Home / Browse projects / Pune, Maharashtra / Gagan Klara
Gagan Klara
By Gagan Housing And Landmarks LLP
RG-MH-42052 · RERA P52100019739 · Last updated on MahaRERA portal: 18 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 33 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
- Rs 7.50 crore secured on the land, in favour of ICICI HOME FINANCE COMPANY LIMITED
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gagan Klara is a Others project by Gagan Housing And Landmarks LLP in Pune, Maharashtra, registered with MahaRERA as P52100019739 on 5 Mar 2019. Possession was promised by 30 Mar 2026 and is now 7 months past that date. The completion date has moved by 24 months from the original filing. 308 of the 373 units on this registration are recorded sold or booked, and 29 of 44 construction stages are filed complete. 33 complaints are on record with the regulator.
At a glance
Project
- NameGagan Klara
- TypeOthers
- Location
- Hi Street
- Balewadi
- Haveli
- Pune
- 411045
- Pincode411045
- RERA no.P52100019739
- ReraGenie IDRG-MH-42052
Builder
- NameGagan Housing And Landmarks LLP
- Entity typePartnership
- PartnersVijay Ramesh Jasuja, Rahul Sureshchand Garg
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Mar 2019
- Promised completion30 Mar 2026
- Revised completionRevised to 30 Mar 2026 (originally 30 Mar 2024)
- Buildings4 building records
- Documents filed219 files
Current status
Figures as on 18 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building D - Commercial And MHADA | NA | 14 | 13 | 88 | 33 | 121 |
| Wing A | NA | 25 | 22 | 84 | 0 | 84 |
| Wing B | NA | 25 | 22 | 84 | 0 | 84 |
| Wing C | NA | 25 | 22 | 84 | 0 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 97%.
Building D - Commercial And MHADA71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Wing A88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97% |
Wing B87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 66% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
Wing C88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
Progress on shared amenities15
As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 96% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 99% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 92% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 75% |
| Fire protection and fire safety requirements | Yes | 87% |
| Electrical meter room, sub-station, receiving station | Yes | 87% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed319
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building D - Commercial And MHADA | 67 | 67 |
| Wing A | 92 | 92 |
| Wing B | 80 | 80 |
| Wing C | 80 | 80 |
Land and ownership3
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Shri. Dnyneshwar Ramchandra Balwadkar | Baner | Pune |
| Shri. Namdev Ramchandra Balwadkar | Baner | Pune |
| Ananda Ramchandra Balwadkar | Thergaon | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing C | NA | Rs 27.74 cr | Rs 26.99 cr |
| Wing A | NA | Rs 21.35 cr | Rs 20.72 cr |
| Wing B | NA | Rs 21.25 cr | Rs 20.63 cr |
| Building D - Commercial And MHADA | NA | Rs 15.85 cr | Rs 13.74 cr |
| - | NA | Rs 14.20 cr | Rs 14.08 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R R Malwadkar |
| Engineer | Design Werkz Engineering Pvt Ltd |
| Engineer | Vaibhav Ingavale |
| Chartered Accountant | Sameer Birla |
| Chartered Accountant | Birla & Company |
| Chartered Accountant | K G Jhamvar & Co. |
| Partner | Role in project |
|---|---|
| Gagan Housing And Landmarks LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN KLARA” under implementation by us on land admeasuring 00 H 89 Ares bearing Survey Nos. 38 Hissa No. 8A situate, lying and being at village Balewadi within the Registration Sub- District of Taluka Haveli, District- Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100019739 dated 05/03/2019. 2) In anticipation that we would complete the said Project on or before 30/03/2024, in our application to you for Registration of our Project, we had mentioned the date of Completi
Reason as filed by the promoterWe have received the part occupancy certificate bearing no. OCC/0589/24 on dated 21/08/2024 for building D. And we are in process of obtaining all NOC’s required for application of Completion Certificate to obtain the full occupancy certificate for building A, B and C at earliest. Hence the completion of the project was delayed and we require extension.
Complaints filed with MahaRERA33
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500687 | Gauri Vasant Vazarkar | Gagan Housing And Landmarks LLP | 26/02/2025 |
| CC12500736 | Hitesh Srichand Jairamdasani | Gagan Housing And Landmarks LLP | 04/03/2025 |
| CC12500919 | Sandeep Ashok Kinkar | Gagan Housing And Landmarks LLP | 16/03/2025 |
| CC12501182 | Tushar Deepak Thorat | Gagan Housing And Landmarks LLP | 09/04/2025 |
| CC12501183 | Tejas Deepak Thorat | Gagan Housing And Landmarks LLP | 09/04/2025 |
| CC12501185 | Akshay Chandrakant Tambade | Gagan Housing And Landmarks LLP | 09/04/2025 |
| CC12501452 | Pravin Balaji Dhayfule | Gagan Housing And Landmarks LLP | 29/04/2025 |
| CC12501547 | Chetan Sunilkumar Jain | Gagan Housing And Landmarks LLP | 10/05/2025 |
| CC12501546 | Sumeet Dinkar Gosavi | Gagan Housing And Landmarks LLP | 10/05/2025 |
| CC12501560 | Satish Dhirubhai Mavani | Gagan Housing And Landmarks LLP | 12/05/2025 |
| CC12501595 | Alok Narayan | Gagan Housing And Landmarks LLP | 14/05/2025 |
| CC12501597 | AMRUT ANIL SABNIS | Gagan Housing And Landmarks LLP | 15/05/2025 |
| CC12501618 | Sanket Patil | Gagan Housing And Landmarks LLP | 18/05/2025 |
| CC12502008 | Atul Achyut Jadhav | Gagan Housing And Landmarks LLP | 19/06/2025 |
| CC12502009 | Pavan Diwakar Bonkinpillewar | Gagan Housing And Landmarks LLP | 19/06/2025 |
| CC12502117 | Vaibhav Hemraj Chhaparghare | Gagan Housing And Landmarks LLP | 27/06/2025 |
| CC12502250 | ANUP ASHOK PATTIWAR | Gagan Housing And Landmarks LLP | 05/07/2025 |
| CC12502249 | Dnyaneshwar Digambar Gorade | Gagan Housing And Landmarks LLP | 05/07/2025 |
| CC12502247 | ABHAY Om PRAKASH | Gagan Housing And Landmarks LLP | 05/07/2025 |
| CC12502482 | Priyanka Pramod Ghare | Gagan Housing And Landmarks LLP | 19/07/2025 |
| CC12502481 | Hemlata Saish Chavali | Gagan Housing And Landmarks LLP | 19/07/2025 |
| CC12502483 | Rahul Kailas Shinde | Gagan Housing And Landmarks LLP | 19/07/2025 |
| CC12502612 | Santosh Hari Lokhande | Gagan Housing And Landmarks LLP | 29/07/2025 |
| CC12502831 | Tanushree Jaysingh Shinde | Gagan Housing And Landmarks LLP | 13/08/2025 |
| CC12502916 | Ankit Patil | Gagan Housing And Landmarks LLP | 19/08/2025 |
| CC12503352 | AARATRIKA SEN | Gagan Housing And Landmarks LLP | 19/09/2025 |
| CC12503353 | NILESH SHANKAR KHATTI | Gagan Housing And Landmarks LLP | 19/09/2025 |
| CC12503767 | Vikar Ansar Sheikh | Gagan Housing And Landmarks LLP | 28/10/2025 |
| CC12600510 | MAYUR NAMDEO BALWAKAR Q | Gagan Housing And Landmarks LLP | 29/01/2026 |
| CC12600582 | Rajesh Shankarrao Padgilwar | Gagan Housing And Landmarks LLP | 02/02/2026 |
| CC12603053 | Sakharam Kisan Shinde | Gagan Housing And Landmarks LLP | 23/05/2026 |
| CC12603442 | Sheetal Wattamwar | Gagan Housing And Landmarks LLP | 04/06/2026 |
| CC12604294 | Satish Suryakant Nimje | Gagan Housing And Landmarks LLP | 09/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed219
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 219 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 28 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 28 Nov 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 28 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 29 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 29 Jul 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 29 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 29 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold inventory_0001 (1)_compressed.pdf | 9 May 2025 |
| Other - TechnicalFile: WhatsApp photos 2025-05-08.pdf | 8 May 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 24 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 21 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 21 Apr 2025 |
| Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf | 28 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Gagan Klara 31 12 2024.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31 03 2024_0001 klara_11zon.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30 06 2024_0001 klara_11zon.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30 09 2024_0001 klara_11zon.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31 12 2024_0001 klara_11zon.pdf | 28 Mar 2025 |
| Other - TechnicalFile: PERT Chart Klara.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_0001 (1) klara.pdf | 28 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2024 Klara_compressed.pdf | 26 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 28 Jan 2025 |
| Certificates of CA (Form 3)File: Form-3.pdf | 28 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 28 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 6 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 6 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 6 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Klara Form 5.pdf | 28 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 7 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 7 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 10 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 10 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 10 Jul 2024 |
| Declaration in FORM BFile: Form B.pdf | 11 Mar 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200299606181_For_Asset_Based_Search_07_03_2024_16_46_25_631.pdf | 11 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 11 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 11 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 11 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank.pdf | 11 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A.pdf | 6 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 6 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 6 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 4 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 4 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 4 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 4 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Gagan Klara.pdf | 22 Oct 2023 |
| Layout approvalFile: layout.pdf | 26 Jun 2023 |
| Building plan approvalFile: Building Layout.pdf | 26 Jun 2023 |
| Building plan approvalFile: Basement.pdf | 26 Jun 2023 |
| Building plan approvalFile: Wing A Floor Plan.pdf | 26 Jun 2023 |
| Building plan approvalFile: Wing B Floor Plan.pdf | 26 Jun 2023 |
| Building plan approvalFile: Wing C Floor Plan.pdf | 26 Jun 2023 |
| Building plan approvalFile: Commercial Floor Plan.pdf | 26 Jun 2023 |
| Building plan approvalFile: Mhada Floor Plan.pdf | 26 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 26 Jun 2023 |
| Building Plan Approval (IOD)File: Building Layout.pdf | 26 Jun 2023 |
| Building Plan Approval (IOD)File: Basement.pdf | 26 Jun 2023 |
| Building Plan Approval (IOD)File: Wing A Floor Plan.pdf | 26 Jun 2023 |
| Building Plan Approval (IOD)File: Wing B Floor Plan.pdf | 26 Jun 2023 |
| Building Plan Approval (IOD)File: Wing C Floor Plan.pdf | 26 Jun 2023 |
| Building Plan Approval (IOD)File: Commercial Floor Plan.pdf | 26 Jun 2023 |
| Building Plan Approval (IOD)File: Mhada Floor Plan.pdf | 26 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 26 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Klara final CC.pdf | 26 Jun 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Gagan Signet | Kondhawa Bk Tal. Haveli Pune 411048 | 190 | Completed | Jun 2020 | Jun 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- All 219 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gagan Klara on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Balewadi13,700+ in Pune
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: Gagan Housing And Landmarks LLP
Gagan Housing And Landmarks LLP has 1 registration on MahaRERA, including Gagan Klara. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Gagan Klara shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Gagan Klara is delayed beyond 30 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gagan Klara?
The registered promoter entity is Gagan Housing And Landmarks LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gagan Klara?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Gagan Klara?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Gagan Klara?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gagan Klara?
The professionals named in the filing: Architect: R R Malwadkar; Engineer: Design Werkz Engineering Pvt Ltd; Engineer: Vaibhav Ingavale; Chartered Accountant: Sameer Birla; Chartered Accountant: Birla & Company; Chartered Accountant: K G Jhamvar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gagan Klara?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback