ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / GALAXY-13

Completed No litigation declared Residential / Group Housing project

GALAXY-13

By UNITY INFRATECH

RG-MH-36405 · RERA P50500049574 · Last updated on MahaRERA portal: 9 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

GALAXY-13 is a Residential / Group Housing project by UNITY INFRATECH in Nagpur, Maharashtra, registered with MahaRERA as P50500049574 on 15 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameGALAXY-13
  • TypeResidential / Group Housing
  • Location
    • LAY OUT ROAD
    • OMKAR NAGAR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440027
  • Pincode440027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500049574
  • ReraGenie IDRG-MH-36405

Builder

  • NameUNITY INFRATECH
  • Entity typePartnership
  • PartnersMUKESH DHIRAJBHAI PATEL, DIPEN RAMESH KOTADIYA, KUNJAL MUKESH PATEL, NACHIKET PRADEEP LANDE, NEETA PRAVIN BAJARIYA
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GALAXY-13NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

GALAXY-13: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 9 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
COMPOUND WALLYes25%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered15
Open Space24

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area450 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1276.67
Proposed, not sanctioned1,277 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 15 SACHITANAND NAGAR MANEADA ROAD NAGPUR 440024

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKISHORE MEHATA
EngineerVIJENDRA KALAMBE
EngineerSATISH D PANDEY
Chartered AccountantKHANZODE & SHENWAI
Chartered AccountantRAKESH THAKRE
Chartered AccountantA M DABKE & ASSOCIATES
PartnerRole in project
UNITY INFRATECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Nov 2024

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect completion.pdf9 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Unity infratech 2024 1.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 24 25.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 24 25.pdf25 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect completion.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Galaxy 13 Form 3 Q1.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 24 25.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 Q1 24 25.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 24 25.pdf25 Oct 2024
Other - TechnicalFile: OC Unity infratech 2024.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23 -24.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Galaxy 13 Form 3 Q1 FY 2024-25.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Galaxy 13 Form 5.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Q4 march 2024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 March 2024.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Unity Form 3 Q4 FY 2023-24.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 POSITION AS ON 31-12-23.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 POSITION AS ON 31-12-23.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RERA as on 31 12 23.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Galaxy 13.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q 2 2023 24.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q 2 2023 24.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 2 2023 24.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate as on 30th June 2023.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate as on 30th June 2023.pdf18 Aug 2023
Disclosure of sold/ booked inventoryFile: Booking Position as on 30th June 2023.pdf18 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate as on 30th June 2023.pdf18 Aug 2023
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCE CERTIFICATE.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCE CERTIFICATE.pdf20 Jan 2023
Declaration about Commencement CertificateFile: Format D REVISED.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate REVISED.pdf20 Jan 2023
Proforma of Agreement for saleFile: MODEL AGREEMENT FOR SALE- RERA- GALAXY RESBMIT 1.pdf20 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Explanation regarding Formation of Coop Society.pdf20 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed Of Declaration-01.pdf20 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed Of Declaration-02.pdf20 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed Of Declaration-03.pdf20 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report For Model Copy Of Agreement REVISED.pdf20 Jan 2023
Building plan approvalFile: Sanctioned Map.pdf2 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Map.pdf2 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Building Permit and Commencement Certificate Nagpur Improvement Trust.pdf2 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Project.pdf2 Jan 2023
Status of ConveyanceFile: project land sale deed 1.pdf2 Jan 2023
Status of ConveyanceFile: project land sale deed 2.pdf2 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration abt Seperate Bank Accont.pdf2 Jan 2023
Other - LegalFile: Malmatta Patrak.pdf2 Jan 2023
Other - LegalFile: NMC Tax Receipt.pdf2 Jan 2023
Other - LegalFile: TDR Certificate.pdf2 Jan 2023
Other - LegalFile: RESOLTION AUTHORISING PARTNER.pdf2 Jan 2023
Other - LegalFile: Deed Of Partnership and Reconstitution.pdf2 Jan 2023
Other - TechnicalFile: Plot Amalgamation Plan.pdf2 Jan 2023
Building plan approvalFile: Building Plan 1.pdf31 Dec 2022
Layout approvalFile: Building Plan 1.pdf31 Dec 2022
PAN CardFile: Unity Infratech Pan.pdf31 Dec 2022
Copy of the legal title reportFile: Legal Title Report.pdf31 Dec 2022
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE CERTIFICATE.pdf31 Dec 2022
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE CERTIFICATE.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: Building Plan 1.pdf31 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf31 Dec 2022
Declaration in FORM BFile: AFFIDAVIT FORM B.pdf31 Dec 2022
CERSAI detailsFile: CERSAI DETAILS.pdf31 Dec 2022
Proforma of Allotment letterFile: Allotment Letter.pdf31 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Report For Allotment Letter.pdf31 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GALAXY MANSION - 11PLOT NO 33B RAGHVENDRA SOCIETY OMKAR NAGAR NAGPUR 4400377CompletedMay 2022Mar 2022

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GALAXY-13 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OMKAR NAGAR2,800+ in Nagpur

2 kmGALAXY-13Completed 2Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: UNITY INFRATECH

UNITY INFRATECH has 2 registrations on MahaRERA, including SAI DARSHAN and GALAXY-13. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if GALAXY-13 is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GALAXY-13?

The registered promoter entity is UNITY INFRATECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GALAXY-13?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GALAXY-13?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GALAXY-13?

The professionals named in the filing: Architect: KISHORE MEHATA; Engineer: VIJENDRA KALAMBE; Engineer: SATISH D PANDEY; Chartered Accountant: KHANZODE & SHENWAI; Chartered Accountant: RAKESH THAKRE; Chartered Accountant: A M DABKE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GALAXY-13?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GALAXY-13. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GALAXY-13 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.