ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Foresta Phase I

Registered No litigation declared Residential / Group Housing project

Foresta Phase I

By MACHI SUITES LLP

RG-MH-22351 · RERA P52100031158 · Last updated on MahaRERA portal: 4 Sep 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 25 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 25 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
13 of 60Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 223 documents Report an error

Foresta Phase I is a Residential / Group Housing project by MACHI SUITES LLP in Pune, Maharashtra, registered with MahaRERA as P52100031158 on 11 Oct 2021. Possession is promised by 26 Oct 2026. The completion date has moved by 25 months from the original filing. 47 of the 60 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameForesta Phase I
  • TypeResidential / Group Housing
  • Location
    • PAUD BHADAS ROAD
    • NEAR Mahindra United World College India
    • Ravade
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031158
  • ReraGenie IDRG-MH-22351

Builder

  • NameMACHI SUITES LLP
  • Entity typeOthers
  • GSTIN27ABPFM1354H1Z2
  • PartnersRUPESH VILAS CHAVAN Chavan, JYOTIPRASAD VILAS CHAVAN Chavan, MACHI SUITES LLP Vishal Chavan, HIGH YIELD FORTUNE PVT LTD Mugdha Chavan
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2021First promiseSep 2024Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Oct 2021
  • Promised completion26 Oct 2026
  • Revised completionRevised to 26 Oct 2026 (originally 6 Sep 2024)
  • Buildings1 building record
  • Documents filed223 files

Current status

78%47 of 60 units booked
100.0%Work done, per cost certificate

Figures as on 4 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG 01NA3360060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BLDG 01: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Open Space90

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,690 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Sep 2026
LandownerVillageDistrict
MR. RUPESH VILAS CHAVANHadapsarPune
VISHAL CHAVANKatrajPune
MUGDHA CHAVANHadapsarPune
MACHI SUITES LLPwanwadiPune
HIGH YIELD FORTUNE PVT. LTD.wanwadiPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI3691.0
Proposed, not sanctioned1,498 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShowroom No A Wing B KPCT Mall Fatimanagar Pune-411040
Estimated costRs 11.90 cr
Cost incurredRs 11.90 cr
Work done100.0%
BuildingWingEstimatedIncurred
BLDG 01NARs 10.50 crRs 10.50 cr
-NARs 1.40 crRs 1.40 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEpic Design Pvt Ltd
EngineerKishor Nikam
Chartered AccountantAhwin Kapoor
Chartered AccountantJagdish Salunkhe
Chartered AccountantKP Joshi & Associates
PartnerRole in project
MACHI SUITES LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024690Sep 2024 → Sep 2025

Reason as filed by the promoterThe delay is majorly due to significant Material shortages, which severely have impacted the construction timeline, delaying important stages of project. However, we are nearing the project completion and preparing to apply for OC. Hence, additional time is required to address the delays, requesting you to grant us the same.

EA22042620693Sep 2024 → Oct 2026

Reason as filed by the promoterWe received the Full Occupancy Certificate (OC) on 07/10/2025, and possession has also been handed over to the allottees. However, as the number of units had increased and was not updated on MahaRERA, we applied for correction (Ref. No.: PCRCN10062512196) on 05/12/2025 prior to applying for project completion. The application was scrutinized with remarks “The project completion date is now expired. Hence, it is requested to obtain extension for the project by applying under extension module. Thereafter, apply for the required correction.”. Though the project is completed, we are still applying

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12500478Manish SoodMACHI SUITES LLP12/02/2025
CC12604446Ayaz Munaf KhanMACHI SUITES LLP17/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 26 Oct 2026

Documents filed223

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 223 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q1 Foresta P1 Form 1 Sign Stamp.pdf4 Sep 2026
Withdrawal Update Form 2File: Q1 Foresta P1 Form 2 Sign Stamp.pdf4 Sep 2026
Withdrawal Update Form 3File: Q1 Foresta P1 Form 3 Sign Stamp.pdf4 Sep 2026
Withdrawal Update Form 1File: Foresta I Q4 Form 1.pdf3 Sep 2026
Withdrawal Update Form 2File: Foresta I Q4 Form 2.pdf3 Sep 2026
Withdrawal Update Form 3File: Foresta I Q4 Form 3 c.pdf3 Sep 2026
Withdrawal Update Form 1File: Foresta 1 Q3 Form1.pdf2 Sep 2026
Withdrawal Update Form 2File: Foresta 1 Q3 Form 2.pdf2 Sep 2026
Withdrawal Update Form 3File: Foresta 1 Q3 Form 3 c.pdf2 Sep 2026
Form 2A (FY 2025-2026)File: Foresta p1 Form 2A Sign Stamp.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf31 Mar 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf31 Mar 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3_Q2_25-26_Foresta Phase I_Signed.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3_Q2_25-26_Foresta Phase I_Signed.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3_Q2_25-26_Foresta Phase I_Signed.pdf31 Mar 2026
Form 5 (FY 2024-2025)File: Final Form 5.pdf16 Feb 2026
Form 2A (FY 2024-2025)File: From 2A 2024 - 2025.pdf6 Feb 2026
Form 1File: Form 1 Q1 Architect.pdf9 Dec 2025
Form 2File: Form 2 Q1 Engineer.pdf9 Dec 2025
Form 3File: Form 3 -Q1 - FY 24-25.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Foresta ph-1.pdf9 Dec 2025
Form 1File: Form 1 Q2 Architect.pdf9 Dec 2025
Form 2File: Form 2 Q 2 Engineer.pdf9 Dec 2025
Form 3File: Form 3 Q 2 CA.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Foresta ph1.pdf9 Dec 2025
Form 1File: Form 1 - Certificate of Project Architect.pdf9 Dec 2025
Form 2File: Form 2 Q3 24-25.pdf9 Dec 2025
Form 3File: Form 3 Q3 24-25 (2).pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - booked inventory foresta phase I.pdf9 Dec 2025
Form 1File: Form 1 - Certificate of Project Architect.pdf9 Dec 2025
Form 2File: Form 2 - Foresta.pdf9 Dec 2025
Form 3File: Form_3_Q4_24-25_Foresta_Phase_I__Final_compressed.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD.pdf9 Dec 2025
Withdrawal Update Form 1File: Form 1 Q2.pdf9 Dec 2025
Withdrawal Update Form 2File: Form 2 Q2.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3_Q2_25-26_Foresta Phase I_Signed.pdf9 Dec 2025
Withdrawal Update Form 1File: Form1 Q1Foresta Phase I.pdf1 Oct 2025
Withdrawal Update Form 2File: Form 2 Q1Foresta Phase I.pdf1 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1Foresta Phase I.pdf1 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Certificate of Project Architect.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Q4_24-25_Foresta_Phase_I__Final_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Foresta.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf19 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf12 Feb 2025
Declaration about Commencement CertificateFile: Format D - Declaration of CC.pdf12 Feb 2025
Declaration about Commencement CertificateFile: Format D - Declaration of CC.pdf12 Feb 2025
Details of encumbrancesFile: Foresta PH I details of encumbrance.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Certificate of Project Architect.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 24-25 (2).pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold - booked inventory foresta phase I.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold - booked inventory foresta phase I.pdf27 Jan 2025
CERSAI detailsFile: CERSAI Declaration with Index 2.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 24-25.pdf24 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Decleration bank acc.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 2021-22.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 2021-22.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1 2022-23.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 2022-23.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 2022-23.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 2022-23.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Architecture- F1 Q1.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 F1Q2.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 F1 Q3.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 Architect.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 Architect.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 Architect.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 24-25.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 21-22.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 21-22.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 22-23.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 22-23.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 22-23.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 22-23.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 21-22.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 21-22_compressed.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 22-23.pdf23 Jan 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Foresta Phase IGat No. 377 379 38 Ravade Near Mahindra United World Paud Bhadas Road Mulshi Pune 41210860OngoingSep 2024Sep 2024
ELITE PH-IIBORIANDI-CompletedJan 2019Jan 2019
Wai woodsGat No 618 635 636 207 warkhadi wadiTal Wai Dist Satara-CompletedFeb 2018Feb 2018
Golden AcersGat no 44 Borate Vasti Tal Daund Dist Pune-CompletedAug 2016Aug 2016
EliteGat No 407 Boribhadak Tal Daund Dist Pune-CompletedJul 2015Jul 2015

How this compares with Pune

78%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 25 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Foresta Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR Mahindra United World College India13,700+ in Pune

2 kmForesta Phase ICompleted 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: MACHI SUITES LLP

MACHI SUITES LLP has 1 registration on MahaRERA, including Foresta Phase I. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Foresta Phase I is delayed beyond 26 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Foresta Phase I?

The registered promoter entity is MACHI SUITES LLP, an others as per the filing. Its GSTIN 27ABPFM1354H1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Foresta Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Foresta Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Foresta Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Foresta Phase I?

The professionals named in the filing: Architect: Epic Design Pvt Ltd; Engineer: Kishor Nikam; Chartered Accountant: Ahwin Kapoor; Chartered Accountant: Jagdish Salunkhe; Chartered Accountant: KP Joshi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Foresta Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Foresta Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Foresta Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.