Home / Browse projects / Thane, Maharashtra / Flamingo

Completed No litigation declared Residential / Group Housing project

Flamingo

By ROMA BUILDERS PRIVATE LIMITED

RG-MH-12069 · RERA P51700001611 · Last updated on MahaRERA portal: 15 May 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 28 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

Flamingo is a Residential / Group Housing project by ROMA BUILDERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700001611 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameFlamingo
  • TypeResidential / Group Housing
  • Location
    • Off Ghodbunder Road
    • Hiranandani Estate
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001611
  • ReraGenie IDRG-MH-12069

Builder

  • NameROMA BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorNiranjan L Hiranandani
  • Other registrations28 more →
  • Completed28 of 29
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FlamingoNA320000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Flamingo: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed186

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots186
Closed/Covered186

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area562 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9502.7
Proposed, not sanctioned9,165 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGalleria Hiranandani Gardens Powai Mumbai 400076

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSharmishtha Mukerjee Shinde
EngineerEr. Cyrus Pithawalla
EngineerEr. Prahsant A. Tarmale
Chartered AccountantS H PATRAWALA & CO
Chartered AccountantP B DESAI & CO
PartnerRole in project
ROMA BUILDERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Nov 2019

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: RBPL Flamingo Inventory Update 31032023cc.pdf15 May 2023
Disclosure of sold/ booked inventoryFile: Roma RERA upload - Flamingo- signed.pdf12 Jan 2023
Disclosure of sold/ booked inventoryFile: Roma RERA upload Flamingo.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Roma RERA upload - Flamingo.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: Roma RERA upload - Flamingo.pdf21 Apr 2022
Disclosure of sold/ booked inventoryFile: Roma RERA upload - Flamingo.pdf11 Jan 2022
CERSAI detailsFile: CERSAI REPORT FLAMINGO.pdf6 Jan 2022
Details of encumbrancesFile: Encumbrance Certificate FLAMINGO.pdf18 Nov 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Flamingo Society.pdf21 Oct 2021
Status of ConveyanceFile: Flamingo RERA Conveyance letter.pdf16 Sep 2021
Disclosure of sold/ booked inventoryFile: MAHA RERA FLAMINGO.pdf31 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: FLAMINGO.pdf16 Jul 2021
Disclosure of sold/ booked inventoryFile: Flamingo RERA Update.pdf18 Jun 2021
Certificates of CA (Form 5)File: FLAMINGO Form V.pdf28 Sep 2020
OtherFile: Closure Statement _ RERA AC Pelican and Flamingo.pdf4 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo Arch for OC.pdf1 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Flamingo Engr for OC.pdf1 Dec 2019
Certificates of CA (Form 3)File: Flamingo CA for OC.pdf1 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: Done Bldg No 59 Flamingo Form 4.pdf30 Nov 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg No 59 and 60 OC.pdf19 Nov 2019
OtherFile: Bldg No 59 and 60 OC.pdf19 Nov 2019
Certificates of CA (Form 5)File: Form V Flamingo.pdf19 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO.pdf15 Sep 2019
Certificates of CA (Form 3)File: Flamingo.pdf15 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo .pdf8 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo .pdf20 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO.pdf20 Jun 2019
Certificates of CA (Form 3)File: Flamingo 3 CA certificate.pdf20 Jun 2019
Form 2AFile: Flamingo .pdf6 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo.pdf28 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO BLDG.pdf28 Mar 2019
Certificates of CA (Form 3)File: Flamingo 3 CA certificate.pdf28 Mar 2019
Form 2AFile: Flamingo QA.pdf5 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo.pdf21 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO BLDG.pdf21 Dec 2018
Certificates of CA (Form 3)File: Flamingo CA certificate.pdf21 Dec 2018
OtherFile: FLAMINGO CERTIFICATE.pdf21 Dec 2018
Building plan approvalFile: Flemingo Groung and first Floor Plan.pdf11 Dec 2018
Building plan approvalFile: Flemingo Typical and refuge Floor Plan.pdf11 Dec 2018
Layout approvalFile: Skylark Layout.pdf11 Dec 2018
Layout approvalFile: Ground and Stilt Floor.pdf11 Dec 2018
Layout approvalFile: Basement Floor.pdf11 Dec 2018
Layout approvalFile: Club House.pdf11 Dec 2018
Copy of Layout Approval (in case of layout)File: Skylark Layout.pdf11 Dec 2018
Copy of Layout Approval (in case of layout)File: Ground and Stilt Floor.pdf11 Dec 2018
Copy of Layout Approval (in case of layout)File: Basement Floor.pdf11 Dec 2018
Copy of Layout Approval (in case of layout)File: Club House.pdf11 Dec 2018
Building Plan Approval (IOD)File: Flemingo Groung and first Floor Plan.pdf11 Dec 2018
Building Plan Approval (IOD)File: Flemingo Typical and refuge Floor Plan.pdf11 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Skylark CC .pdf11 Dec 2018
Certificates of CA (Form 5)File: Form 5 Flamingo.pdf27 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo arch 1sep.pdf21 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Flamingo engr 1sep.pdf21 Sep 2018
Certificates of CA (Form 3)File: CA Flamingo.pdf21 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO BLDG.pdf17 Jun 2018
Certificates of CA (Form 3)File: Flamingo CA.pdf17 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo.pdf10 Jun 2018
OtherFile: Pelican and Flamingo plinth.pdf22 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo Arch.pdf23 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO Engg.pdf23 Mar 2018
Certificates of CA (Form 3)File: Flamingo CA.pdf23 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO R Engr certificate.pdf18 Jan 2018
Certificates of CA (Form 3)File: Flamingo Form 3.pdf21 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO.pdf18 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo.pdf15 Dec 2017
Certificates of CA (Form 3)File: Flamingo_Form 3.pdf28 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FLAMINGO Bldg.pdf26 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Flamingo_Form 1_31082017.pdf22 Sep 2017
Certificates of CA (Form 3)File: Form 3 Flamingo.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Flamingo Bldg.pdf24 Jul 2017
Proforma of Allotment letterFile: RERA AFS ( Flamingo) 24072017 (Final).pdf24 Jul 2017
Copy of the legal title reportFile: TC RERA Flamingo.pdf21 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate FLAMINGO (1).pdf21 Jul 2017
Declaration in FORM BFile: Form B FLAMINGO.pdf21 Jul 2017
Layout approvalFile: Layout plan.pdf20 Jul 2017
Layout approvalFile: lower basement.pdf20 Jul 2017
Layout approvalFile: Upper basement plan.pdf20 Jul 2017
Layout approvalFile: clubhouse.pdf20 Jul 2017
Layout approvalFile: SKYLARK- LAYOUT.pdf20 Jul 2017
Layout approvalFile: STILTGROUND FLOOR.pdf20 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Hiranandani EstateOff Ghodbunder Road Thane W - 4006073,174CompletedDec 2018May 2017
Hiranandani EstateOff Ghodbunder Road Thane W - 4006073,174CompletedDec 2018May 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Flamingo on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hiranandani Estate7,600+ in Thane

2 kmFlamingoCompleted 61Lapsed / revoked 12Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: ROMA BUILDERS PRIVATE LIMITED

ROMA BUILDERS PRIVATE LIMITED has 29 registrations on MahaRERA, including FORTUNA B and Eagleton. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Flamingo is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Flamingo?

The registered promoter entity is ROMA BUILDERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Flamingo?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Flamingo?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Flamingo?

The professionals named in the filing: Architect: Sharmishtha Mukerjee Shinde; Engineer: Er. Cyrus Pithawalla; Engineer: Er. Prahsant A. Tarmale; Chartered Accountant: S H PATRAWALA & CO; Chartered Accountant: P B DESAI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Flamingo?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Flamingo. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Flamingo to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.