Completed No litigation declared Residential / Group Housing project

GAGAN AKANKSHA PHASE 1

By GAGAN HORIZON VENTURES

RG-MH-08453 · RERA P52100001285 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • 20 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
48 of 55Construction stages doneacross 5 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
20Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

GAGAN AKANKSHA PHASE 1 is a Residential / Group Housing project by GAGAN HORIZON VENTURES in Pune, Maharashtra, registered with MahaRERA as P52100001285 on 27 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing. 20 complaints are on record with the regulator.

At a glance

Project

  • NameGAGAN AKANKSHA PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Koregaon Mul
    • Haveli
    • Pune
    • 411202
  • Pincode411202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001285
  • ReraGenie IDRG-MH-08453

Builder

  • NameGAGAN HORIZON VENTURES
  • Entity typeOthers
  • Named personsPUNE URBAN PROJECTS, GAGAN HORIZON DEVELOPERS

Key dates

this monthRegisteredJul 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings5 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A1NA90000
BUILDING A2NA90000
BUILDING A3NA90000
BUILDING A4NA90000
BUILDING A5NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

BUILDING A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A588%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80
BuildingClosed/CoveredTotal
BUILDING A11616
BUILDING A21616
BUILDING A31616
BUILDING A41616
BUILDING A51616

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,443 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PUNE URBAN PROJECTSPune (M Corp.)Pune

Approvals and building plan

Permissible FSI15464.01
Proposed, not sanctioned15,464 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAUNDH PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARVEJ JAMADAR & ASSOCIATES
EngineerHANSAL PARIKH & ASSOCIATES
PartnerRole in project
GAGAN HORIZON VENTURES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001183Dec 2018 → Dec 2019

Reason as filed by the promoterThe project “Gagan Akanksha” situated at Gat no 524, Koregaon Mul, Taluka Haveli, District Pune has been registered with Hon’ble RERA authority under registration no. P52100001285 dated 27/07/2017. As per the said certificate issued by this Hon’ble Authority the completion date for “Gagan Akanksha Phase I” was 31st December 2018. We wish to inform you that the said project is delayed due to delay in grant of environment clearance from the concerned authority, which was finally issued on 13/06/2018. We are pleased to inform you that we have completed the construction of “Gagan Akanksha Phase I”

Complaints filed with MahaRERA20

Case no.ComplainantRespondentFiled
CC005000000010933Jyoti Vidyadhar PinjarkarGagan Horizone Ventures through its Partner Sushil Agrawal25/01/2018
CC005000000000091SUNIL NATHURAM UTTEKARGAGAN HORIZON VENTURES05/09/2017
CC005000000011128PALLAVI YOGESH GAVATEM/S GAGAN HORIZON VENTURES15/03/2018
CC005000000022028Sushant Suhas Gaikwad and Manasi Sushant GaikwadGagan Horizon Ventures06/10/2018
CC005000000022077PRAKASH PATELNILESH LADDAD09/10/2018
CC005000000022106VINOD PRAKASH DEOKARGAGAN HORIZON VENTURE04/10/2018
CC005000000022107Yojana Vinod DeokarGagan Horizon Ventures04/10/2018
CC005000000022134Sandesh Janardhan KaleGagan Horizon Ventures15/10/2018
CC005000000022760hemant Martandrao kulkarni and 1 otherGagan Horizon Ventures and ors08/03/2019
CC005000000022990NITIN SADASHIV TEKAWADE & SEEMA NITIN TEKAWADEGAGAN HORIZON VENTURES06/05/2019
CC005000000022960Ketan Dilip ShahGagan Horizon Venture27/04/2019
CC005000000023097JAYASHRI RAJANIKANT SIKACHIGAGAN HORIZON VENTRES05/06/2019
CC005000000023215Benjamin Samul Gadkar and Saurabh Benjamin GadkarGagan Horizon Ventures through its partners Pramod Mohanlal Bafna and Nilesh Ishwar Ladd21/07/2019
CC005000000023407Mrs.Kalpana Ankush PomaneGagan Horizon Ventures thorugh its authorized person08/09/2019
CC005000000033591Ajinkya Vijay GhareGagan Horizon Ventures24/11/2019
CC005000000043662NASIR IBRAHIM PENDHARIGAGAN HORIZON VENTURES19/11/2019
CC005000000064903Kapil Tukaram NadgeriM/S Gahan Horizon Venture partner Mr. Sushil Ghanshyam Agarwal & Mr. Nilesh Ishwar Laddad08/04/2021
CC005000000085293NAZIMA ISMAIL PATELGAGAN HORIZON VENTURES THROUGH ITS AUTHORIZED SIGNATORY02/03/2021
CC005000000085385Mr Kalyan Dattatray ShindeMrs Varsha Kalyan Shinde25/03/2021
CC005000000085483Mr Sunil Pralhad WavareGAGAN HORIZON VENTURES THROUGH ITS AUTHORIZED SIGNATORY22/04/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Dec 2019

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: Form 4 Akanksha (A1-A5).pdf12 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Akanksha Ph 1 Arch Certificate 21122019.pdf31 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Akanksha Completion certificate.pdf31 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Akanksha Architect Certificate 27062019.pdf4 Jul 2019
Certificates of Architect (Form 4)File: Form 4 Akanksha.pdf16 May 2019
Form 2AFile: Akanksha Quality Assurance certificate.pdf20 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Akanksha Architect certificate 14122018.pdf18 Dec 2018
Certificates of CA (Form 5)File: Gagan Akanksha Phase 1 Form 5.pdf4 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Akanksha Arch certificate 31082018.pdf4 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Akanksha arch certificate 24042018.pdf24 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Akanksha Arch certificate.pdf18 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate.pdf26 Oct 2017
Certificates of CA (Form 3)File: CA CERTIFICATE1.pdf26 Jul 2017
Proforma of Allotment letterFile: 25-07-17-Rera_FP_for_Gagan_Akanksha.pdf26 Jul 2017
Copy of the legal title reportFile: TITLE REPORT.pdf25 Jul 2017
Details of encumbrancesFile: No Encubrance Certificate.pdf25 Jul 2017
Declaration in FORM BFile: Form B -Gagan Horizon.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: compressed_524 gagan (1).pdf24 Jul 2017
Building plan approvalFile: Akanksha 2-9.pdf13 Jul 2017
Building plan approvalFile: Akanksha 3-9.pdf13 Jul 2017
Building plan approvalFile: Akanksha 4-9.pdf13 Jul 2017
Building plan approvalFile: Akanksha 6-9.pdf13 Jul 2017
Building plan approvalFile: Akanksha 7-9.pdf13 Jul 2017
Building plan approvalFile: Akanksha 8-9.pdf13 Jul 2017
Building plan approvalFile: Akanksha 7-9.pdf13 Jul 2017
Building Plan Approval (IOD)File: Akanksha 2-9.pdf13 Jul 2017
Building Plan Approval (IOD)File: Akanksha 3-9.pdf13 Jul 2017
Building Plan Approval (IOD)File: Akanksha 4-9.pdf13 Jul 2017
Building Plan Approval (IOD)File: Akanksha 6-9.pdf13 Jul 2017
Building Plan Approval (IOD)File: Akanksha 7-9.pdf13 Jul 2017
Building Plan Approval (IOD)File: Akanksha 8-9.pdf13 Jul 2017
Building Plan Approval (IOD)File: Akanksha 7-9.pdf13 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: N-A Order -2013 Gagan Akanksha.pdf13 Jul 2017
Layout approvalFile: AKANKSHA.pdf12 Jul 2017
PAN CardFile: GHV PAN.pdf12 Jul 2017
Copy of Layout Approval (in case of layout)File: AKANKSHA.pdf12 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAGAN AKANKSHA PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koregaon mul13,700+ in Pune

2 kmGAGAN AKANKSHA PHASE 1Completed 5Lapsed / revoked 3Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: GAGAN HORIZON VENTURES

GAGAN HORIZON VENTURES has 1 registration on MahaRERA, including GAGAN AKANKSHA PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GAGAN AKANKSHA PHASE 1 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAGAN AKANKSHA PHASE 1?

The registered promoter entity is GAGAN HORIZON VENTURES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAGAN AKANKSHA PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GAGAN AKANKSHA PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GAGAN AKANKSHA PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAGAN AKANKSHA PHASE 1?

The professionals named in the filing: Architect: PARVEJ JAMADAR & ASSOCIATES; Engineer: HANSAL PARIKH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAGAN AKANKSHA PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAGAN AKANKSHA PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAGAN AKANKSHA PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.