ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ENJAYS PARAMOUNT

Registered No litigation declared Others project

ENJAYS PARAMOUNT

By ENJAY INFRA

RG-MH-07864 · RERA P52100005870 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 72 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 72 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 80%
59 of 74Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

ENJAYS PARAMOUNT is a Others project by ENJAY INFRA in Pune, Maharashtra, registered with MahaRERA as P52100005870 on 14 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 72 months from the original filing. 15 of the 74 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameENJAYS PARAMOUNT
  • TypeOthers
  • Location
    • DARUWALA POOL
    • SOMWAR PETH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005870
  • ReraGenie IDRG-MH-07864

Builder

  • NameENJAY INFRA
  • Entity typePartnership
  • PartnerDEEPAK MOHANDAS NAVALAKHA

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2020)
  • Buildings1 building record
  • Documents filed112 files

Current status

20%15 of 74 units booked
56.7%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ENJAYS PARAMOUNTNA86542074

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

ENJAYS PARAMOUNT: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area823 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation, Pune
Permissible FSI14443.2
Proposed, not sanctioned4,443 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 9, Jhamtani Impressions, Tapovan Mandir Road, Savta Mali Nagar, Pimpri Colony, Pimpri-Chinchwad, Maharashtra 411017
Estimated costRs 4.06 cr
Cost incurredRs 2.31 cr
Work done56.71%
BuildingWingEstimatedIncurred
ENJAYS PARAMOUNTNARs 4.06 crRs 2.31 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH KANHEKAR
ArchitectRajendra H Thite
EngineerKetan Anil Sonawadekar
Chartered AccountantSachin K. Mishra & Co.
Chartered AccountantPravin Pise
Chartered AccountantVaibhav S Bhise and Associates
PartnerRole in project
ENJAY INFRA-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009329Dec 2020 → Dec 2021

Reason as filed by the promoterCORONA AND NO SALE

EXT52100015453Dec 2020 → Dec 2025

Reason as filed by the promoterThat the Promoters and Developers hugely suffered financial difficulties due to the COVID Pandemic and the aftermath thereof.

EA19092502640Dec 2020 → Dec 2026

Reason as filed by the promoterDue to certain circumstances, we are unable to complete our project. Therefore, we request an extension until 31st December 2026.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502403Ajay JatiENJAY INFRA15/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate 2026.pdf8 Jun 2026
Withdrawal Update Form 2File: Engineer certificate 2026.pdf8 Jun 2026
Withdrawal Update Form 3File: CA certificate.pdf8 Jun 2026
Withdrawal Update Form 1File: Architect certificate .pdf24 Feb 2026
Withdrawal Update Form 2File: Engineer certificate .pdf24 Feb 2026
Withdrawal Update Form 3File: F3-ENJAY INFRA Q3.pdf24 Feb 2026
Withdrawal Update Form 1File: architect certificate _compressed.pdf11 Feb 2026
Withdrawal Update Form 2File: Engg certificate _compressed.pdf11 Feb 2026
Withdrawal Update Form 3File: F3-ENJAY INFRA(sEPT-25).pdf11 Feb 2026
Form 5 (FY 2024-2025)File: CA certificate_compressed.pdf11 Feb 2026
Form 2A (FY 2017-2018)File: Form 2A.pdf24 Sep 2025
Form 2A (FY 2018-2019)File: Form 2A.pdf24 Sep 2025
Form 2A (FY 2019-2020)File: Form 2A.pdf24 Sep 2025
Form 2A (FY 2020-2021)File: Form 2A.pdf24 Sep 2025
Form 2A (FY 2021-2022)File: Form 2A.pdf24 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A.pdf24 Sep 2025
Form 5 (FY 2017-2018)File: 2017-2018.pdf24 Sep 2025
Form 5 (FY 2018-2019)File: 2018-2019.pdf24 Sep 2025
Form 5 (FY 2019-2020)File: 2019-20.pdf24 Sep 2025
Form 5 (FY 2020-2021)File: 2020-21.pdf24 Sep 2025
Form 5 (FY 2021-2022)File: 2021-22.pdf24 Sep 2025
Form 5 (FY 2022-2023)File: 2022-23.pdf24 Sep 2025
Withdrawal Update Form 1File: Architect certificate - Jun-25 (1).pdf19 Sep 2025
Withdrawal Update Form 2File: Engineers cirtificate_Jun-23.pdf19 Sep 2025
Withdrawal Update Form 3File: CA Certificate - Jun-25.pdf19 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf19 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf19 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 (1).pdf19 Sep 2025
Form 1File: Architect certificate_March 25.pdf2 Sep 2025
Form 2File: Engineer Certificate_March 25.pdf2 Sep 2025
Form 3File: CA Certificate_March 25.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Mar 25.pdf2 Sep 2025
Building plan approvalFile: LOWER GROUND FLOOR PLAN.pdf18 Mar 2025
Building plan approvalFile: UPPER GROUND FLOOR PLAN.pdf18 Mar 2025
Building plan approvalFile: FIRST FLOOR PLAN.pdf18 Mar 2025
Building plan approvalFile: SECOND FLOOR PLAN.pdf18 Mar 2025
Building plan approvalFile: THIRD FLOOR PLAN.pdf18 Mar 2025
Building plan approvalFile: FOURTH FLOOR PLAN.pdf18 Mar 2025
Building Plan Approval (IOD)File: LOWER GROUND FLOOR PLAN.pdf18 Mar 2025
Building Plan Approval (IOD)File: UPPER GROUND FLOOR PLAN.pdf18 Mar 2025
Building Plan Approval (IOD)File: FIRST FLOOR PLAN.pdf18 Mar 2025
Building Plan Approval (IOD)File: SECOND FLOOR PLAN.pdf18 Mar 2025
Building Plan Approval (IOD)File: THIRD FLOOR PLAN.pdf18 Mar 2025
Building Plan Approval (IOD)File: FOURTH FLOOR PLAN.pdf18 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Feb 2025
Building plan approvalFile: 01.pdf13 Feb 2025
Building plan approvalFile: Plan-Sheet-2.pdf13 Feb 2025
Building plan approvalFile: Plan-Sheet-3.pdf13 Feb 2025
Building plan approvalFile: Plan-Sheet-4.pdf13 Feb 2025
Building plan approvalFile: Plan-Sheet-5.pdf13 Feb 2025
Building Plan Approval (IOD)File: Plan-Sheet-2.pdf13 Feb 2025
Building Plan Approval (IOD)File: Plan-Sheet-5.pdf13 Feb 2025
Building Plan Approval (IOD)File: Plan-Sheet-4.pdf13 Feb 2025
Building Plan Approval (IOD)File: Plan-Sheet-3.pdf13 Feb 2025
Building Plan Approval (IOD)File: 01.pdf13 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate_ Dec 24.pdf13 Jan 2025
Certificates of CA (Form 3)File: CA Certificate-Dec-24_Signed.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Dec 24.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf13 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf27 Nov 2024
Certificates of CA (Form 3)File: CA Certificate-Sept'24.pdf27 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EngineerCertificate.pdf27 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format-A.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - enjay Infra.pdf27 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B.pdf27 Nov 2024
Certificates of CA (Form 3)File: CA Certificate-Dec23.pdf18 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf18 Oct 2024
Certificates of CA (Form 3)File: CA Certificate-Dec23.pdf7 Aug 2024
Certificates of CA (Form 3)File: CA Certificate-Jun23.pdf7 Aug 2024
Certificates of CA (Form 3)File: CA Certificate-Sep23.pdf7 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report_22-23.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate_dec-23.pdf6 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate_Jun-23.pdf6 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect cirtificate_Sep-23.pdf6 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects cirtificate_Mar-24.pdf6 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate_Mar_24.pdf6 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer cirtificate_Sep-23.pdf6 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Dec-23.pdf6 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers cirtificate_Jun-23.pdf6 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf6 Aug 2024

How this compares with Pune

20%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ENJAYS PARAMOUNT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SOMWAR PETH13,700+ in Pune

2 kmENJAYS PARAMOUNTCompleted 159Lapsed / revoked 130Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 432 registered projects within 2 km.

Builder: ENJAY INFRA

ENJAY INFRA has 1 registration on MahaRERA, including ENJAYS PARAMOUNT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ENJAYS PARAMOUNT is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ENJAYS PARAMOUNT?

The registered promoter entity is ENJAY INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ENJAYS PARAMOUNT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ENJAYS PARAMOUNT?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ENJAYS PARAMOUNT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ENJAYS PARAMOUNT?

The professionals named in the filing: Architect: PRAKASH KANHEKAR; Architect: Rajendra H Thite; Engineer: Ketan Anil Sonawadekar; Chartered Accountant: Sachin K. Mishra & Co.; Chartered Accountant: Pravin Pise; Chartered Accountant: Vaibhav S Bhise and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ENJAYS PARAMOUNT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ENJAYS PARAMOUNT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ENJAYS PARAMOUNT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.