Home / Browse projects / Pune, Maharashtra / Forest Trails Everglades H3 and H4

Registration lapsed No litigation declared Residential / Group Housing project

Forest Trails Everglades H3 and H4

By PARANJAPE SCHEMES (CONSTRUCTION) LTD

RG-MH-13170 · RERA P52100022655 · Last updated on MahaRERA portal: 8 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
18 of 260Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Forest Trails Everglades H3 and H4 is a Residential / Group Housing project by PARANJAPE SCHEMES (CONSTRUCTION) LTD in Pune, Maharashtra, registered with MahaRERA as P52100022655 on 10 Oct 2019. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 242 of the 260 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameForest Trails Everglades H3 and H4
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100022655
  • ReraGenie IDRG-MH-13170

Builder

  • NamePARANJAPE SCHEMES (CONSTRUCTION) LTD
  • Entity typeCompany
  • ChairpersonSHRIKANT PURUSHOTTAM PARANJAPE
  • Managing DirectorSHASHANK PURUSHOTTAM PARANJAPE
  • Other registrations28 more →
  • Completed15 of 29
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects17 →

Key dates

10 months past promisethis monthRegisteredOct 2019PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Oct 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Current status

93%242 of 260 units booked

Figures as on 8 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H3NA15151300130
H4NA15151300130

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

H349%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H477%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 8 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed260

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots260
Closed/Covered260
BuildingClosed/CoveredTotal
H3130130
H4130130

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,230 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority
Permissible FSI14617.01
Proposed, not sanctioned14,617 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaukik Apartments Ground Floor Plot No 3 CTS No 870 Bhandarkar Road , Pune, 411004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAniruddha Vaidya And Associates
EngineerChnadrashekhar
Chartered AccountantKapure and Kapure Chartered Accoutant
Chartered AccountantM S K A & Associates
PartnerRole in project
PARANJAPE SCHEMES (CONSTRUCTION) LTD-

Litigation declared3

CaseCourtStatus
1480/2011/2011Civil Judge Senior Division PuneMatter is kept for examination in chief
593/2018/2018Civil Judge Senior Division PuneApplicant has taken steps for issue of summons
186/2018/2018Civil Judge Senior Division PuneMatter is kept for hearing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 Everglades_ H3,H4.pdf8 Nov 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Everglades H3 H4-Mar'25-uploaded.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Everglades H3 H4-Mar'24-uploaded.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-FT Everglades -Sept'24-uploaded.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Everglades H3H4-Dec'24-uploaded.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Everglads H3 H4 - June 24-ompressed.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 DEC 24 of Everglades H3 H4 bldg-uploaded.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - FT H3 H4-Jan '24-compressed-uploaded.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Everglades H3 H4-Sept'24-uploaded.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Everglades H3H4-Sept'24-uploaded.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-Everglades-FY 23-24-uploaded.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure-Sold-Unsold-Everglades H3 H4-June'24-uploaded.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 22 FOM 2-Everglades H3 H4-June'24-uploaded.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Everglades H3 H4-FORM 1-June'24-uploaded.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 FT H3 H4 Everglades-FORM 2A-June'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Report-Everglades H3 H4-Mar'24-uploaded.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-FT h3 H4-Mar'24-uploaded.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-FT EVERGLADES H3H4-Mar'24-uploaded.pdf4 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-H3 H4 Everglades-Mar'24-uploaded.pdf1 Apr 2024
Disclosure of sold/ booked inventoryFile: 7 FT Everglades H3 H4-disclosure-Dec'23-uploaded.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-FT Everglades H3- H4-Dec'23-uploaded.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Everglades H3 H4-Dec'23-uploaded.pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A DEC 2023 H3H4 EVERGLADES-uploaded.pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-FT Everglades H3 H4-FY 22-23.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Forest Trails Everglades H3-H4-Sept'23-uploaded.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory data-Forest trails Everglades H3H4-Sept'23-uploaded.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Everglades H3 H4-Sept'23.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2 A SEPT 23 EVERGLADES-uploaded.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Everglades H3 H4-June'23.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A EVERGLADES June 23.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Everglades H3 H4-June 23.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 17 FORM 2-Forest Trails Everglades H3 H4-Mar 23.pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 FTH3 H4-RERA Form-1-Mar 2023-uploaded.pdf8 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FT_Everglade_H3 H4.pdf20 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Everglades-Rera Form 1 Dec 19.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2021-04-29-Everglades H3 H4-RERA Form1.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT EVERGLADES H3 H4-RERA Form-1-June 2021.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FT-H3 H4-RERA Form-1-Sept 2022.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 FT H3 H4 -FORM 2-Sept 19 to Mar 20-merged -compressed-.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FT H3 H4 -FORM 2-June 20 to Mar 21 -merged- compressed.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FT H3 H4-FORM 2-June 21 to Dec 21 merged -compressed.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FT -Everglades H3 H4-FORM 2-Mar 22.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5-FTEverglades H3 H4-FORM 2-June 22.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 FT-Everglades H3 H4-ORM 2-Sep 22.pdf7 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 FTEverglades H3 H4-FORM 2-Dec 22.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 H3 H4 Dec -2022-uploded.pdf1 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Everglades 2022 2023.pdf26 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Everglades 2019- 2020.pdf22 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Everglades 2020 2021 Part 1.pdf22 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Everglades 2020 2021 Part 2.pdf22 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Everglades 2021-2022 Part 1.pdf22 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Everglades 2021-2022 Part 2.pdf22 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Everglades 2022 2023.pdf22 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FT Everglades-min_compressed.pdf25 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Everglades H3H4.pdf30 Sep 2019
Copy of the legal title reportFile: Title Certificate_Everglades_03-09-2019.pdf27 Sep 2019
Declaration in FORM BFile: Form B_Everglades_19-09-2019.pdf27 Sep 2019
Proforma of Allotment letterFile: Everglades H3 and H4 Proforma Allotment Ltr and Agrt for Sale.pdf19 Sep 2019
Details of encumbrancesFile: FT Everglades Encumbrance Certificate.pdf10 Sep 2019
Layout approvalFile: FOREST TRAILS Everglades H3 and H4 Layout Plan_.pdf30 Aug 2019
Building plan approvalFile: FOREST TRAILS Everglades H3 and H4 Layout Plan_.pdf30 Aug 2019
Copy of Layout Approval (in case of layout)File: FOREST TRAILS Everglades H3 and H4 Layout Plan_.pdf30 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: FOREST TRAILS Everglades H3 and H4 Layout Plan_.pdf30 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: FOREST TRAILS EVERGLADES H3 and H4 COMMENCEMENT CERTIFICATE.pdf30 Aug 2019

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
127 UPPER EASTP51800000454Andheri, Mumbai Suburban-Jul 2017CompletedJun 2024Registered original: Dec 2019Jan 1970
PRATHAM RESIDENTIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103035-CompletedApr 2016Mar 2016
THE BUSINESS HUBSURVEY NO25 HISSA NO 29 HISSA NO 1 KOTHRUD PUNE 41102986-CompletedJan 2016Nov 2015
MADHUKOSH - IIISNo4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune258-CompletedAug 2015Aug 2015
PRATHAM COMMERCIAL727 SADASHIV PETH KUMTHEKAR ROAD PUNE 41103032-CompletedJun 2015Apr 2015
PUNARVASUPRABHAT ROAD ERANDWANE PUNE 41100410-CompletedDec 2014Late, Jun 2015
MADHUKOSH - IISNo4 HISSA NO 2 SNO 16 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune150-CompletedDec 2013Oct 2013
MADHUKOSH - ISNo 4 HISSA NO 2 SNO 16 AND 17 part Wadgaon khurd Tal Haveli Sinhgad road Pune289-CompletedMar 2012Feb 2012

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Forest Trails Everglades H3 and H4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

Builder: PARANJAPE SCHEMES (CONSTRUCTION) LTD

PARANJAPE SCHEMES (CONSTRUCTION) LTD has 29 registrations on MahaRERA, including SWAPNASAMRAT and Blue Ridge Project C Land T18 and T19. Its filings disclose 17 earlier MahaRERA projects: declares 9 of 17 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Forest Trails Everglades H3 and H4 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Forest Trails Everglades H3 and H4 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Forest Trails Everglades H3 and H4?

The registered promoter entity is PARANJAPE SCHEMES (CONSTRUCTION) LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Forest Trails Everglades H3 and H4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Forest Trails Everglades H3 and H4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Forest Trails Everglades H3 and H4?

The professionals named in the filing: Architect: Aniruddha Vaidya And Associates; Engineer: Chnadrashekhar; Chartered Accountant: Kapure and Kapure Chartered Accoutant; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Forest Trails Everglades H3 and H4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Forest Trails Everglades H3 and H4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Forest Trails Everglades H3 and H4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.