Home / Browse projects / Pune, Maharashtra / GAGAN CEFIRO PHASE 3
GAGAN CEFIRO PHASE 3
RG-MH-10097 · RERA P52100002655 · Last updated on MahaRERA portal: 2 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 7 complaints at MahaRERA
- Completion date moved by 45 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GAGAN CEFIRO PHASE 3 is a Residential / Group Housing project by GAGAN UNNATI PROMOTERS in Pune, Maharashtra, registered with MahaRERA as P52100002655 on 2 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 45 months from the original filing. 30 of the 37 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 7 complaints are on record with the regulator.
At a glance
Project
- NameGAGAN CEFIRO PHASE 3
- TypeResidential / Group Housing
- Location
- Undri Pisoli road
- Undri
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100002655
- ReraGenie IDRG-MH-10097
Builder
- NameGAGAN UNNATI PROMOTERS
- Entity typePartnership
- PartnersGAGAN LIFESPACE LLP THROUGH AUTHORISED PARTNER SUSHIL AGARWAL, UNNATI WORLD LIFEPACE LLP THROUGH AUTHORISED PARTNER NIKUNJ SANGHVI
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Aug 2017
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 31 Mar 2020)
- Buildings2 building records
- Documents filed61 files
Current status
Figures as on 2 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING B1 | NA | 12 | 0 | 37 | 0 | 37 |
| BUILDING B2 | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 90%.
BUILDING B183%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BUILDING B283%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities16
As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| SWIMMING POOL | Yes | 100% |
Parking filed37
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING B1 | 18 | 18 |
| BUILDING B2 | 19 | 19 |
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MAHALAXMI PUNYAI DEVELOPERS | UNDRI | Pune |
| VANITA ARUN BHAGTANI | Pune (M Corp.) | Pune |
| BHARATI ARJUN BHAGTANI | Pune (M Corp.) | Pune |
| KISHOR ARJUN BHAGTANI | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS TARAWADI |
| Engineer | G A BHILARE CONSULTANTS PVT LTD |
| Engineer | siddhanath kamble |
| Chartered Accountant | shankar agarwal |
| Partner | Role in project |
|---|---|
| GAGAN UNNATI PROMOTERS | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOn Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. any notice, order, rule, notification of the Government and/or other public or competent authority/court c. Delay in grant of any NOC/permission/license/ connection installation of any services such as lifts, electricity & water connections & meters to the scheme/unit /road NOC or completion certificate from Appropriate Authority the Promoters/Owners having complied with all requirements. d. Del
Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Delay on the part of the Local Authority or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliances with the cha
Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Delay on the part of the Local Authority or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliances with the cha
Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Delay on the part of the Local Authority or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliances with the cha
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000177947 | Nirmala Bhosale | M/s Gagan Unnati Promoters | 23/12/2022 |
| CC005000000228390 | Raviraj Rajendra Gaikwad | Gagan Unnati Promoters | 06/03/2023 |
| CC005000000238517 | Vaibhav Ashok Kalange | Gagan Unnati Promoters | 04/04/2023 |
| CC005000000310383 | Rahul Anil Gadkar | Gagan Unnati Promoters | 22/07/2024 |
| CC12401250 | Rahul Anilrao Gadkar | GAGAN UNNATI PROMOTERS | 27/12/2024 |
| CC12500246 | Shyam Babu Choudhary | GAGAN UNNATI PROMOTERS | 24/01/2025 |
| CC12602260 | GAGAN UNNATI PROMOTERS | Nishant Kumar Pathak | 17/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Jun 2024
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form - 1 (1).pdf | 2 Jun 2026 |
| Form 2File: Form - 2 (1).pdf | 2 Jun 2026 |
| Form 3File: Form - 3 (1)_compressed.pdf | 2 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD (5).pdf | 2 Jun 2026 |
| Declaration in FORM BFile: FORM B.pdf | 19 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B1B2 Completion.pdf | 26 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Under Taking FY 21-22.pdf | 5 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Under Taking FY 22-23.pdf | 5 Oct 2023 |
| Declaration in FORM BFile: Rera Affidavit Cefiro.pdf | 4 Oct 2023 |
| Certificates of CA (Form 3)File: RERA FORM 3.pdf | 4 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gagan Cefiro Engineer Certificate.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate for quality asuarance_c.pdf | 3 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Gagan Cefiro Sold book Inventory_c.pdf | 29 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera-Architect Certificate-min.pdf | 28 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera- Engineer Certificate-min.pdf | 28 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FY 18-19.pdf | 18 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 19-20.pdf | 18 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 20-21.pdf | 18 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Undertaking for form 5.pdf | 18 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 21.pdf | 17 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 22.pdf | 17 Mar 2023 |
| Declaration about Commencement CertificateFile: Cefiro Format D.pdf | 16 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Cefiro Sold Unsold Inventory 1.pdf | 16 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Cefiro Revised Sold Unsold Inventory.pdf | 25 Jan 2023 |
| Layout approvalFile: Cefiro Layout sanction1.pdf | 29 Jun 2022 |
| Building plan approvalFile: Cefiro Building sanction1.pdf | 29 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: Cefiro Layout sanction1.pdf | 29 Jun 2022 |
| Building Plan Approval (IOD)File: Cefiro Building sanction1.pdf | 29 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Cefiro Sold Unsold Inventory.pdf | 23 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro Ph 3 Arch certificate 31122021.pdf | 4 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro Ph 3 Arch certificate 23032020.pdf | 10 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro Ph 3 Arch certificate 06112020.pdf | 10 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro Arch Certificate Phase 3 21062019.pdf | 27 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Cefiro Architect certificate Phase 3 29032019.pdf | 2 Apr 2019 |
| Form 2AFile: Cefiro Ph 3 Quality assurance Certificate.pdf | 11 Dec 2018 |
| Certificates of CA (Form 5)File: Gagan Cefiro Phase 3 Form 5.pdf | 4 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro ph 3 Arch certificate 25082018.pdf | 28 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro Ph 3 26042018.pdf | 3 May 2018 |
| Layout approvalFile: Cefiro PH 3 Latest Sanction.pdf | 16 Apr 2018 |
| Copy of Layout Approval (in case of layout)File: Cefiro PH 3 Latest Sanction.pdf | 16 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro ph 3 Arch certificate.pdf | 18 Jan 2018 |
| Details of encumbrancesFile: Encumbrance Cefiro.pdf | 6 Dec 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Cefiro ph 3 arch certificate 1112017.pdf | 1 Nov 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: REV ARCH CERT CEFIRO PH 3.pdf | 23 Aug 2017 |
| Layout approvalFile: Temp04297 PHASING VK 1.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Temp04297 PHASING VK 1.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: B-Form_Phase III_GUP.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate phase 3.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate phase 3.pdf | 27 Jul 2017 |
| Certificates of CA (Form 3)File: CEFIRO CA CERT PHASE 3.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: Phase III_FP_ Gagan Cefiro.pdf | 26 Jul 2017 |
| Building plan approvalFile: Temp04301.pdf | 20 Jul 2017 |
| Building plan approvalFile: Temp04300.pdf | 20 Jul 2017 |
| Building plan approvalFile: Temp04303.pdf | 20 Jul 2017 |
| PAN CardFile: Gagan Unnati Promters Pan No (1).pdf | 20 Jul 2017 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 20 Jul 2017 |
| Details of encumbrancesFile: Mortgage Deed Index II 7711-2015.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: Temp04303.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: Temp04301.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: Temp04300.pdf | 20 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: NA_Order-dt-31-3-2015.pdf | 20 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GAGAN CEFIRO SHOPS | UNDRI PUNE 411028 | 12 | Completed | Mar 2018 | Jan 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GAGAN CEFIRO PHASE 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
Filed coordinates, straight-line distance. 156 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: GAGAN UNNATI PROMOTERS
GAGAN UNNATI PROMOTERS has 3 registrations on MahaRERA, including GAGAN CEFIRO PHASE 2 and GAGAN CEFIRO PHASE 3. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that GAGAN CEFIRO PHASE 3 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GAGAN CEFIRO PHASE 3 is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GAGAN CEFIRO PHASE 3?
The registered promoter entity is GAGAN UNNATI PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GAGAN CEFIRO PHASE 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GAGAN CEFIRO PHASE 3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GAGAN CEFIRO PHASE 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GAGAN CEFIRO PHASE 3?
The professionals named in the filing: Architect: VILAS TARAWADI; Engineer: G A BHILARE CONSULTANTS PVT LTD; Engineer: siddhanath kamble; Chartered Accountant: shankar agarwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GAGAN CEFIRO PHASE 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback