Red flags
- Rs 11.00 crore secured on the land, in favour of CHOICE FINSERVE FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EQUINOX is a Residential / Group Housing project by SHREENATH ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700077836 on 7 Nov 2024. Possession is promised by 31 Dec 2028. 10 of the 50 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameEQUINOX
- TypeResidential / Group Housing
- Location
- MOUJE PANCH PAKHADI
- THANE
- Thane (M Corp.)
- 400602
- Pincode400602
- RERA no.P51700077836
- ReraGenie IDRG-MH-19510
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Nov 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed54 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 1 | NA | 14 | 14 | 50 | 0 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.
BUILDING 1: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 20% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 30% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed113
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| AKASH ENTERPRISES | Thane (M Corp.) | Thane |
| ASHUTOSH GHANSHYAM JATHAR | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING 1 | NA | Rs 20.00 cr | Rs 6.72 cr |
| - | NA | Rs 5.00 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PLANHIGH PROJECT MANAGEMENT CONSULTANTS |
| Engineer | YASH PRAVIN DARAK |
| Chartered Accountant | NITIN BALAJI DHAVAN |
| Partner | Role in project |
|---|---|
| SHREENATH ENTERPRISES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 MAR 26 EQUINOX.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 MAR 26 EQUINOX.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 MAR 26 EQUINOX.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 Dec-25 - SHREENATH .pdf | 8 Apr 2026 |
| Withdrawal Update Form 2File: form 2 sept 25 sheenath enterprise.pdf | 8 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 Dec 25 - SHREENATH.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: form 1 sept 25 sheenath enterprise.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: form 2 sept 25 sheenath enterprise.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: form 3 sept 25 sheenath enterprise.pdf | 17 Oct 2025 |
| Form 1File: FORM-1- JUNE 25- SHREENATH ENT.pdf | 11 Jul 2025 |
| Form 2File: from-2-june 25- shreenath.pdf | 11 Jul 2025 |
| Form 3File: FORM 3 - SHREENATH - JUN 2025.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCL FOR SOL UNSOLD - SHREENATH - JUN 2025.pdf | 11 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: SELF DECL OF PROMOTER - JUN 2025 - SHREENATH.pdf | 11 Jul 2025 |
| Form 1File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 11 Jul 2025 |
| Form 2File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 11 Jul 2025 |
| Form 3File: 3 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCL FOR SOL UNSOLD - SHREENATH - JUN 2025.pdf | 11 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHREENATH ENTERPRISES 31-03-2025.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHREENATH ENTERPRISES 31-03-2025.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHREENATH ENTERPRISES- MARCH 25.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SHREENATH ENT FY 24-25.pdf | 17 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SHREENATH ENT FY 24-25.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREENATH FORM 3 NEW 30102024_11zon.pdf | 30 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B REVISED ALL PROMOTER.pdf | 30 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A SHREENATH.pdf | 24 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF PRADEEP LAKHOTIYA.pdf | 23 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF HIRAL PATEL.pdf | 23 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF SALMAN.pdf | 23 Oct 2024 |
| Proforma of Agreement for saleFile: REVISED DRAFT AGREEMENT.pdf | 14 Oct 2024 |
| Building plan approvalFile: PLAN_COPY-2.pdf | 8 Oct 2024 |
| Layout approvalFile: PLAN_COPY-1.pdf | 8 Oct 2024 |
| PAN CardFile: SHREENATH_ENTERPRISES-PAN_CARD.pdf | 8 Oct 2024 |
| Copy of the legal title reportFile: TITLE REPORT FIANL.pdf | 8 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: no encumbrances to finance.pdf | 8 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: legal litigation.pdf | 8 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN_COPY-1.pdf | 8 Oct 2024 |
| Proforma of Allotment letterFile: REVISED ALLOTMENT LETTER.pdf | 8 Oct 2024 |
| Declaration in FORM BFile: FORM-B, Prdeep Lakhotiya (1).pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 shreenath.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 shreenath.pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN_COPY-2.pdf | 8 Oct 2024 |
| Other - LegalFile: CTS LANDOWNERS SHREENATH.pdf | 8 Oct 2024 |
| Other - LegalFile: INDEX OWNERSHIP PROOF.pdf | 8 Oct 2024 |
| Declaration about Commencement CertificateFile: format d.pdf | 8 Oct 2024 |
| CERSAI detailsFile: cersai.pdf | 8 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: deviation allotment.pdf | 8 Oct 2024 |
| Details of encumbrances concerned to LegalFile: no encumbrances to finance.pdf | 8 Oct 2024 |
| Details of encumbrances concerned to LegalFile: legal litigation.pdf | 8 Oct 2024 |
| Other - TechnicalFile: RERA MAIL PANCHPAKHADI.pdf | 8 Oct 2024 |
| Other - TechnicalFile: annexure a one plot one project.pdf | 8 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: deviation agreement.pdf | 8 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE-SHREENATH.pdf | 8 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep EQUINOX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near THANE7,600+ in Thane
Stellar
Trimity Realty LLP
SAMRIN HERITAGE
SAMRIN INFRA PRIVATE LIMITED
L&T Realty Vayam Tower 3
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
L&T Realty Vayam Tower 4
ELANTE PROPERTIES PRIVATE LIMITED, J S K E
Codename LIT Tower A
Camrose Realtors Private Limited
Codename LIT Tower B
Camrose Realtors Private Limited
See every Thane project, with the district possession charts
Builder: SHREENATH ENTERPRISES
SHREENATH ENTERPRISES has 12 registrations on MahaRERA, including HORIZON HEIGHTS D and SHREE NATH NAGAR NO 1 AND 2. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if EQUINOX is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EQUINOX?
The registered promoter entity is SHREENATH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EQUINOX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EQUINOX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EQUINOX?
The professionals named in the filing: Architect: PLANHIGH PROJECT MANAGEMENT CONSULTANTS; Engineer: YASH PRAVIN DARAK; Chartered Accountant: NITIN BALAJI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EQUINOX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback