Home / Browse projects / Mumbai Suburban, Maharashtra / FINE HEIGHTS

Registration lapsed No litigation declared Residential / Group Housing project

FINE HEIGHTS

By FINE DEVELOPMENTS

RG-MH-07238 · RERA P51800055299 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
3 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

FINE HEIGHTS is a Residential / Group Housing project by FINE DEVELOPMENTS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055299 on 14 Mar 2024. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 13 of the 16 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameFINE HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • Liberty Garden Cross Road No.3
    • Malad West Mumbai
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800055299
  • ReraGenie IDRG-MH-07238

Builder

  • NameFINE DEVELOPMENTS
  • Entity typePartnership
  • PartnerPANKAJ RAMNARAYAN SHUKLA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredMar 2024First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Mar 2024
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed74 files

Current status

81%13 of 16 units booked
100.0%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FINE HEIGHTSNA10816016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

FINE HEIGHTS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered13
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area314 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1050.0
Proposed, not sanctioned353 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThe Amaltas CHS Ltd, Juhu Versova Link Road, Andheri West, Mumbai-400 053
Estimated costRs 6.00 cr
Cost incurredRs 6.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
FINE HEIGHTSNARs 4.50 crRs 4.50 cr
-NARs 1.50 crRs 1.50 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRIKANT VICHARE & ASSOCIATES
EngineerFAKHRI A HASAMWALA & ASSOCIATES
Chartered AccountantSANDEEP MISTRY
Chartered AccountantD. T. Samani & Co.
PartnerRole in project
FINE DEVELOPMENTS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03122518508Dec 2025 → Jun 2026

Reason as filed by the promoterThe project work was delayed due to prolonged monsoon, labour shortage. Continuous heavy rainfall during the May and October and part november period disrupted waterproofing and movement of construction materials. These circumstances resulted in delays beyond our control. We therefore request approval for extension of the project timeline.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE - 07-04-26.pdf20 May 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE - 07-04-26.pdf20 May 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFCATE - 07-04-26.pdf20 May 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFCATE - 07-04-26.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 - Kandivali July to Sept 25 (1) (1).pdf20 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf20 May 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate MahaRERA.pdf3 Apr 2026
Withdrawal Update Form 2File: 2- FORM 2 ENGINEER CERTIFCATE - 05-01-26.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf3 Apr 2026
Form 1File: Form 1_Architect Certificate_Dt 08-07-2024.pdf26 Nov 2025
Form 2File: Form 2_Engineer Certificate_Dt 08-07-2024.pdf26 Nov 2025
Form 3File: Form 3_CA Certificate_Dt 08-07-2024.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold of inventory.pdf26 Nov 2025
Form 1File: Form 1_Architect Certificate_Dt 16-10-2024.pdf26 Nov 2025
Form 2File: Form 2_Engineer Certificate_Dt 16-10-2024.pdf26 Nov 2025
Form 3File: Form 3_CA Certificate_Dt 16-10-2024.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold of inventory.pdf26 Nov 2025
Form 1File: Form 1_Architect Certificate_Dt 08-07-2024.pdf26 Nov 2025
Form 2File: Form 2_Engineer Certificate_Dt 08-07-2024.pdf26 Nov 2025
Form 3File: Form 3_CA Certificate_Dt 08-07-2024.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold of inventory.pdf26 Nov 2025
Form 1File: Form 1 Achitect Certificate 15.10.2025..pdf20 Oct 2025
Form 2File: Form 2 Engineer Certificete Dt. 15.10.2025..pdf20 Oct 2025
Form 3File: Form 3A Dt. CA Certificate 05.10.2025..pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold of inventory.pdf20 Oct 2025
Form 1File: Form 1 - Architect Certificate - 14-07-25.pdf18 Jul 2025
Form 2File: Form 2 - Engineer Certificate 14-07-2025.pdf18 Jul 2025
Form 3File: Form 3 - CA Certificates- 14-07-2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold of inventory - 14-07-25.pdf18 Jul 2025
Form 1File: Form 1 Architect Certificate 15-04-2025.pdf18 Jul 2025
Form 2File: Form 2 Engineer Certificates 15-04-2025.pdf18 Jul 2025
Form 3File: Form 3 CA Certificate 15-04-2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold of inventory.pdf18 Jul 2025
Form 1File: Form 1- Architect Certificate.pdf18 Jul 2025
Form 2File: Form 2- Engineers Certificate.pdf18 Jul 2025
Form 3File: Form 3 - CA Certificate.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discloser of sold of inventory.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 15-04-2025.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 15-04-2025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificates 15-04-2025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineers Certificate.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineers Certificate.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 A - 27-01-25.pdf3 Feb 2025
Layout approvalFile: IOD Plan - 25-06-24.pdf9 Dec 2024
Building plan approvalFile: Approved IOD-25-06-24.pdf9 Dec 2024
Copy of Layout Approval (in case of layout)File: IOD Plan - 25-06-24.pdf9 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Third CC - 22-07-24.pdf9 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved IOD-25-06-24.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate- 26-02-24.pdf27 Feb 2024
Proforma of Agreement for saleFile: AFS - 27-02-24.pdf27 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Devi-AFS - 27-02-24.pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate.pdf16 Jan 2024
Details of encumbrances concerned to LegalFile: No Encumbrances Certificate.pdf16 Jan 2024
CERSAI detailsFile: CERSAI Undertaking.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf26 Dec 2023
Proforma of Allotment letterFile: Allotment Letter.pdf26 Dec 2023
Deviation Report with respect to Allotment letterFile: Devi-Allotment Letter.pdf26 Dec 2023
Layout approvalFile: Approved Plans.pdf6 Dec 2023
Building plan approvalFile: Approved IOD.pdf6 Dec 2023
PAN CardFile: 1 Pan Card Fine Developments.pdf6 Dec 2023
Copy of the legal title reportFile: Title Report - 26-12-23.pdf6 Dec 2023
Details of encumbrances concerned to FinanceFile: Certificate of No encumberance of Property.pdf6 Dec 2023
Details of encumbrances concerned to LegalFile: Certificate of No encumberance of Property.pdf6 Dec 2023
Copy of Layout Approval (in case of layout)File: Approved Plans.pdf6 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved IOD.pdf6 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Dec 2023
Declaration about Commencement CertificateFile: Format D-Declaration about CC.pdf6 Dec 2023
Declaration in FORM BFile: Form B.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate.pdf6 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf6 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Declaration about Seperate bank account.pdf6 Dec 2023

How this compares with Mumbai Suburban

81%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FINE HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad West Mumbai6,700+ in Mumbai Suburban

2 kmFINE HEIGHTSCompleted 135Lapsed / revoked 83Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 367 registered projects within 2 km.

Builder: FINE DEVELOPMENTS

FINE DEVELOPMENTS has 2 registrations on MahaRERA, including FINE RESIDENCY and FINE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that FINE HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if FINE HEIGHTS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FINE HEIGHTS?

The registered promoter entity is FINE DEVELOPMENTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FINE HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for FINE HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FINE HEIGHTS?

The professionals named in the filing: Architect: SHRIKANT VICHARE & ASSOCIATES; Engineer: FAKHRI A HASAMWALA & ASSOCIATES; Chartered Accountant: SANDEEP MISTRY; Chartered Accountant: D. T. Samani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FINE HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FINE HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FINE HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.