Home / Browse projects / Pune, Maharashtra / FESTIVE RESIDENCY

Registered No litigation declared Residential / Group Housing project

FESTIVE RESIDENCY

By SAMRUDDHI DEVELOPERS

RG-MH-37061 · RERA P52100016432 · Last updated on MahaRERA portal: 21 Aug 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 57 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 57 months from the original
32 of 55Construction stages doneacross 5 buildings; furthest along: Staircases, 95%
45 of 76Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

FESTIVE RESIDENCY is a Residential / Group Housing project by SAMRUDDHI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100016432 on 10 May 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 57 months from the original filing. 31 of the 76 units on this registration are recorded sold or booked, and 32 of 55 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameFESTIVE RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • VILLAGE WAKAD
    • TALUKA MULASHI
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016432
  • ReraGenie IDRG-MH-37061

Builder

  • NameSAMRUDDHI DEVELOPERS
  • Entity typePartnership
  • PartnersGOVIND GANGA VAVIYA, NAVIN HARJI PATEL
  • Other registrations20 more →
  • Completed10 of 21
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2018First promiseMar 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Mar 2023)
  • Buildings5 building records
  • Documents filed91 files

Current status

41%31 of 76 units booked
75.0%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA5416016
B WINGNA5414014
C WINGNA5416016
D WINGNA5414014
E WINGNA5416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 95%.

A WING51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
E WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered52
Open Space24
BuildingClosed/CoveredOpen SpaceTotal
A WING10515
B WING10515
C WING10515
D WING11516
E WING11415

Land and ownership12

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
LandownerVillageDistrict
SHANTARAM KALATEPune (M Corp.)Pune
KISAN KALATEPune (M Corp.)Pune
SHALAN KALATEPune (M Corp.)Pune
AVINASH KALATEPune (M Corp.)Pune
POOJA KALATEPune (M Corp.)Pune
APURVA KALATEPune (M Corp.)Pune
AMOL KALATEPune (M Corp.)Pune
ANITA SHINDEPune (M Corp.)Pune
VITTHAL KALATEPune (M Corp.)Pune
SANGITA KALATEPune (M Corp.)Pune
NIKHIL KALATEPune (M Corp.)Pune
RUSHIKESH KALATEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad mahanagar palika
Permissible FSI2999.7
Proposed, not sanctioned3,000 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE NILKH PUNE
Estimated costRs 12.29 cr
Cost incurredRs 9.21 cr
Work done75.0%
BuildingWingEstimatedIncurred
A WINGNARs 2.46 crRs 1.84 cr
B WINGNARs 2.46 crRs 1.84 cr
C WINGNARs 2.46 crRs 1.84 cr
D WINGNARs 2.46 crRs 1.84 cr
E WINGNARs 2.46 crRs 1.84 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHITESH AGRAWAL
EngineerKomal Mahindra Pawar
EngineerAnand Tonaye
Chartered AccountantManish K ramawati And Company
Chartered AccountantMs S A A N & CO
Chartered AccountantM s K HEMANT & CO
PartnerRole in project
SAMRUDDHI DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019477Mar 2023 → Dec 2025

Reason as filed by the promoterWe are under process of completion of projects we need extension till 31st dec 2025

EXT52100014015Mar 2023 → Mar 2024

Reason as filed by the promoterWE ARE UNDER PROCESS OF GETTING OCCUPANCY CERTIFICATE. WE HAVE ALMOST COMPLETED OUR PROJECT. WE JUST NEED ONE YEAR EXTENSION .

EA21082622312Mar 2023 → Dec 2027

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12400795Sohel Gulanam PatelSAMRUDDHI DEVELOPERS16/11/2024
CC12400827Sagar prakashrao UmapSAMRUDDHI DEVELOPERS20/11/2024
CC12504716Vijay Rajabhau KharatSAMRUDDHI DEVELOPERS31/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 30-06-2025.pdf21 Aug 2026
Withdrawal Update Form 1File: Form 1 30-09-2025.pdf21 Aug 2026
Withdrawal Update Form 1File: Form 1 31-12-2025.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2 30-06-2025.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2 30-09-2025.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2 31-12-2025.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf21 Aug 2026
Form 5 (FY 2023-2024)File: FORM 5 2023-24 Samruddhi Developers New.pdf21 Aug 2026
Form 5 (FY 2023-2024)File: FORM 5 2023-24 Samruddhi Developers New.pdf21 Aug 2026
Form 5 (FY 2024-2025)File: FORM 5 2023-24 Samruddhi Developers New.pdf21 Aug 2026
Form 5 (FY 2024-2025)File: FORM 5 2024-25 Samruddhi Developers New.pdf21 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf20 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf20 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf20 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf20 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf20 Aug 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Feb 2025
Certificates of CA (Form 3)File: FORM 3 - converted.pdf23 Feb 2025
Certificates of CA (Form 3)File: FORM 3 SIGNED - converted.pdf23 Feb 2025
Certificates of CA (Form 3)File: FORM 3 SIGNED - converted.pdf23 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Feb 2025
Declaration in FORM BFile: FORM B.pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIGN.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf30 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf30 Mar 2024
Disclosure of sold/ booked inventoryFile: SOLD INV_1 (2 files merged).pdf30 Mar 2024
Certificates of CA (Form 3)File: Form - 3 - converted (1).pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 25-08-2023.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM - 5 _1 (2 files merged).pdf11 Mar 2024
Declaration in FORM BFile: Form b_1 (2 files merged).pdf16 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD INV.pdf16 Mar 2023
CERSAI detailsFile: CERSAI Search Report.pdf8 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in other real estate organization.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf8 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf8 Mar 2023
Proforma of Agreement for saleFile: AFS.pdf8 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT DRAFT NEW.pdf8 Mar 2023
Details of encumbrances concerned to FinanceFile: No encumbrances Certificate LEGAL.pdf6 Mar 2023
Details of encumbrances concerned to LegalFile: No encumbrances Certificate LEGAL.pdf6 Mar 2023
Declaration about Commencement CertificateFile: declaration about comm cert.pdf6 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf6 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf6 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf6 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account decla.pdf6 Mar 2023
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf6 Mar 2023
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf6 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf3 Jan 2022
Certificates of CA (Form 3)File: CA CERT.pdf30 Apr 2018
Building plan approvalFile: Blue Print 01.PDF26 Apr 2018
Building plan approvalFile: Blue Print 02.PDF26 Apr 2018
Building plan approvalFile: Blue Print 03.PDF26 Apr 2018
Building plan approvalFile: Blue Print 04.PDF26 Apr 2018
Building plan approvalFile: Blue Print 05.PDF26 Apr 2018
Building plan approvalFile: Blue Print 06 (1).PDF26 Apr 2018
Building plan approvalFile: Blue Print 07.PDF26 Apr 2018
Layout approvalFile: Blue Print 01.PDF26 Apr 2018
Layout approvalFile: Blue Print 02.PDF26 Apr 2018
Layout approvalFile: Blue Print 03.PDF26 Apr 2018
Layout approvalFile: Blue Print 04.PDF26 Apr 2018
Layout approvalFile: Blue Print 05.PDF26 Apr 2018
Layout approvalFile: Blue Print 06 (1).PDF26 Apr 2018
Layout approvalFile: Blue Print 07.PDF26 Apr 2018
PAN CardFile: PAN CARD.pdf26 Apr 2018
Copy of the legal title reportFile: SEARCH AND TITLE.pdf26 Apr 2018
Details of encumbrancesFile: NO INC CERT.pdf26 Apr 2018
Copy of Layout Approval (in case of layout)File: Blue Print 01.PDF26 Apr 2018
Copy of Layout Approval (in case of layout)File: Blue Print 02.PDF26 Apr 2018
Copy of Layout Approval (in case of layout)File: Blue Print 03.PDF26 Apr 2018
Copy of Layout Approval (in case of layout)File: Blue Print 04.PDF26 Apr 2018
Copy of Layout Approval (in case of layout)File: Blue Print 05.PDF26 Apr 2018
Copy of Layout Approval (in case of layout)File: Blue Print 06 (1).PDF26 Apr 2018

How this compares with Pune

41%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 57 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FESTIVE RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALUKA MULASHI13,700+ in Pune

2 kmFESTIVE RESIDENCYCompleted 49Lapsed / revoked 33Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: SAMRUDDHI DEVELOPERS

SAMRUDDHI DEVELOPERS has 21 registrations on MahaRERA, including SAI SAMRUDDHI RESIDENCY and RIDDHESH HEIGHTS. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if FESTIVE RESIDENCY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FESTIVE RESIDENCY?

The registered promoter entity is SAMRUDDHI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FESTIVE RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FESTIVE RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for FESTIVE RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FESTIVE RESIDENCY?

The professionals named in the filing: Architect: SHITESH AGRAWAL; Engineer: Komal Mahindra Pawar; Engineer: Anand Tonaye; Chartered Accountant: Manish K ramawati And Company; Chartered Accountant: Ms S A A N & CO; Chartered Accountant: M s K HEMANT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FESTIVE RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FESTIVE RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FESTIVE RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.