Home / Browse projects / Thane, Maharashtra / Falcon Building No 58

Registered No litigation declared Residential / Group Housing project

Falcon Building No 58

By ROMA BUILDERS PRIVATE LIMITED

RG-MH-05417 · RERA P51700051114 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 28 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Stilt Floor, 90%
9 of 187Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Falcon Building No 58 is a Residential / Group Housing project by ROMA BUILDERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700051114 on 29 May 2023. Possession is promised by 30 Apr 2028. 178 of the 187 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameFalcon Building No 58
  • TypeResidential / Group Housing
  • Location
    • Central Avenue
    • Hiranandani Estate
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051114
  • ReraGenie IDRG-MH-05417

Builder

  • NameROMA BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70100MH1991PTC063439
  • GSTIN27AAACR7605K1Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorNiranjan L Hiranandani
  • DirectorsKamal N Hiranandani, Surendra L Hiranandani, Alka Bhatia Hiranandani
  • Other registrations28 more →
  • Completed28 of 29
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2023PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2023
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Current status

95%178 of 187 units booked
92.1%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Falcon Building No 58NA51481870187

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

Falcon Building No 58: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks87%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed355

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots355
Closed/Covered169
Open Space186

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area717 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI20038.56
Proposed, not sanctioned20,039 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGalleria Shopping Mall, Hiranandani Gardens, Powai, Mumbai 400076
Estimated costRs 167.61 cr
Cost incurredRs 154.38 cr
Work done92.11%
BuildingWingEstimatedIncurred
Falcon Building No 58NARs 160.00 crRs 148.32 cr
-NARs 7.61 crRs 6.05 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHARMISTHA MUKERJEE
EngineerJayant Bandiwadekar
Chartered AccountantUrvashi Maharshi & Co
Chartered AccountantKHUSHAL BHEDA
Chartered AccountantP S S V & Associates LLP
PartnerRole in project
ROMA BUILDERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_Falcon_Executed - Secured.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 - Falcon Mar26 QPR.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Falcon Mar26 QPR.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 - Falcon Mar26 QPR.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1_Falcon_Dec25.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1_Falcon_Dec25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_Falcon_Dec25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_Falcon_Dec25.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_Falcon_Dec25_.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_Falcon_Dec25_.pdf20 Jan 2026
Withdrawal Update Form 1File: Falcon_Form1_Sep25_RERA-Secured.pdf17 Oct 2025
Withdrawal Update Form 1File: Falcon_Form1_Sep25_RERA-Secured.pdf17 Oct 2025
Withdrawal Update Form 2File: Falcon_Form2_Sep25_RERA-Secured.pdf17 Oct 2025
Withdrawal Update Form 2File: Falcon_Form2_Sep25_RERA-Secured.pdf17 Oct 2025
Withdrawal Update Form 3File: Falcon_Form3_Sep25_RERA-Secured.pdf17 Oct 2025
Withdrawal Update Form 3File: Falcon_Form3_Sep25_RERA-Secured.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_Falcon_FY24-25 -Secured.pdf18 Sep 2025
Form 2A (FY 2024-2025)File: Falcon Form 2A Mar 25 2.pdf27 Jun 2025
Form 1File: Form 1 Dec 23.pdf19 Jun 2025
Form 2File: Form 2 Dec 23.pdf19 Jun 2025
Form 3File: Falcon CA Dec 23.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Falcon Sold Dec 23.pdf19 Jun 2025
Form 1File: Falcon Form1 June'23.pdf19 Jun 2025
Form 2File: Falcon Form2 June'23.pdf19 Jun 2025
Form 3File: Falcon Form3 June'23.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Falcon Sold Jun 23.pdf19 Jun 2025
Form 1File: Falcon Form 1.pdf19 Jun 2025
Form 2File: Falcon Form 2.pdf19 Jun 2025
Form 3File: Falcon Form 3 Sept23.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Falcon Sold Sep 23.pdf19 Jun 2025
Form 1File: Falon Form 1 Mar24.pdf19 Jun 2025
Form 2File: Falon Form 2 Mar24.pdf19 Jun 2025
Form 3File: Falon Form 3 Mar24.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Falcon Sold Mar 24.pdf19 Jun 2025
Form 1File: Falcon Form 1 Jun 24.pdf19 Jun 2025
Form 2File: Falcon Form 2 Jun 24.pdf19 Jun 2025
Form 3File: Falcon Form 3 Jun 24.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Falcon Sold Jun 24.pdf19 Jun 2025
Form 1File: Falcon Form 1 Sep 24.pdf18 Jun 2025
Form 2File: Falcon Form 2 Sep 24.pdf18 Jun 2025
Form 3File: Falcon Form 3 Sep 24.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Falcon SOLD Sep 24.pdf18 Jun 2025
Form 1File: Form 1 Falcon Dec24.pdf18 Jun 2025
Form 2File: Form 2 Falcon Dec24.pdf18 Jun 2025
Form 3File: Form 3 Falcon Dec24.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Falcon Dec24.pdf18 Jun 2025
Form 1File: Form 1 Falcon.pdf18 Jun 2025
Form 2File: Form 2 Falcon.pdf18 Jun 2025
Form 3File: Form 3 Falcon.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: Falcon Sold.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Falcon.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Falcon.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Falcon.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Falcon Sold.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Falcon Dec24.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Falcon Dec24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Falcon Dec24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Falcon Dec24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Falcon Form 1 Sep 24.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Falcon Form 3 Sep 24.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Falcon Form 2 Sep 24.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Falcon SOLD Sep 24.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_2023-24.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Form 5_2023-24.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Falcon Form 1 Jun 24.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Falcon Form 2 Jun 24.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Falcon Form 3 Jun 24.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Falcon RERA report.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Falcon 1.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Falon Form 2 Mar24.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Falon Form 3 Mar24.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Falon Form 1 Mar24.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Falcon RERA Report_compressed.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Falcon CA Dec 23.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Rera Falcon Inventory Update 05012024.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Falcon Form 3 Sept23.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Falcon Form 1.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Falcon Form 2.pdf13 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Hiranandani EstateOff Ghodbunder Road Thane W - 4006073,174CompletedDec 2018May 2017

How this compares with Thane

95%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Falcon Building No 58 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hiranandani Estate7,600+ in Thane

2 kmFalcon Building No 58Completed 72Lapsed / revoked 15Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 116 registered projects within 2 km.

Builder: ROMA BUILDERS PRIVATE LIMITED

ROMA BUILDERS PRIVATE LIMITED has 29 registrations on MahaRERA, including FORTUNA B and Eagleton. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Falcon Building No 58 is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Falcon Building No 58?

The registered promoter entity is ROMA BUILDERS PRIVATE LIMITED, a company as per the filing. Its CIN U70100MH1991PTC063439 and GSTIN 27AAACR7605K1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Falcon Building No 58?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Falcon Building No 58?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Falcon Building No 58?

The professionals named in the filing: Architect: SHARMISTHA MUKERJEE; Engineer: Jayant Bandiwadekar; Chartered Accountant: Urvashi Maharshi & Co; Chartered Accountant: KHUSHAL BHEDA; Chartered Accountant: P S S V & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Falcon Building No 58?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Falcon Building No 58. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Falcon Building No 58 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.