FIRST ELEGANCE
By GURUPREET SINGH BALDEV SINGH SANDHU
RG-MH-05399 · RERA P51700051016 · Last updated on MahaRERA portal: 14 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
FIRST ELEGANCE is a Residential / Group Housing project by GURUPREET SINGH BALDEV SINGH SANDHU in Thane, Maharashtra, registered with MahaRERA as P51700051016 on 22 May 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 8 of the 24 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameFIRST ELEGANCE
- TypeResidential / Group Housing
- Location
- SURVEY NO 26
- HISSA 2/A/23
- PLOT NO 20
- VILLAGE SHIRAGAON
- TALUKA AMBERNATH
- DIST THANE
- BADLAPUR EAST KATRAP
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700051016
- ReraGenie IDRG-MH-05399
Builder
- NameGURUPREET SINGH BALDEV SINGH SANDHU
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 May 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed74 files
Current status
Figures as on 14 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| FIRST ELEGANCE | NA | 5 | 5 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
FIRST ELEGANCE: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NEW JAI GANESH DARSHAN CO OP HSG SOCIETY LTD | Badlapur (M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THORAT MATHEW AND ASSOCIATES |
| Engineer | M NANDWANI STRUCTURAL CONSULTANTS |
| Chartered Accountant | VIKAS KAMRA & CO CHARTERED ACCOUNTANTS kamra |
| Partner | Role in project |
|---|---|
| GURUPREET SINGH BALDEV SINGH SANDHU | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delay in revision of sanction plan and cc and
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: 2 Form 2A FY 23-24.pdf | 14 Mar 2026 |
| Form 2A (FY 2024-2025)File: 3 From 2A FY 24-25.pdf | 14 Mar 2026 |
| Form 5 (FY 2023-2024)File: 1 Form 5 First Homes 31032024.pdf | 4 Mar 2026 |
| Form 5 (FY 2024-2025)File: 2 Form 5 First Homes 31032025.pdf | 4 Mar 2026 |
| Form 1File: 1 Form 1 first elegance 30062023.pdf | 16 Jan 2026 |
| Form 2File: 1 Form 2 First Elegance 30062023.pdf | 16 Jan 2026 |
| Form 3File: 1 Form 3 First Homes 30062023 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 1 Disclosure Sold unsold 30062023 final.pdf | 16 Jan 2026 |
| Form 1File: 2 Form 1 first elegance 30092023.pdf | 16 Jan 2026 |
| Form 2File: 2 Form 2 First Elegance 30092023.pdf | 16 Jan 2026 |
| Form 3File: 2 Form 3 First Homes 30092023 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure Sold unsold 30092023 final.pdf | 16 Jan 2026 |
| Form 1File: 3 Form 1 first elegance 31122023.pdf | 16 Jan 2026 |
| Form 2File: 3 Form 2 First Elegance 31122023.pdf | 16 Jan 2026 |
| Form 3File: 3 Form 3 First Homes 31122023 FINAL.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure Sold unsold 31122023 final.pdf | 16 Jan 2026 |
| Form 2File: 4 Form 2 First Elegance 31032024.pdf | 16 Jan 2026 |
| Form 3File: 4 Form 3 First Homes 31032024 FINAL.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 4 Disclosure Sold unsold 31032024 final.pdf | 16 Jan 2026 |
| Form 1File: 4 Form 1 first elegance 31032024.pdf | 16 Jan 2026 |
| Form 1File: 5 Form 1 first elegance 30062024.pdf | 16 Jan 2026 |
| Form 2File: 5 Form 2 First Elegance 30062024.pdf | 16 Jan 2026 |
| Form 3File: 5 Form 3 First Homes 30062024 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure Sold unsold 30062024 final.pdf | 16 Jan 2026 |
| Form 1File: 6 Form 1 first elegance 30092024.pdf | 16 Jan 2026 |
| Form 2File: 6 Form 2 First Elegance 30092024.pdf | 16 Jan 2026 |
| Form 3File: 6 Form 3 First Homes 30092024 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 6 Disclosure Sold unsold 30092024 final.pdf | 16 Jan 2026 |
| Form 1File: 7 Form 1 first elegance 31122024.pdf | 16 Jan 2026 |
| Form 2File: 7 Form 2 First Elegance 31122024.pdf | 16 Jan 2026 |
| Form 3File: 7 Form 3 First Homes 31122024 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 7 Disclosure Sold unsold 31122024 final.pdf | 16 Jan 2026 |
| Form 1File: 8 Form 1 first elegance 31032025.pdf | 16 Jan 2026 |
| Form 2File: 8 Form 2 First Elegance 31032025.pdf | 16 Jan 2026 |
| Form 3File: 8 Form 3 First Homes 31032025 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 8 Disclosure Sold unsold 31032025 final.pdf | 16 Jan 2026 |
| Form 1File: 9 Form 1 first elegance 30062025.pdf | 16 Jan 2026 |
| Form 2File: 9 Form 2 First Elegance 30062025.pdf | 16 Jan 2026 |
| Form 3File: 9 Form 3 First Homes 30062025 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 9 Disclosure Sold unsold 30062025 final.pdf | 16 Jan 2026 |
| Form 1File: 10 Form 1 first elegance 30092025.pdf | 16 Jan 2026 |
| Form 2File: 10 Form 2 First Elegance 30092025.pdf | 16 Jan 2026 |
| Form 3File: 10 Form 3 First Homes 30092025 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 10 Disclosure Sold unsold 30092025 final.pdf | 16 Jan 2026 |
| Form 1File: 11 Form 1 first elegance 31122025.pdf | 16 Jan 2026 |
| Form 2File: 11 Form 2 First Elegance 31122025.pdf | 16 Jan 2026 |
| Form 3File: 11 Form 3 First Homes 31122025 final.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: 11 Disclosure Sold unsold 31122025 final.pdf | 16 Jan 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 First Homes 31032023 final.pdf | 13 May 2023 |
| Details of encumbrances concerned to FinanceFile: no encumberances finance.pdf | 24 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: no encumberances legal.pdf | 24 Apr 2023 |
| Details of encumbrances concerned to LegalFile: no encumberances finance.pdf | 24 Apr 2023 |
| Details of encumbrances concerned to LegalFile: no encumberances legal.pdf | 24 Apr 2023 |
| CERSAI detailsFile: cersai undertaking.pdf | 24 Apr 2023 |
| Proforma of Agreement for saleFile: 2 AFS FIRST HOMES FINAL.pdf | 24 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration of seperate bank account.pdf | 24 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation report afs.pdf | 24 Apr 2023 |
| Layout approvalFile: 10 first homes sanction plan_11zon.pdf | 8 Apr 2023 |
| Building plan approvalFile: 10 first homes sanction plan_11zon.pdf | 8 Apr 2023 |
| PAN CardFile: 7 pan card.pdf | 8 Apr 2023 |
| Copy of the legal title reportFile: 4 legal titile 1 (2 files merged)_11zon.pdf | 8 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: 13 no encumbrences legal.pdf | 8 Apr 2023 |
| Details of encumbrances concerned to LegalFile: 13 no encumbrences legal.pdf | 8 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 10 first homes sanction plan_11zon.pdf | 8 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 first homes sanction plan_11zon.pdf | 8 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2 CC Copy.pdf | 8 Apr 2023 |
| Declaration about Commencement CertificateFile: 8 declaration of commencement cert.pdf | 8 Apr 2023 |
| Declaration in FORM BFile: 6 form B promotor_11zon (1).pdf | 8 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 architect certificate.pdf | 8 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 form 2 Engineer certificate_11zon (1).pdf | 8 Apr 2023 |
| CERSAI detailsFile: 20 CERSAI_Search_Report.pdf | 8 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 10 disclosure of interest in other real estate firm.pdf | 8 Apr 2023 |
| Proforma of Allotment letterFile: 11 model allotment letter_11zon.pdf | 8 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: 9 deviation report allotment letter.pdf | 8 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep FIRST ELEGANCE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BADLAPUR EAST KATRAP7,600+ in Thane
Filed coordinates, straight-line distance. 426 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: GURUPREET SINGH BALDEV SINGH SANDHU
GURUPREET SINGH BALDEV SINGH SANDHU has 1 registration on MahaRERA, including FIRST ELEGANCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that FIRST ELEGANCE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if FIRST ELEGANCE is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of FIRST ELEGANCE?
The registered promoter entity is GURUPREET SINGH BALDEV SINGH SANDHU, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in FIRST ELEGANCE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for FIRST ELEGANCE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at FIRST ELEGANCE?
The professionals named in the filing: Architect: THORAT MATHEW AND ASSOCIATES; Engineer: M NANDWANI STRUCTURAL CONSULTANTS; Chartered Accountant: VIKAS KAMRA & CO CHARTERED ACCOUNTANTS kamra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FIRST ELEGANCE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback