Galaxy Residency

By Maitri Developers

RG-MH-27875 · RERA P52900024798 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 24 months from the original
7 of 11Construction stages donefurthest along: Internal walls, 90%
28 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Galaxy Residency is a Residential / Group Housing project by Maitri Developers in Sindhudurg, Maharashtra, registered with MahaRERA as P52900024798 on 9 Mar 2020. Possession is promised by 1 Jan 2027. The completion date has moved by 24 months from the original filing. 30 of the 58 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameGalaxy Residency
  • TypeResidential / Group Housing
  • Location
    • Bidayewadi Road
    • Bidayewadi
    • Kalmath
    • kalmath
    • Kankavli
    • Sindhudurg
    • 416602
  • Pincode416602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900024798
  • ReraGenie IDRG-MH-27875

Builder

  • NameMaitri Developers
  • Entity typePartnership
  • PartnersNamrata Rhutvij Rane, Pavan Narayan Bhosale
  • Other registrations5 more →
  • Completed3 of 6
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2020First promiseJan 2025Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2020
  • Promised completion1 Jan 2027
  • Revised completionRevised to 1 Jan 2027 (originally 1 Jan 2025)
  • Buildings1 building record
  • Documents filed77 files

Current status

52%30 of 58 units booked
81.2%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GalaxyNA64421658

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Galaxy: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed135

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots135
Closed/Covered11
Open Space124

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,210 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GAlaxykalmathSindhudurg

Approvals and building plan

Sanctioning authorityKalmath Grampanchayat
Permissible FSI2209.89
Proposed, not sanctioned2,210 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRameshwar Plaza, Ground Floor, Mumbai - Goa Highway, At - Post - Tal - Kanakavli, Dist - Sindhudurga
Estimated costRs 4.50 cr
Cost incurredRs 3.65 cr
Work done81.17%
BuildingWingEstimatedIncurred
GalaxyNARs 4.50 crRs 3.65 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGitesh Mahendrakumar Murkar
EngineerSandeep shetye
Chartered AccountantSameer P Kulkarni
Chartered AccountantDarshan Bhalchandra Prabhukhanolkar
PartnerRole in project
Maitri Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900025602Jan 2025 → Jan 2026

Reason as filed by the promoterIts a request to RERA department to grant extension for my project to complete it.

EA30122519143Jan 2025 → Jan 2027

Reason as filed by the promoterDue to timely not availability of sand and labor issues Project got delay in completion. Kindly consider and provide extension for 1year.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jan 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 April-June26 Digambar.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 April-June26 Digambar.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 April-June26 Digambar.pdf20 Aug 2026
Form 5 (FY 2024-2025)File: Form-5 24-25 Digambar.pdf20 Aug 2026
Form 5 (FY 2025-2026)File: Form-5 25-26 Digambar.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Dec25 Galaxy.pdf16 Jun 2026
Withdrawal Update Form 1File: Form-1JAN26.pdf16 Jun 2026
Withdrawal Update Form 2File: Form-2 Dec25 Galaxy.pdf16 Jun 2026
Withdrawal Update Form 2File: Form-2 JAN26.pdf16 Jun 2026
Withdrawal Update Form 3File: Form-3 Dec25 Galaxy.pdf16 Jun 2026
Withdrawal Update Form 3File: Form-3JAN26.pdf16 Jun 2026
Withdrawal Update Form 1File: DIGAMBAR BHOSLE FORM-1_rotated.pdf9 Feb 2026
Withdrawal Update Form 2File: DIGAMBAR BHOSLE FORM-2.pdf9 Feb 2026
Withdrawal Update Form 3File: DIGAMBAR BHOSLE FORM-3 (1).pdf9 Feb 2026
Withdrawal Update Form 1File: DIGAMBAR BHOSLE FORM-1_rotated.pdf30 Dec 2025
Withdrawal Update Form 2File: DIGAMBAR BHOSLE FORM-2.pdf30 Dec 2025
Withdrawal Update Form 3File: DIGAMBAR BHOSLE FORM-3 (1).pdf30 Dec 2025
Withdrawal Update Form 1File: FORM-1 GALAXY.pdf6 Nov 2025
Withdrawal Update Form 2File: FORM-2 GALAXY-2_merged.pdf6 Nov 2025
Withdrawal Update Form 3File: FORM-3 GALAXY.pdf6 Nov 2025
Withdrawal Update Form 1File: Form-1 Galaxy jan-march25.pdf31 May 2025
Withdrawal Update Form 2File: Form-2 Galaxy jan-march25_rotated.pdf31 May 2025
Withdrawal Update Form 3File: Form-3 GAlaxy jan-march25.pdf31 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B GALAXY RESIDENCY.pdf3 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation for Allotment Letter.pdf1 Feb 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT WITH RESPECT TO THE MODEL AGREEMENT.pdf1 Feb 2025
Declaration in FORM BFile: P52900024798_FileName_1.pdf21 Jan 2025
CERSAI detailsFile: CERSAI UNDERTAKING.pdf21 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of intrest 1ST PARTNER.pdf21 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA_compressed.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form-2_2.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: sold inventory.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: sold inventory.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 2020 TO 2021.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A 2021.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5 2021 TO 2022.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A 2022.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A 2023.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 2022 TO 2023.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A 2024.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 2023 TO 2024.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 2021.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 2022.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 2023.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MARCH 24.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 MARCH 24.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 OCT 24.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SEP 24_compressed.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MARCH 2024_compressed.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MARCH 2023_compressed.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MARCH 2022_compressed.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MARCH 2021_compressed.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 30-09-24_rotated.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31-03-24_rotated.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31-03-23_rotated.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31-03-21_rotated.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31-03-22_rotated.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf31 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: structural certificate.pdf31 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate.pdf31 Mar 2021
PAN CardFile: PANCARD.pdf3 Mar 2020
Proforma of Allotment letterFile: Agreement to Sale 1.pdf22 Feb 2020
Proforma of Allotment letterFile: Agreement to Sale 2.pdf22 Feb 2020
Proforma of Allotment letterFile: Alottment Letter.pdf22 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Feb 2020
Layout approvalFile: layout.pdf28 Jan 2020
Building plan approvalFile: sheet 01.pdf28 Jan 2020
Building plan approvalFile: sheet 02.pdf28 Jan 2020
Copy of the legal title reportFile: Search Report.pdf28 Jan 2020
Details of encumbrancesFile: Encumberance.pdf28 Jan 2020
Copy of Layout Approval (in case of layout)File: layout.pdf28 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: sheet 01.pdf28 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: sheet 02.pdf28 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Sanctioned Order.pdf28 Jan 2020
Declaration in FORM BFile: Maitry Form B.pdf28 Jan 2020

How this compares with Sindhudurg

52%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 24 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Galaxy Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bidayewadi, Kalmath530+ in Sindhudurg

2 kmGalaxy ResidencyCompleted 14Lapsed / revoked 14Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: Maitri Developers

MAITRI DEVELOPERS has 6 registrations on MahaRERA, including AMBER ARCADE and MAITRI GARDEN. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Galaxy Residency is delayed beyond 1 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Galaxy Residency?

The registered promoter entity is Maitri Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Galaxy Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Galaxy Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Galaxy Residency?

The professionals named in the filing: Architect: Gitesh Mahendrakumar Murkar; Engineer: Sandeep shetye; Chartered Accountant: Sameer P Kulkarni; Chartered Accountant: Darshan Bhalchandra Prabhukhanolkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Galaxy Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Galaxy Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Galaxy Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.