Home / Browse projects / Amravati, Maharashtra / Gajanan Tower
Gajanan Tower
RG-MH-15815 · RERA P50300076894 · Last updated on MahaRERA portal: 22 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gajanan Tower is a Others project by KAMAL DIGRILAL MALVIYA in Amravati, Maharashtra, registered with MahaRERA as P50300076894 on 3 Jul 2024. Possession is promised by 15 Mar 2028. 0 of the 14 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameGajanan Tower
- TypeOthers
- Location
- Ring Road
- Siddhivinayak Nagar Vishal Colony Near Muktai Palace Amravati
- Amravati
- Amravati (M Corp.)
- 444602
- Pincode444602
- RERA no.P50300076894
- ReraGenie IDRG-MH-15815
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jul 2024
- Promised completion15 Mar 2028
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 22 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Gajanan Tower | NA | 12 | 12 | 0 | 14 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 60%.
Gajanan Tower: 36% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 15% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed223
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Gajanan Tower | NA | Rs 24.90 cr | - |
| - | NA | Rs 4.47 cr | Rs 80.46 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Geet Malviya |
| Engineer | Pankaj Deshmukh |
| Chartered Accountant | SKTS and Associates |
| Partner | Role in project |
|---|---|
| KAMAL DIGRILAL MALVIYA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Mar 2028
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architects Cert Sept25.pdf | 22 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Cert Sept25.pdf | 22 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate Sept25.pdf | 22 Feb 2026 |
| Withdrawal Update Form 1File: Architects Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: Architects Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: Architects Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: Architects Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: Architects Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Cert June 2025.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate June25.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate June25.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate June25.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate June25.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate June25.pdf | 21 Feb 2026 |
| Form 1File: Architects Certificate.pdf | 17 Jun 2025 |
| Form 2File: Engineer Certificate.pdf | 17 Jun 2025 |
| Form 3File: CA Certificate 19 Dec_compressed.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold InventoryNA.pdf | 17 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration GT_Sept24.pdf | 17 Jun 2025 |
| Form 1File: Architect_24.pdf | 17 Jun 2025 |
| Form 2File: Form 2 GT Dec24.pdf | 17 Jun 2025 |
| Form 3File: CA24.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory24.pdf | 17 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self decl 24.pdf | 17 Jun 2025 |
| Form 1File: Architect_25.pdf | 17 Jun 2025 |
| Form 2File: Form 2 Mar25 GT.pdf | 17 Jun 2025 |
| Form 3File: CA25.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory25.pdf | 17 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self decl 25.pdf | 17 Jun 2025 |
| Form 2A (FY 2024-2025)File: Form2A.pdf | 17 Jun 2025 |
| Form 2A (FY 2025-2026)File: Form2A.pdf | 17 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 19 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 19 Dec_compressed.pdf | 19 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 19 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA New_5-6-24_11zon.pdf | 5 Jun 2024 |
| Declaration about Commencement CertificateFile: Final CC.pdf | 27 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Sanction Plan Correct_compressed.pdf | 15 May 2024 |
| Other - FinanceFile: Undertaking on Correct Sanction Plan.pdf | 15 May 2024 |
| Details of encumbrances concerned to FinanceFile: Financial Encumbrance Certificate GT.pdf | 27 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Financial Encumbrance Certificate GT.pdf | 27 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3_compressed.pdf | 27 Mar 2024 |
| Other - LegalFile: saledeed1.pdf | 27 Mar 2024 |
| Other - LegalFile: saledeed2.pdf | 27 Mar 2024 |
| Other - LegalFile: saledeed3.pdf | 27 Mar 2024 |
| Other - FinanceFile: Email competent Authority.pdf | 27 Mar 2024 |
| Declaration in FORM BFile: Affadavit Form B_GT_New.pdf | 22 Mar 2024 |
| CERSAI detailsFile: Undertaking on CERSAI.pdf | 22 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Account GT.pdf | 22 Mar 2024 |
| Building plan approvalFile: Sanction Plan Correct_compressed.pdf | 16 Feb 2024 |
| Building plan approvalFile: Sanction Map - Sheet No 2_compressed.pdf | 16 Feb 2024 |
| Building plan approvalFile: Sanction Map - Sheet No 3_compressed.pdf | 16 Feb 2024 |
| Layout approvalFile: Layout.pdf | 16 Feb 2024 |
| PAN CardFile: Pan Card.pdf | 16 Feb 2024 |
| Copy of the legal title reportFile: Title Search_Gajanan Tower.pdf | 16 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate_Gajanan Tower.pdf | 16 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance Certificate_Gajanan Tower.pdf | 16 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 16 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Correct_compressed.pdf | 16 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Map - Sheet No 2_compressed.pdf | 16 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Map - Sheet No 3_compressed.pdf | 16 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Sanction Letter_compressed.pdf | 16 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate-Annexure A-Form 1 GT.pdf | 16 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf | 16 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure GT.pdf | 16 Feb 2024 |
| Proforma of Agreement for saleFile: Agreement of Sale_Gajanan Towers.pdf | 16 Feb 2024 |
| Proforma of Allotment letterFile: Allottment Letter GT.pdf | 16 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report GT.pdf | 16 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report GT.pdf | 16 Feb 2024 |
| Other - TechnicalFile: Annexure A GT.pdf | 16 Feb 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ANARVILLA | SHYAM NAGAR LANE NO 2 | 1 | Completed | Sep 2014 | Jun 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gajanan Tower on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Amravati450+ in Amravati
Jai Amba Palm City- Areca Palm Wing A,B,C
Grand Palm City LLP
Vivanta Infinity Private Limited
VIVANTA INFINITY PRIVATE LIMITED
SAHYADRI HEIGHTS
ANSHUMAN BUILDERS
SANKALP ICON
SANKALP DREAM SPACES LLP
RACHANA SRUSHTI PHASE II
SRUSHTI INFRA
Jai Amba Palm City- Queen Palm Wing A B
M/s Grand Palm City LLP
See every Amravati project, with the district possession charts
Builder: KAMAL DIGRILAL MALVIYA
KAMAL DIGRILAL MALVIYA has 3 registrations on MahaRERA, including PRATIK TOWER and Gajanan Heights. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What are my rights if Gajanan Tower is delayed beyond 15 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gajanan Tower?
The registered promoter entity is KAMAL DIGRILAL MALVIYA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gajanan Tower?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gajanan Tower?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gajanan Tower?
The professionals named in the filing: Architect: Geet Malviya; Engineer: Pankaj Deshmukh; Chartered Accountant: SKTS and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gajanan Tower?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback