Home / Browse projects / Daman, Daman & Diu / Fortune Skyes
Fortune Skyes
By Fortune Dream-con Private Limited
RG-MH-00344 · RERA P49500000023 · Last updated on MahaRERA portal: 26 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Fortune Skyes is a Residential / Group Housing project by Fortune Dream-con Private Limited in Daman, Daman & Diu, registered with MahaRERA as P49500000023 on 9 Jan 2020. Possession was promised by 11 Jun 2025 and is now 16 months past that date. The completion date has moved by 15 months from the original filing. 22 of the 40 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameFortune Skyes
- TypeResidential / Group Housing
- Location
- Devka Road
- Devka
- Nani Daman
- Daman
- 396210
- Pincode396210
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49500000023
- ReraGenie IDRG-MH-00344
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Jan 2020
- Promised completion11 Jun 2025
- Revised completionRevised to 11 Jun 2025 (originally 30 Mar 2024)
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 26 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Fortune Skyes | NA | 5 | 4 | 40 | 0 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Fortune Skyes: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Fortune Skyes | NA | Rs 10.80 cr | Rs 8.27 cr |
| - | NA | Rs 3.60 cr | Rs 2.07 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ajit B Jariwala & Associates BABUBHAI JARIWALA |
| Engineer | Dineshkumar Balubhai Patel balubhai patel |
| Chartered Accountant | Jignesh V Vasani VASANTLAL Vasani |
| Chartered Accountant | PRAKASHCHANDRA RUDREJI DESAI |
| Chartered Accountant | SHRADHA VATSAL MEHTA |
| Partner | Role in project |
|---|---|
| Fortune Dream-con Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project has been completed and we hold a full occupancy certificate. As a result, we have applied for a post facto extension. The project is located in Daman, and the occupancy certificate was issued on 11.06.2025. We have uploaded both occupancy certificates, along with the email correspondence from the competent authority. Therefore, we respectfully ask the authority to process our application and finalize the proposal in the MahaRERA portal. Thank you for your attention to this matter.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jan 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jan 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Sky OC Drg..pdf | 26 Jun 2026 |
| Withdrawal Update Form 1File: ACHITECT CERTIFICATE.pdf | 26 Jun 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf | 26 Jun 2026 |
| Withdrawal Update Form 3File: Sky form 3.pdf | 26 Jun 2026 |
| Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT) (1).pdf | 17 Nov 2025 |
| Form 1File: form 1 Sky.pdf | 1 Sep 2025 |
| Form 2File: Form 2.PDF | 1 Sep 2025 |
| Form 3File: Form 3 Certificate Fortune Sky.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclouser.pdf | 1 Sep 2025 |
| Form 1File: Form-1-F skyes.pdf | 1 Sep 2025 |
| Form 2File: fORM-2.PDF | 1 Sep 2025 |
| Form 3File: Form 3 skyes.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclouser.pdf | 1 Sep 2025 |
| Form 1File: Form - 1.PDF | 1 Sep 2025 |
| Form 2File: Form-2.pdf | 1 Sep 2025 |
| Form 3File: Form-3.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclouser.pdf | 1 Sep 2025 |
| Form 1File: Form 1 Fortune Skyes.pdf | 1 Sep 2025 |
| Form 2File: Form 2 skyes.pdf | 1 Sep 2025 |
| Form 3File: form 3 (2).pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclouser.pdf | 1 Sep 2025 |
| Form 2File: F-SKYES FORM-2 AS 30-09-2024.PDF | 1 Sep 2025 |
| Form 3File: F-SKYES FORM-3 AS 30-09-2024.PDF | 1 Sep 2025 |
| Form 1File: F-SKYES FORM-1 AS 30-09-2024.PDF | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclouser.PDF | 1 Sep 2025 |
| Form 1File: architect certificate Skyes.pdf | 1 Sep 2025 |
| Form 2File: Form 2.PDF | 1 Sep 2025 |
| Form 3File: Form 3 CA.pdf | 1 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclouser.pdf | 1 Sep 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: F-SKYES FORM-1 AS 31-03-2024.PDF | 9 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: F-SKYES FORM-1 AS 30-06-2024.PDF | 9 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: F-SKYES FORM-1 AS 31-09-2024.PDF | 9 Jan 2025 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: F-SKYES FORM-1 AS 31-12-2023.PDF | 9 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: F-SKYES FORM-3 AS 30-09-2024.PDF | 9 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: F-SKYES FORM-3 AS 30-06-2024.PDF | 9 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: F-SKYES FORM-3 AS 31-03-2024.PDF | 9 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: F-SKYES FORM-3 AS 12-03-2024.PDF | 9 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: F-SKYES FORM-2 AS 31-12-2023.PDF | 9 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: F-SKYES FORM-2 AS 31-03-2024.PDF | 9 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: F-SKYES FORM-2 AS 30-06-2024.PDF | 9 Jan 2025 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: F-SKYES FORM-2 AS 30-09-2024.PDF | 9 Jan 2025 |
| Certificates of CA (Form 3) (UT)File: Form 3 Jun 24.pdf | 26 Nov 2024 |
| Certificates of CA (Form 3) (UT)File: Form 3 Sep 24.pdf | 26 Nov 2024 |
| Certificates of CA (Form 3) (UT)File: Form 3 Mar 24.pdf | 26 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FORTUNE SKYES 23-24.pdf | 26 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FORTUNE SKYES 23-24.pdf | 26 Nov 2024 |
| Certificates of CA (Form 3) (UT)File: Form 3 Certificate Fortune Sky 03-12-2024.pdf | 12 Nov 2024 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Form 2 31-12-2023.PDF | 12 Nov 2024 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM-2 31-03-2024.PDF | 12 Nov 2024 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM-2 30-06-2024.PDF | 12 Nov 2024 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: FORM-2 30-09-2024.PDF | 12 Nov 2024 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: form-1 31-09-2024.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) (UT)File: Form 5 Fortune skyes 20-21.pdf | 25 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 fortune skyes 21-22.pdf | 25 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Fortune Skyes.pdf | 25 May 2024 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Sky Qtr 4_rotated.pdf | 10 Feb 2024 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Fortune Skys.pdf | 15 Jan 2021 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Fortune Skyes 31-3-2020.pdf | 12 Nov 2020 |
| Certificates of Architect (Form 1) (UT)(Mandatory for only ongoing project)File: Fortune Skyes 30-9-2020.pdf | 12 Nov 2020 |
| Certificates of Engineer (Form 2) (UT) (Mandatory for only ongoing project)File: Fortune Skyes 31-3-2020.pdf | 12 Nov 2020 |
| Proforma of Allotment letterFile: 5-2 Agreement for Sale draft.pdf | 7 Jan 2020 |
| Layout approvalFile: 12-Layout 1_page-0001.pdf | 6 Jan 2020 |
| Building plan approvalFile: 13-1-building plan.pdf | 6 Jan 2020 |
| Building plan approvalFile: 13-2-building plan.pdf | 6 Jan 2020 |
| Building plan approvalFile: 13-3 building plan.pdf | 6 Jan 2020 |
| Building plan approvalFile: 13-4 building plan.pdf | 6 Jan 2020 |
| Building plan approvalFile: 13-5 building plan.pdf | 6 Jan 2020 |
| Building plan approvalFile: 13-6 building plan.pdf | 6 Jan 2020 |
| PAN CardFile: 2 company_PAN.pdf | 6 Jan 2020 |
| Copy of the legal title reportFile: 3-Title report.pdf | 6 Jan 2020 |
| Details of encumbrancesFile: 4-1 -NIL ENCUMBARANCE.pdf | 6 Jan 2020 |
| Details of encumbrancesFile: 4-Nil encumbarance certificate.pdf | 6 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: 12-Layout 1_page-0001.pdf | 6 Jan 2020 |
| Building Plan Approval (IOD)File: 13-1-building plan.pdf | 6 Jan 2020 |
| Building Plan Approval (IOD)File: 13-2-building plan.pdf | 6 Jan 2020 |
| Building Plan Approval (IOD)File: 13-3 building plan.pdf | 6 Jan 2020 |
| Building Plan Approval (IOD)File: 13-4 building plan.pdf | 6 Jan 2020 |
| Building Plan Approval (IOD)File: 13-5 building plan.pdf | 6 Jan 2020 |
| Building Plan Approval (IOD)File: 13-6 building plan.pdf | 6 Jan 2020 |
| Commencement CertificatesFile: 10-commencement certificate.pdf | 6 Jan 2020 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| fortune Ambach | Ambach | 1 | Completed | Oct 2017 | Apr 2017 |
| Fortune Darshan | Vapi | 1 | Completed | Jun 2017 | Mar 2017 |
| Fortune Colors | Vapi | 1 | Completed | Dec 2014 | Dec 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Daman
Computed across the 59 Daman projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Fortune Skyes on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Devka, Nani Daman59 in Daman
Fortune DP Nano-2 Phase - 2
G B AND ASSOCIATES
FORTUNE WORLD - 2
FORTUNE DREAM - CON PVT LTD
NEO PARK
MS DARSHAN REALITY
TULSI RESIDENCY
OM ENTERPRISE
Shree Hari Commercial Building Phase 1
ASHOKKUMAR HARIBHAI TANDEL
EXOTICA RESIDENCY
R THREE DEVELOPERS
See every Daman project, with the district possession charts
Builder: Fortune Dream-con Private Limited
Fortune Dream-con Private Limited has 3 registrations on MahaRERA, including Fortune Skyes and FORTUNE SHIV. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Daman district page.
Frequently asked questions
What does it mean that Fortune Skyes shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Fortune Skyes is delayed beyond 11 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Fortune Skyes?
The registered promoter entity is Fortune Dream-con Private Limited, a company as per the filing. Its GSTIN 26AABCF4561F1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Fortune Skyes?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Fortune Skyes?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Fortune Skyes?
The professionals named in the filing: Architect: Ajit B Jariwala & Associates BABUBHAI JARIWALA; Engineer: Dineshkumar Balubhai Patel balubhai patel; Chartered Accountant: Jignesh V Vasani VASANTLAL Vasani; Chartered Accountant: PRAKASHCHANDRA RUDREJI DESAI; Chartered Accountant: SHRADHA VATSAL MEHTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Fortune Skyes?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback