GAGAN SOUTHCODE

By GAGAN ACE DEVELOPERS

RG-MH-10050 · RERA P52100003510 · Last updated on MahaRERA portal: 29 Mar 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
0 of 11Construction stages donefurthest along: Excavation, 92%
104 of 137Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

GAGAN SOUTHCODE is a Commercial project by GAGAN ACE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100003510 on 5 Aug 2017. Possession was promised by 31 Mar 2024 and is now 31 months past that date. The completion date has moved by 48 months from the original filing. 33 of the 137 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGAGAN SOUTHCODE
  • TypeCommercial
  • Location
    • Kondhwa Pisoli Road
    • Kondhwa
    • kondhwa BK
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003510
  • ReraGenie IDRG-MH-10050

Builder

  • NameGAGAN ACE DEVELOPERS
  • Entity typeProprietor
  • GSTIN27ABZPL9697E1ZK
  • PartnerDAISY AGRO PVT LTD CO THROUGH ITS DIRECTOR ALNESH AKIL SOMJI
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

31 months past promisethis monthRegisteredAug 2017First promiseMar 2020Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Aug 2017
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed52 files

Current status

24%33 of 137 units booked

Figures as on 29 Mar 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GAGAN SOUTHCODENA760137137

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 92%.

GAGAN SOUTHCODE: 48% average across the applicable activities

ActivityProgress
Excavation92%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor50%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises74%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 29 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Feb 2026
LandownerVillageDistrict
M/S AKASH DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI7601.08
Proposed, not sanctioned2,750 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSWARGATE PUNE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE DESIGNERS SYNDICATE PARTNER SHAIKH ZUBER RASHID
EngineerG A BHILARE CONSULTANTS PVT LTD
EngineerSiddhant D Rathod
Chartered AccountantMilani & Associates
Chartered AccountantSCT & Company
PartnerRole in project
Akash Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002505Mar 2020 → Mar 2021

Reason as filed by the promoterOn Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Any notice, order, rule, notification of the Government and/or other public or competent authority/court c. Delay in grant of any NOC/permission/license connection installation of any services such as lifts, electricity & water connections & meters to the scheme/unit/road NOC or completion certificate from Appropriate Authority the Owners/Promoters having complied with all requirements. d. Delay

EXT52100011532Mar 2020 → Mar 2024

Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Delay on the part of the Local Authority or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliances with the cha

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602880Rajendra Ananda PiseAkash Developers16/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GAD Undertaking for Form 5.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-GAD Southcode.pdf23 Jun 2022
CERSAI detailsFile: Encubrance Certificate South Code.pdf28 Apr 2022
Declaration about Commencement CertificateFile: Southcode Format D.pdf1 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf1 Apr 2022
Form 2AFile: QA.pdf16 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA.pdf16 Mar 2022
Building plan approvalFile: 1.pdf17 Jan 2022
Building Plan Approval (IOD)File: 1.pdf17 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Southcode Qualtiy Assurance.pdf30 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Southcode Arch certificate 26032021.pdf8 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Southcode Arch certificate 12012021.pdf21 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Southcode Arch certificate 08102020.pdf26 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Southcode Arch certificate 16032020.pdf26 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Southcode Architect Certificate 12122019.pdf25 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - GAD Southcode _ 18-19.pdf28 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - GAD Southcode _ 18-19_F.pdf28 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Southcode Arch certificate 25062019.pdf27 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: South code Arch Certificate 13032019.pdf2 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Southcode Architect certificate 13122018.pdf3 Jan 2019
Form 2AFile: quality Southcode.pdf11 Dec 2018
Certificates of CA (Form 5)File: Gagan Southcode Form 5.pdf4 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: South code Arch Certificate 03092018.pdf4 Sep 2018
Building plan approvalFile: southcode 1.pdf29 Aug 2018
Building plan approvalFile: southcode 2.pdf29 Aug 2018
Building plan approvalFile: southcode 3.pdf29 Aug 2018
Building plan approvalFile: southcode 4.pdf29 Aug 2018
Building Plan Approval (IOD)File: southcode 1.pdf29 Aug 2018
Building Plan Approval (IOD)File: southcode 2.pdf29 Aug 2018
Building Plan Approval (IOD)File: southcode 3.pdf29 Aug 2018
Building Plan Approval (IOD)File: southcode 4.pdf29 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: South code Arch Certificate.pdf22 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: South code Arch Certificate.pdf30 Jan 2018
Copy of the legal title reportFile: Search and title report Southcode.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf28 Jul 2017
Proforma of Allotment letterFile: Final Rera_FP_Southcode.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf25 Jul 2017
Details of encumbrancesFile: Encubrance Certificate South Code.pdf24 Jul 2017
Declaration in FORM BFile: Gagan Southcode B Form.pdf24 Jul 2017
Layout approvalFile: Temp03270.pdf19 Jul 2017
Building plan approvalFile: Temp03275.pdf19 Jul 2017
Building plan approvalFile: Temp03276.pdf19 Jul 2017
Building plan approvalFile: Temp03273.pdf19 Jul 2017
Building plan approvalFile: Temp03274.pdf19 Jul 2017
PAN CardFile: PAN Card.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: Temp03270.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp03273.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp03274.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp03275.pdf19 Jul 2017
Building Plan Approval (IOD)File: Temp03276.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 3353-2015.pdf19 Jul 2017

How this compares with Pune

24%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAGAN SOUTHCODE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa13,700+ in Pune

2 kmGAGAN SOUTHCODECompleted 76Lapsed / revoked 46Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 213 registered projects within 2 km.

Builder: GAGAN ACE DEVELOPERS

GAGAN ACE DEVELOPERS has 2 registrations on MahaRERA, including GAGAN KAPITAL and GAGAN SOUTHCODE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that GAGAN SOUTHCODE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GAGAN SOUTHCODE is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAGAN SOUTHCODE?

The registered promoter entity is GAGAN ACE DEVELOPERS, a proprietor as per the filing. Its GSTIN 27ABZPL9697E1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAGAN SOUTHCODE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GAGAN SOUTHCODE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GAGAN SOUTHCODE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAGAN SOUTHCODE?

The professionals named in the filing: Architect: SPACE DESIGNERS SYNDICATE PARTNER SHAIKH ZUBER RASHID; Engineer: G A BHILARE CONSULTANTS PVT LTD; Engineer: Siddhant D Rathod; Chartered Accountant: Milani & Associates; Chartered Accountant: SCT & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAGAN SOUTHCODE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAGAN SOUTHCODE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAGAN SOUTHCODE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.