ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / gagangiri Elanza

Completed No litigation declared Residential / Group Housing project

gagangiri Elanza

By Palan Realty Private Limited

RG-MH-59774 · RERA P51800010768 · Last updated on MahaRERA portal: 8 Feb 2025

Source: official MahaRERA filing

Red flags

  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

gagangiri Elanza is a Residential / Group Housing project by Palan Realty Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010768 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2022.

At a glance

Project

  • Namegagangiri Elanza
  • TypeResidential / Group Housing
  • Location
    • Mithaghar Road
    • Mulund East
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010768
  • ReraGenie IDRG-MH-59774

Builder

  • NamePalan Realty Private Limited
  • Entity typeCompany
  • Managing DirectorsMehul Ravilal Dedhia, Vijay Nanji Dedhia
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Mar 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gagangiri ElanzaNA390000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Gagangiri Elanza: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 8 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered110

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,489 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8515.78
Proposed, not sanctioned8,516 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGagangiri Complex Near Ambedkar Garden Chembur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Collaboration
EngineerSystem Structural Consultants Pvt Ltd
Chartered AccountantMr Paresh Sabadra
PartnerRole in project
Palan Realty Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017604Mar 2022 → Dec 2023

Reason as filed by the promotera) The Residential Project is not completed b) Due to the COVID-19 pandemic, the regular flow of work is hampered on account of the unavailability of labour on a regular basis.

EXT51800011719Mar 2022 → Mar 2023

Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jan 2024

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate 08-11-2023_compressed.pdf8 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architects Certificate Form 4.pdf8 Feb 2025
Certificates of CA (Form 3)File: Final CA certificate -Palan Realty.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 oc Signed.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Rera 30-12-23.pdf4 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPATION CERTIFICATE RECD FROM MHADA DT.pdf4 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Certificate June 23.pdf6 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Certificate Sep 23.pdf6 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate June'2023.pdf6 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sept'2023.pdf6 Dec 2023
Certificates of CA (Form 3)File: CA Certificate June'2023.pdf6 Dec 2023
Certificates of CA (Form 3)File: CA Certificate Sept'2023.pdf6 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report_Gagangiri_22-23.pdf6 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Gagangiri Elanza.pdf31 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Gagangiri Elanza_1 (3 files merged).pdf6 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 30-09-22.pdf29 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31-12-22.pdf29 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31-03-23.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30-09-22.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31-12-22.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31-03-23.pdf29 Sep 2023
Certificates of CA (Form 3)File: CA Certificate- Sep 22.pdf29 Sep 2023
Certificates of CA (Form 3)File: CA Certificate - Dec 22.pdf29 Sep 2023
Certificates of CA (Form 3)File: CA Certificate- March 23.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure.pdf13 Apr 2023
Other - TechnicalFile: 2A.pdf13 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Singed Copy of Rera Audit Report for the Year 2021-22 (1).pdf2 Dec 2022
Certificates of CA (Form 3)File: CA Certificate June signed.pdf20 Oct 2022
Certificates of CA (Form 3)File: gagangiri signed CA Cert.pdf8 Apr 2022
Layout approvalFile: amended plan 1 08-03-2022.pdf7 Apr 2022
Layout approvalFile: amended plan 2.pdf7 Apr 2022
Layout approvalFile: amended plan 3.pdf7 Apr 2022
Building plan approvalFile: amended plan 1 08-03-2022.pdf7 Apr 2022
Layout approvalFile: amended plan 2.pdf7 Apr 2022
Building plan approvalFile: amended plan 3.pdf7 Apr 2022
Building plan approvalFile: amended plan 4.pdf7 Apr 2022
Building plan approvalFile: amended plan 5.pdf7 Apr 2022
Building plan approvalFile: amended plan 6.pdf7 Apr 2022
Building plan approvalFile: amended plan 7.pdf7 Apr 2022
Layout approvalFile: amended plan 5.pdf7 Apr 2022
Layout approvalFile: amended plan 6.pdf7 Apr 2022
Layout approvalFile: amended plan 7.pdf7 Apr 2022
Layout approvalFile: amended plan 4.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 1 08-03-2022.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 2.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 3.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 4.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 5.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 6.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 7.pdf7 Apr 2022
Copy of Layout Approval (in case of layout)File: amended plan 2.pdf7 Apr 2022
Building Plan Approval (IOD)File: amended plan 1 08-03-2022.pdf7 Apr 2022
Building Plan Approval (IOD)File: amended plan 3.pdf7 Apr 2022
Building Plan Approval (IOD)File: amended plan 4.pdf7 Apr 2022
Building Plan Approval (IOD)File: amended plan 5.pdf7 Apr 2022
Building Plan Approval (IOD)File: amended plan 6.pdf7 Apr 2022
Building Plan Approval (IOD)File: amended plan 7.pdf7 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: REVALIDATION CC 31 ST FLOOR DT.pdf7 Apr 2022
Declaration about Commencement CertificateFile: Form D_Gagangiri Elanza.pdf7 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf7 Apr 2022
Certificates of CA (Form 3)File: CA Cert 31 12 signed.pdf6 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Gagangiri 18-19.pdf6 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Gagangiri 19-20.pdf6 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Gagangiri 20-21.pdf6 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2372021.pdf10 Nov 2021
Disclosure of sold/ booked inventoryFile: Form 3.pdf10 Nov 2021
Certificates of CA (Form 3)File: Form 3.pdf10 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf13 Jan 2019
Certificates of CA (Form 5)File: FORM 5 PALAN.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (1) 12-02-2018_compressed.pdf12 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: further cc.pdf10 Feb 2018
Certificates of CA (Form 3)File: palan realty1.pdf23 Aug 2017
Proforma of Allotment letterFile: Allotment Letter.pdf23 Aug 2017
Details of encumbrancesFile: BCB sanctioned loan_compressed.pdf22 Aug 2017
Proforma of Allotment letterFile: Agreement for Sale Final.pdf22 Aug 2017
Layout approvalFile: Swapnapurti Ground Floor.pdf18 Aug 2017
Layout approvalFile: Swapnapurti Typical up to 19th.pdf18 Aug 2017
Layout approvalFile: Swapnapurti 7 th level podium.pdf18 Aug 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep gagangiri Elanza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund East6,700+ in Mumbai Suburban

2 kmgagangiri ElanzaCompleted 109Lapsed / revoked 99Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 359 registered projects within 2 km.

Builder: Palan Realty Private Limited

Palan Realty Private Limited has 2 registrations on MahaRERA, including gagangiri Elanza and Mithagar Road Ekta CHSL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if gagangiri Elanza is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of gagangiri Elanza?

The registered promoter entity is Palan Realty Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in gagangiri Elanza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for gagangiri Elanza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at gagangiri Elanza?

The professionals named in the filing: Architect: Architect Collaboration; Engineer: System Structural Consultants Pvt Ltd; Chartered Accountant: Mr Paresh Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in gagangiri Elanza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About gagangiri Elanza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save gagangiri Elanza to a free account