto Third Floor on 18/08/2018 under CC No. OCC/0656/18 & Part Completion Certificate (Part - II) upto 6th Floor on 30/12/2019 under CC No. OCC/0786/19 vide No. 5415. Sir, earlier the entire 3rd (A) floor was sanctioned as two-wheeler parking as per sanction plan No.CC/1154/17dated 26/07/2017,however now as per the revised
Reason as filed by the promoterSir we would like to put it on record that we have registered our project with the Maha RERA Authority & accordingly received a Registration Certificate No. P52100009123 on 19/08/2017. We have completed the project upto 6th Level & 80% of work completed for the 7th Floor but obtained a part Completion Certificate (Part - 1) upto Third Floor on 18/08/2018 under CC No. OCC/0656/18. However our Project is consisting of Lower Ground Floor+Upper Ground Floor+ 1st Floor to 8th Floor. But due to the very severe adverse market conditions we are unable to complete 7th & 8th Floor of our project within
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Dec 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Oct 2024
Documents filed165
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 165 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Arch Form 4.PDF | 6 Feb 2025 |
| Certificates of CA (Form 3)File: CA Cert 310324.PDF | 21 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 31324 GR.PDF | 21 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arch Form 4.PDF | 28 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arch Form 4.PDF | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - Gandharv Realty - Signed.pdf | 26 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certi 31 03 2024.PDF | 13 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Ocupancy Certificate.pdf | 13 Aug 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: APARTMENT DEED P7090-DECLARATION-INDEX II EXTRACT.pdf | 13 Aug 2024 |
| OtherFile: Completion certi.PDF | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Inventory.PDF | 30 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng certificate 31 March 23.PDF | 27 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate 30 Jun 23.PDF | 27 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate 30 Sep 23.PDF | 27 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality Assurance 2023.PDF | 27 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eng Certificate 30 Sep 23.PDF | 27 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: G Realty Sold Unsold unit.PDF | 27 Nov 2023 |
| Certificates of CA (Form 3)File: from 3.PDF | 27 Nov 2023 |
| Certificates of CA (Form 3)File: from 3 31 dec 23.PDF | 27 Nov 2023 |
| Certificates of CA (Form 3)File: From 3 31 march 23.PDF | 27 Nov 2023 |
| Certificates of CA (Form 3)File: From 30 june 23.PDF | 27 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Annual Report 31 March 22.PDF | 27 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Annual Report 31 March 23.PDF | 27 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Mar 23.PDF | 31 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Jun 23.PDF | 31 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Sep 23.PDF | 31 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect certificate Dec 22.PDF | 31 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 31 Dec 22.PDF | 31 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 31 Mar 23.PDF | 31 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 30 Jun 23.PDF | 31 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 30 Sep 23.PDF | 31 Oct 2023 |
| Building plan approvalFile: 2022-5-31-17-22-21.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-23-6.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-23-52.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-24-36.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-25-13.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-25-55.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-26-34.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-27-11.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-27-52.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-28-35.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-29-15.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-30-2.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-30-39.pdf | 5 Nov 2022 |
| Building plan approvalFile: 2022-5-31-17-31-19.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-22-21.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-23-6.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-23-52.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-24-36.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-25-13.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-25-55.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-26-34.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-27-11.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-27-52.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-28-35.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-29-15.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-30-2.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-30-39.pdf | 5 Nov 2022 |
| Building Plan Approval (IOD)File: 2022-5-31-17-31-19.pdf | 5 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 31 3 22.pdf | 5 Nov 2022 |
| Certificates of CA (Form 3)File: CA 30 Sept 21.pdf | 5 Nov 2022 |
| Certificates of CA (Form 3)File: CA 31 Dec 21.pdf | 5 Nov 2022 |
| Certificates of CA (Form 3)File: CA 31 March 22.pdf | 5 Nov 2022 |
| Certificates of CA (Form 3)File: CA 30 June 22.pdf | 5 Nov 2022 |
| Certificates of CA (Form 3)File: CA 30 Sept 22.pdf | 5 Nov 2022 |
| Layout approvalFile: layout 31 March 22.pdf | 4 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: layout 31 March 22.pdf | 4 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 31 03 22.pdf | 4 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 30 9 22.PDF | 4 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 31 12 21.PDF | 4 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 31 03 22.pdf | 4 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch cert 30 06 22.pdf | 4 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 30 9 22.pdf | 4 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 31 12 21.PDF | 4 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 30 9 21.PDF | 4 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 31 12 21.PDF | 4 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 31 03 22.pdf | 4 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch cert 30 06 22.pdf | 4 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 30 9 22.pdf | 4 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Realty-compressed.pdf | 30 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 165 filed documents as one ZIP, foldered, with a manifest
Keep GANDHARV GALAXIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HADAPSAR13,700+ in Pune
Filed coordinates, straight-line distance. 199 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: GANDHARV REALTY
GANDHARV REALTY has 1 registration on MahaRERA, including GANDHARV GALAXIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GANDHARV GALAXIA is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANDHARV GALAXIA?
The registered promoter entity is GANDHARV REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANDHARV GALAXIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GANDHARV GALAXIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANDHARV GALAXIA?
The professionals named in the filing: Architect: M.B.Chaudhari & Associates; Engineer: M/S. G. A.Bhilare Consultants Pvt. Ltd.; Chartered Accountant: Birla & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANDHARV GALAXIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback