Home / Browse projects / Thane, Maharashtra / GAMI JADE

Completed No litigation declared Others project

GAMI JADE

By LAL GEBI INFRA PRIVATE LIMITED

RG-MH-61329 · RERA P51700034661 · Last updated on MahaRERA portal: 29 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

GAMI JADE is a Others project by LAL GEBI INFRA PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700034661 on 20 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameGAMI JADE
  • TypeOthers
  • Location
    • SECTOR 26
    • VASHI
    • Navi Mumbai (M Corp.)
    • Thane
    • 400703
  • Pincode400703
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700034661
  • ReraGenie IDRG-MH-61329

Builder

  • NameLAL GEBI INFRA PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2020PTC345469
  • GSTIN27AAECL3308B1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsAMBALA GAMI, AMBALAL GAMI, AMBALAL GAMI
  • Other registrations6 more →
  • Completed2 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GAMI JADENA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

GAMI JADE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed211

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots211
Closed/Covered211

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,003 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14541.6
Proposed, not sanctioned14,476 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASHI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Hemant Dhavale
EngineerA.G.GOKHALE & ASSOCIATES
Chartered AccountantNEHALI & CO
PartnerRole in project
LAL GEBI INFRA PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Feb 2024

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed form -5 JADE 23-24.pdf29 Nov 2024
Other - FinanceFile: Financial Encumbrances_GAMI VED_NEW PARTH DEVELOPERS_14092024 (1).pdf15 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Gami Jade.pdf5 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Final Architect Certificate.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Sept 23.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 23.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 1A-26 Vashi 20231002 (2).pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate-Jade-9-10-023.pdf14 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate- Gami Jade Septemebr'23 (1).pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 jade 22-23.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GAMI JADE FORM 1.pdf28 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GAMI JADE FORM 2.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAMI JADE FORM 3.pdf28 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 1A-26 Vashi.pdf30 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate GAMI JADE.pdf30 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Gami Jade dec.pdf30 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf27 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate__GAMI JADE revised.pdf25 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate GAMI JADE.pdf26 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gami Jade Architect form 1.pdf16 Jul 2022
Details of encumbrancesFile: encumbrance (2).pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Gami.pdf7 Apr 2022
Copy of the legal title reportFile: TITLE REPORT.pdf5 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Apr 2022
CERSAI detailsFile: CERSAI REPORT.pdf2 Apr 2022
Proforma of Allotment letterFile: Allotment letter.pdf1 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf30 Mar 2022
Layout approvalFile: final plan.pdf29 Mar 2022
Building plan approvalFile: final plan.pdf29 Mar 2022
Copy of Layout Approval (in case of layout)File: final plan.pdf29 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: final plan.pdf29 Mar 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE (1).pdf26 Mar 2022
Proforma of Allotment letterFile: Agreement.pdf26 Mar 2022
PAN CardFile: PAN.pdf11 Oct 2021
Declaration in FORM BFile: compressed form b.pdf11 Oct 2021

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Gami TelonP51700080035Ghansoli, Thane72Apr 2025OngoingDec 2029Not due yet
Gami MiravaPR1270002600408New Panvel, Raigarh327May 2026OngoingDec 2029Not due yet
Gami AvantP51700079740Vashi, Navi Mumbai, Thane232Mar 2025OngoingDec 2029Not due yet
Gami BiancaP52000051188Dronagiri, Navi Mumbai, Raigarh436Jun 2023OngoingDec 2027Not due yet

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAMI JADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASHI7,600+ in Thane

2 kmGAMI JADECompleted 18Lapsed / revoked 7Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: LAL GEBI INFRA PRIVATE LIMITED

LAL GEBI INFRA PRIVATE LIMITED has 7 registrations on MahaRERA, including GAMI JADE and Gami Terra. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GAMI JADE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAMI JADE?

The registered promoter entity is LAL GEBI INFRA PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2020PTC345469 and GSTIN 27AAECL3308B1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAMI JADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAMI JADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAMI JADE?

The professionals named in the filing: Architect: Ar. Hemant Dhavale; Engineer: A.G.GOKHALE & ASSOCIATES; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAMI JADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAMI JADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAMI JADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.