Home / Browse projects / Pune, Maharashtra / GANDHARV GALAXIA

Completed No litigation declared Commercial project

GANDHARV GALAXIA

By GANDHARV REALTY

RG-MH-20649 · RERA P52100009123 · Last updated on MahaRERA portal: 6 Feb 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 165 documents Report an error

GANDHARV GALAXIA is a Commercial project by GANDHARV REALTY in Pune, Maharashtra, registered with MahaRERA as P52100009123 on 19 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 60 months from the original filing.

At a glance

Project

  • NameGANDHARV GALAXIA
  • TypeCommercial
  • Location
    • PUNE -SOLAPUR rD
    • HADAPSAR
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100009123
  • ReraGenie IDRG-MH-20649

Builder

  • NameGANDHARV REALTY
  • Entity typePartnership
  • PartnersPREETAM PRAVIN BHALGAT, SANJAY RAMCHANDRA RASKAR, PRAVIN FULCHAND BHALGAT, LOKESH ANANDKUMAR POKHARNA, VIKAS RAMCHANDRA RASKAR, ANANDKUMAR SHOBHACHAND POKHARNA, PRAMOD PRAVIN BHALGAT

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed165 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANDHARV GALAXIANA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

GANDHARV GALAXIA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 6 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Club House CafeYes0%
Society OfficeYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,589 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5721.47
Proposed, not sanctioned5,721 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchARYAN CENTER OPP VAIBHAV THEATRE PUNE SOLAPUR ROAD HADAPSAR PUNE 411028

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM.B.Chaudhari & Associates
EngineerM/S. G. A.Bhilare Consultants Pvt. Ltd.
Chartered AccountantBirla & Company
PartnerRole in project
GANDHARV REALTY-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018364Dec 2019 → Dec 2024

Reason as filed by the promoterOur Project is consisting of Lower Ground Floor+Upper Ground Floor+ 1st Floor to 8th Floor. We have completed the project upto 6th Level & 100% of work completed for the 7th Floor & 85% of work completed for the 8th Floor and obtained a part Completion Certificate (Part - 1) upto Third Floor on 18/08/2018 under CC No. OCC/0656/18 & Part Completion Certificate (Part - II) upto 6th Floor on 30/12/2019 under CC No. OCC/0786/19 vide No. 5415. Sir, earlier the entire 3rd (A) floor was sanctioned as two-wheeler parking as per sanction plan No.CC/1154/17dated 26/07/2017,however now as per the revised

EXT52100010650Dec 2019 → Jun 2022

Reason as filed by the promoterDue to the lockdown and the restrictions imposed by the government time to time in the light of covid-19 pandemic situation & the very severe adverse market conditions and construction want of labour we are unable to complete 7th & 8th Floor of our project within the time period as mentioned while registering the project before the MAHARERA Authority. In view of the abovesaid reason it is humble request that the further period be extended upto 30th June 2022. For this act of kindness we shall be highly obliged.

EXT52100013459Dec 2019 → Dec 2023

Reason as filed by the promoterOur Project is consisting of Lower Ground Floor+Upper Ground Floor+ 1st Floor to 8th Floor. We have completed the project upto 6th Level & 100% of work completed for the 7th Floor & 85% of work completed for the 8th Floor and obtained a part Completion Certificate (Part - 1) upto Third Floor on 18/08/2018 under CC No. OCC/0656/18 & Part Completion Certificate (Part - II) upto 6th Floor on 30/12/2019 under CC No. OCC/0786/19 vide No. 5415. Sir, earlier the entire 3rd (A) floor was sanctioned as two-wheeler parking as per sanction plan No.CC/1154/17dated 26/07/2017,however now as per the revised

EXT52100005047Dec 2019 → Dec 2020

Reason as filed by the promoterSir we would like to put it on record that we have registered our project with the Maha RERA Authority & accordingly received a Registration Certificate No. P52100009123 on 19/08/2017. We have completed the project upto 6th Level & 80% of work completed for the 7th Floor but obtained a part Completion Certificate (Part - 1) upto Third Floor on 18/08/2018 under CC No. OCC/0656/18. However our Project is consisting of Lower Ground Floor+Upper Ground Floor+ 1st Floor to 8th Floor. But due to the very severe adverse market conditions we are unable to complete 7th & 8th Floor of our project within

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Oct 2024

Documents filed165

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 165 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Arch Form 4.PDF6 Feb 2025
Certificates of CA (Form 3)File: CA Cert 310324.PDF21 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 31324 GR.PDF21 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arch Form 4.PDF28 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arch Form 4.PDF28 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 - Gandharv Realty - Signed.pdf26 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certi 31 03 2024.PDF13 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Ocupancy Certificate.pdf13 Aug 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: APARTMENT DEED P7090-DECLARATION-INDEX II EXTRACT.pdf13 Aug 2024
OtherFile: Completion certi.PDF13 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Inventory.PDF30 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng certificate 31 March 23.PDF27 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate 30 Jun 23.PDF27 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate 30 Sep 23.PDF27 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality Assurance 2023.PDF27 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eng Certificate 30 Sep 23.PDF27 Nov 2023
Disclosure of sold/ booked inventoryFile: G Realty Sold Unsold unit.PDF27 Nov 2023
Certificates of CA (Form 3)File: from 3.PDF27 Nov 2023
Certificates of CA (Form 3)File: from 3 31 dec 23.PDF27 Nov 2023
Certificates of CA (Form 3)File: From 3 31 march 23.PDF27 Nov 2023
Certificates of CA (Form 3)File: From 30 june 23.PDF27 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Annual Report 31 March 22.PDF27 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Annual Report 31 March 23.PDF27 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Mar 23.PDF31 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Jun 23.PDF31 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Sep 23.PDF31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect certificate Dec 22.PDF31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 31 Dec 22.PDF31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 31 Mar 23.PDF31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 30 Jun 23.PDF31 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certi 30 Sep 23.PDF31 Oct 2023
Building plan approvalFile: 2022-5-31-17-22-21.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-23-6.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-23-52.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-24-36.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-25-13.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-25-55.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-26-34.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-27-11.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-27-52.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-28-35.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-29-15.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-30-2.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-30-39.pdf5 Nov 2022
Building plan approvalFile: 2022-5-31-17-31-19.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-22-21.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-23-6.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-23-52.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-24-36.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-25-13.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-25-55.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-26-34.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-27-11.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-27-52.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-28-35.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-29-15.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-30-2.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-30-39.pdf5 Nov 2022
Building Plan Approval (IOD)File: 2022-5-31-17-31-19.pdf5 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 31 3 22.pdf5 Nov 2022
Certificates of CA (Form 3)File: CA 30 Sept 21.pdf5 Nov 2022
Certificates of CA (Form 3)File: CA 31 Dec 21.pdf5 Nov 2022
Certificates of CA (Form 3)File: CA 31 March 22.pdf5 Nov 2022
Certificates of CA (Form 3)File: CA 30 June 22.pdf5 Nov 2022
Certificates of CA (Form 3)File: CA 30 Sept 22.pdf5 Nov 2022
Layout approvalFile: layout 31 March 22.pdf4 Nov 2022
Copy of Layout Approval (in case of layout)File: layout 31 March 22.pdf4 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 31 03 22.pdf4 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 30 9 22.PDF4 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 31 12 21.PDF4 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 31 03 22.pdf4 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch cert 30 06 22.pdf4 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 30 9 22.pdf4 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archt cert 31 12 21.PDF4 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 30 9 21.PDF4 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 31 12 21.PDF4 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 31 03 22.pdf4 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch cert 30 06 22.pdf4 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Archt cert 30 9 22.pdf4 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Realty-compressed.pdf30 Sep 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 60 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANDHARV GALAXIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HADAPSAR13,700+ in Pune

2 kmGANDHARV GALAXIACompleted 80Lapsed / revoked 22Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 199 registered projects within 2 km.

Builder: GANDHARV REALTY

GANDHARV REALTY has 1 registration on MahaRERA, including GANDHARV GALAXIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GANDHARV GALAXIA is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANDHARV GALAXIA?

The registered promoter entity is GANDHARV REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANDHARV GALAXIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANDHARV GALAXIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANDHARV GALAXIA?

The professionals named in the filing: Architect: M.B.Chaudhari & Associates; Engineer: M/S. G. A.Bhilare Consultants Pvt. Ltd.; Chartered Accountant: Birla & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANDHARV GALAXIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANDHARV GALAXIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANDHARV GALAXIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.