EVEREST PHASE 2

By J P CONSTRUCTION

RG-MH-07462 · RERA P52100077451 · Last updated on MahaRERA portal: 26 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 70%
58 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

EVEREST PHASE 2 is a Others project by J P CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100077451 on 16 Aug 2024. Possession is promised by 31 May 2027. 4 of the 62 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameEVEREST PHASE 2
  • TypeOthers
  • Location
    • NERA TALEGAON CHAKAN RD
    • VADGAON MAVAL
    • Wadagaon (CT)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077451
  • ReraGenie IDRG-MH-07462

Builder

  • NameJ P CONSTRUCTION
  • Entity typePartnership
  • PartnersJYOTI SANTOSH PATHADE, PRADHNYA PANKAJ JALIT
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2024PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2024
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed47 files

Current status

6%4 of 62 units booked
25.0%Work done, per cost certificate

Figures as on 26 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EVEREST PHASE 2NA77501262

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 70%.

EVEREST PHASE 2: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)1%
Plinth100%
Stilt Floor70%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered1
Open Space71

Land and ownership27

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,756 sq m
Land owned byThe promoter, with other names on the file
Named landowners27
LandownerVillageDistrict
VARSHA MANOHAR SAPARIYAAndheriMumbai Suburban
VAIBHAB BIRA SARGARWadagaon (CT)Pune
SHIVAJI JOTIRAM MANEPalsavadeSatara
SUVARNA ARUN USTUREMalkondjiLatur
SANJAY SUBHASH KSHIRSAGARMoholSolapur
AMAR DILIP MULIKShalgaonSangli
CHAYABAI BALIRAM PATILJalgaonJalgaon
BABUTAI ARVIND KAMBALENathawadeSangli
MANOHAR DAMAJI SAPARIYAAndheriMumbai Suburban
ASHA MARAM MULIKShalgaonSangli
UJWALA NARESH RATHODWadagaon (CT)Pune
DIPALI GANESH TAHAKALEBharudKhedeJalgaon
RASIKA SHARAD GHOLAPNigadiSatara
RENUKA SUDHAKAR KARBARIDalimbOsmanabad
SHILPA SANJAY KSHIRSAGARMoholSolapur
SANTOSH LAXMAN SHINDETalegaon Dabhade (M Cl)Pune
ASHOK RAMA RAJMANEPune (M Corp.)Pune
AARTI HARSHAL MEHTATalegaon Dabhade (R)Pune
SATYWAN BANDU KARANDEHajapurSolapur
UARSHARANI SOMNATH MHASKESolapur (M Corp.)Solapur
ANJANABAI VIKAS PATALEHasnal (545510)Nanded
AADITYA SANJAY KSHIRSAGARAshtiSolapur
RESHMA NAVNATH SHINDEAkluj (CT)Solapur
VISHALI SANDEEP YADAVVelhe Bk.Pune
TEJSWINI DATTATRAY JAYKARWagholiSatara
VAIDEHI VISHAL WARINGEVadavaliPune
UJVALA NARESH RATHODWadagaon (CT)Pune

Approvals and building plan

Sanctioning authorityVADGAON NAGARPANCHAYAT
Permissible FSI3878.44
Proposed, not sanctioned3,878 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 20-21 JARVARI SOCIETY PIMPLE SUDAGAR PUNE 411027
Estimated costRs 11.22 cr
Cost incurredRs 2.81 cr
Work done25.0%
BuildingWingEstimatedIncurred
EVEREST PHASE 2NARs 10.37 crRs 2.59 cr
-NARs 85.00 lakhRs 21.25 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAIE ENGINEERS ARCHITECTS AJAY PATIL
EngineerSAIE ENGINEERS AND ALLIED DESIGNERS AJAY PATIL
Chartered AccountantR M DANGI AND CO R M DANGI
PartnerRole in project
J P CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Letter EVEREST June 2025.pdf26 Jul 2025
Withdrawal Update Form 2File: Form 2 Enginners EVEREST 2 June 2025.pdf26 Jul 2025
Withdrawal Update Form 3File: JP Form 3 June 2025.pdf26 Jul 2025
Form 1File: Form 1 Everest Phase 2 Dec 2024.pdf25 Jul 2025
Form 2File: Form 2 Engineers Dec 2024.pdf25 Jul 2025
Form 3File: JP Form 3 Dec 2024.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold unit 31122024.pdf25 Jul 2025
Form 1File: Form 1 Architect Everest 2 March 2025.pdf25 Jul 2025
Form 2File: Form 2 Engg Everest 2 March 2025.pdf25 Jul 2025
Form 3File: JC Form 3 March 2025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unit 31032025.pdf25 Jul 2025
Form 1File: Form 2 Engg Sep 2024.pdf24 Jul 2025
Form 2File: Form 2 Engg Sep 2024.pdf24 Jul 2025
Form 3File: CA JP Cont Form 3 Jun to Sep 2024.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: CA JP Cont Form 3 Jun to Sep 2024-6-7 unsold inventory.pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JP Cont Form 3 Jun to Sep 2024.pdf5 Aug 2024
Proforma of Allotment letterFile: Allotment Performa New format with Parking.pdf31 Jul 2024
Proforma of Agreement for saleFile: RERA DRAFT J P CONSTRUCTION EVEREST PHASE 2 with parking .pdf31 Jul 2024
Other - LegalFile: Architect Form 1 compress.pdf31 Jul 2024
Copy of the legal title reportFile: Document 91_compressed.pdf17 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: pathade Annexter.pdf17 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: jalit Annexer.pdf17 Jul 2024
Details of encumbrances concerned to FinanceFile: JP Encumbrance Certificate revised.pdf2 Jul 2024
Details of encumbrances concerned to LegalFile: JP Encumbrance Certificate revised.pdf2 Jul 2024
Other - LegalFile: POA J P Construction to Santosh Pathade_compressed.pdf2 Jul 2024
Other - TechnicalFile: Adobe Scan 1 Nov 2023_240425_130012.pdf20 Jun 2024
CERSAI detailsFile: Cersai declaration.pdf18 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Accounts Format A (1).pdf18 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_200310042595_For_Asset_Based_Search_12_06_2024_16_53_48_601.pdf12 Jun 2024
Other - LegalFile: Annexure A_compressed.pdf12 Jun 2024
Other - TechnicalFile: Gmail - Please Find AttachmEVEREST_RERA.pdf12 Jun 2024
Layout approvalFile: Sanction Plan Scan_1446-01.pdf5 Jun 2024
Building plan approvalFile: Sanction Plan Scan_1446-01.pdf5 Jun 2024
Building plan approvalFile: Sanction Plan Scan_1446-02.pdf5 Jun 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan Scan_1446-01.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Scan_1446-01.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan Scan_1446-02.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Everest Phase 2 Architects Certificate.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Everest Phase 2 Engineer’s Certificate_compressed.pdf3 Jun 2024
Deviation Report with respect to Allotment letterFile: JP Allotment.pdf3 Jun 2024
Deviation Report with respect to model copy of AgreementFile: J P Construction Deviation sale deed_compressed.pdf3 Jun 2024
PAN CardFile: Pan Card.pdf2 Jun 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate JP.pdf2 Jun 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate JP.pdf2 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: EVEREST PHASE 2 CC.pdf2 Jun 2024
Declaration about Commencement CertificateFile: Format D J P construction.pdf2 Jun 2024
Declaration in FORM BFile: Form B JP construction_compressed.pdf2 Jun 2024

How this compares with Pune

6%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EVEREST PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VADGAON MAVAL13,700+ in Pune

2 kmEVEREST PHASE 2Completed 31Lapsed / revoked 30Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 92 registered projects within 2 km.

Builder: J P CONSTRUCTION

J P CONSTRUCTION has 3 registrations on MahaRERA, including SAILAXMI PARK and SAI NARAYAN HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EVEREST PHASE 2 is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EVEREST PHASE 2?

The registered promoter entity is J P CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EVEREST PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EVEREST PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EVEREST PHASE 2?

The professionals named in the filing: Architect: SAIE ENGINEERS ARCHITECTS AJAY PATIL; Engineer: SAIE ENGINEERS AND ALLIED DESIGNERS AJAY PATIL; Chartered Accountant: R M DANGI AND CO R M DANGI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EVEREST PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EVEREST PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EVEREST PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.