Home / Browse projects / Pune, Maharashtra / FELICIA WING A
FELICIA WING A
RG-MH-17140 · RERA P52100028478 · Last updated on MahaRERA portal: 30 Apr 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
FELICIA WING A is a Residential / Group Housing project by Anand Builders in Pune, Maharashtra, registered with MahaRERA as P52100028478 on 4 Mar 2021. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 18 months from the original filing. 86 of the 88 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameFELICIA WING A
- TypeResidential / Group Housing
- Location
- Hadapsar - Handewadi Road
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- RERA no.P52100028478
- ReraGenie IDRG-MH-17140
Builder
- NameAnand Builders
- Entity typeOthers
- GSTIN27AABAA9953G1ZL
- Named personsAnand Buildcon, Nalini Shankar Bankar, Ganesh Shankar Bankar, Girish Shankar Bankar, Vaishalee Shankar Bankar, Sujata Arun Bodke, Sharmila Rajendra Ambekar
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Mar 2021
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed128 files
Current status
Figures as on 30 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 12 | 11 | 88 | 0 | 88 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
Wing A: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | Yes | 0% |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Bankar,Bodke,Ambekar thru POA Anand Buildcon | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 15.80 cr | Rs 15.40 cr |
| - | NA | Rs 3.20 cr | Rs 3.20 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Parvez Maheboob Jamadar |
| Engineer | Nilesh Vijay Gund |
| Engineer | Swanpnil Raut |
| Chartered Accountant | Pushpak Badrinarayanji Mundada |
| Chartered Accountant | Sunil Shamrao Nimbalkar |
| Partner | Role in project |
|---|---|
| Anand Builders | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project progress was very slow in the initial period and has picked up now. And we have not sold any single unit of the project till date.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Mar 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed128
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Felicia_FY_2024-25.pdf | 30 Apr 2026 |
| Form 2A (FY 2025-2026)File: Felicia_FY_2025-26.pdf | 30 Apr 2026 |
| Occupational CertificateFile: FULL COMPLETION CERTIFICATE.pdf | 16 Mar 2026 |
| Occupational CertificateFile: Mail CC Verification screenshot.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: Architect Certificate Felicia Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Felicia Form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate Felicia Form3.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Felicia Audit Report 2024-25.pdf | 19 Nov 2025 |
| Withdrawal Update Form 1File: Arch Certificate.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: Engineering Certificate.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 6 Nov 2025 |
| Withdrawal Update Form 1File: Anand Builders Arch Certificate June 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 1File: Anand Builders Arch Certificate June 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: 883f92a6-df2a-43ae-9e65-cdf56596d63a.pdf | 1 Aug 2025 |
| Withdrawal Update Form 2File: Anand Builders Engg Certificate June 2025.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: CA certificate (Form 3)_FELICIA WING A_.pdf | 1 Aug 2025 |
| Withdrawal Update Form 3File: CA certificate (Form 3)_FELICIA WING A_.pdf | 1 Aug 2025 |
| Form 1File: Architect Certificate Anand Builders 31 march 2025.pdf | 27 May 2025 |
| Form 2File: Anand Builders Engg Certificate March 2025.pdf | 27 May 2025 |
| Form 3File: CA Certificate Anand Builders March 2025.pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventry Felicia March 2025.pdf | 27 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Anand Builders 31 march 2025.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Anand Builders March 2025.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand Builders Engg Certificate March 2025.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Felicia Sold Unsold Inventry Dec 2024.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventry Felicia March 2025.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anand Builders Arch Certificate 31 December 2024.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Felicia CA Certificate Dec 2024.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand Builders Engg Certificate Dec 2024.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Felicia Arch Certificate.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Anand Builders 30 September.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Felicia A Wing.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Felicia Wing A.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Felicia Engg Certificate.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Felicia September 30.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY Felicia A wing.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Inventry Felicia Wing A.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: A Builders Form 5 2023-24.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: A Builders Form 5 2023-24.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY_Felicia Wing A_ OK.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Felicia Wing A final.pdf | 18 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf | 18 Jun 2024 |
| Layout approvalFile: 1-10.pdf | 15 May 2024 |
| Copy of Layout Approval (in case of layout)File: 1-10.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anand Builder Arch Certificate.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand Builder Engg Certificate.pdf | 7 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Anand Builder Engg Certificate Form 2A.pdf | 7 May 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser Of Sold Inventry Anand Builders.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate ( Form 3 ) - Anand Builders.pdf | 7 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION OF SEPARATE BANK ACCOUNT-Felicia Wing A.pdf | 7 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DEVENDRA RATHI - DISCLOSURE.pdf | 2 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: KAMLESH KHATOD - DISCLOSURE.pdf | 2 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NITIN MALPANI - DISCLOSURE.pdf | 2 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RISHIKESH BAHETI - DISCLOSURE.pdf | 2 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SANJAY MAHESHWARI - DISCLOSURE.pdf | 2 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SHRIKANT MANDHANA - DISCLOSURE.pdf | 2 Feb 2024 |
| Proforma of Agreement for saleFile: AGREEMENT TO SELL.pdf | 2 Feb 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 2 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF ALLOTMENT LETTER.pdf | 2 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF ATS.pdf | 2 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf | 31 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf | 31 Jan 2024 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION Form B.pdf | 30 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Felicia A Wing Q4.pdf | 30 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT DECLARATION.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate - Felicia.pdf | 24 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate fELICIA.pdf | 24 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY FELICIA.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certifiacate A Wing Felicia_Final.pdf | 24 Jan 2024 |
| Building plan approvalFile: 1-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 2-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 3-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 4-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 5-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 6-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 7-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 8-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 9-10.pdf | 13 Dec 2023 |
| Building plan approvalFile: 10-10.pdf | 13 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-10.pdf | 13 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 128 filed documents as one ZIP, foldered, with a manifest
Keep FELICIA WING A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hadapsar13,700+ in Pune
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: Anand Builders
Anand Builders has 1 registration on MahaRERA, including FELICIA WING A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if FELICIA WING A is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of FELICIA WING A?
The registered promoter entity is Anand Builders, an others as per the filing. Its GSTIN 27AABAA9953G1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in FELICIA WING A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for FELICIA WING A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at FELICIA WING A?
The professionals named in the filing: Architect: Parvez Maheboob Jamadar; Engineer: Nilesh Vijay Gund; Engineer: Swanpnil Raut; Chartered Accountant: Pushpak Badrinarayanji Mundada; Chartered Accountant: Sunil Shamrao Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FELICIA WING A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback