Registered No litigation declared Residential / Group Housing project

Embassy One Thane

By Tapir Constructions Limited

RG-MH-19455 · RERA P51700077743 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 250.00 crore secured on the land, in favour of Various Investor in the form of NCD

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 67%
131 of 232Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Embassy One Thane is a Residential / Group Housing project by Tapir Constructions Limited in Thane, Maharashtra, registered with MahaRERA as P51700077743 on 25 Oct 2024. Possession is promised by 30 Jun 2029. 101 of the 232 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameEmbassy One Thane
  • TypeResidential / Group Housing
  • Location
    • Panchpakhadi
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077743
  • ReraGenie IDRG-MH-19455

Builder

  • NameTapir Constructions Limited
  • Entity typeCompany
  • CINU70200DL2014PLC267441
  • DirectorsAbhishek Rajninath Surve, Udya Shyamnarayan Dubey
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredOct 2024PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Oct 2024
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Current status

44%101 of 232 units booked
26.9%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
3ANA34291160116
3BNA34291160116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 67%.

3A15%
ActivityProgress
Excavation100%
Basement (if any)67%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
3B14%
ActivityProgress
Excavation100%
Basement (if any)55%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed194

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots194
Closed/Covered194
BuildingClosed/CoveredTotal
3A9797
3B9797

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area27,310 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofVarious Investor in the form of NCD
Secured amountRs 250.00 crore
CERSAI search filedYes
Declared on7 Jan 2026

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI31314.11
Proposed, not sanctioned31,314 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Ground Floor, Nyloc House, 254, D.2, Dr. Annie Besant Road, Worli, Mumbai.400030, Maharashtra
Estimated costRs 249.57 cr
Cost incurredRs 67.02 cr
Work done26.85%
BuildingWingEstimatedIncurred
3ANARs 124.78 crRs 43.56 cr
3BNARs 124.78 crRs 23.46 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAKHI UBHARE
EngineerRAMESH RAMPURE
EngineerPritam Bhanushali
Chartered AccountantAKORD AND CO
Chartered AccountantR G V A & ASSOCIATES
PartnerRole in project
Tapir Constructions Limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601362Mrs. Aruna Sanjay KhubalkarTapir Constructions Limited12/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form_2A Embassy One Thane (1).PDF1 Jul 2026
Withdrawal Update Form 1File: Form_1 Embassy One Thane_Signed.PDF17 Jun 2026
Withdrawal Update Form 2File: Signed_FORM 2_Embassy One Thane.pdf17 Jun 2026
Withdrawal Update Form 3File: Embassy One Thane.pdf17 Jun 2026
Layout approvalFile: Amended Building Plan Approval dt 17 Oct 2025_Highlighted.pdf16 Mar 2026
Withdrawal Update Form 1File: Form_1 Emessy One Thane_Final.PDF26 Feb 2026
Withdrawal Update Form 2File: Form_2 Embassy One Thane.PDF26 Feb 2026
Withdrawal Update Form 3File: Form 3_Emabssy One Thane_compressed.pdf26 Feb 2026
Layout approvalFile: Amended Plan upto 30th Floor.pdf7 Jan 2026
Building plan approvalFile: Permission and Commencement Certificate upto 30th Floor.pdf7 Jan 2026
Withdrawal Update Form 1File: Form_1 Embassy One Thane.PDF12 Dec 2025
Withdrawal Update Form 2File: Signed Form_2 Embassy One Thane.PDF12 Dec 2025
Withdrawal Update Form 3File: Form 3_Embassy Thane One_compressed.pdf12 Dec 2025
Withdrawal Update Form 1File: Form_1 Embassy One Thane.PDF18 Sep 2025
Withdrawal Update Form 2File: Form-2_Embassy One Thane Revised.pdf18 Sep 2025
Withdrawal Update Form 3File: Signed Form_3 Embassy One Thane Q1 FY 25-26.PDF18 Sep 2025
Form 2A (FY 2024-2025)File: Quality 2A Certificate Embassy One Thane.pdf30 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Embassy One Thane_Final Form 3_compressed.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Annexure B- Disclosure of Sold Unsold.PDF8 Feb 2025
Details of encumbrances concerned to FinanceFile: Annexure K-Encumbrance Concerned to Finance.PDF4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Embassy One Thane.PDF4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From_2 Embassy One Thane.PDF4 Feb 2025
CERSAI detailsFile: Annexure G-Asset Based Declaration.PDF4 Feb 2025
CERSAI detailsFile: Annexure L- Debtor Based Declaration.PDF4 Feb 2025
Details of encumbrances concerned to LegalFile: Annexure K-Encumbrance Concerned to Finance.PDF4 Feb 2025
Proforma of Allotment letterFile: Revised Draft Allotment Letter - 18TH OCT.pdf18 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Sheet 18TH OCT.pdf18 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Uday Dubey- Disclsoure of Interest in Other Real Estate Organizations.pdf17 Oct 2024
Copy of the legal title reportFile: MahaRERA Tile Certificate_compressed.pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance.PDF11 Oct 2024
Declaration in FORM BFile: Form-B-Affidavit Cum Declaration (1).PDF11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _Embassy One Thane (3).pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Indiabulls_compressed.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _Embassy One Thane (1).pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Thane CC.pdf11 Oct 2024
Declaration about Commencement CertificateFile: Declaration of CC.PDF11 Oct 2024
CERSAI detailsFile: CERSAI_Search_Report_200323822306_For_Debtor_Based_Search_11_10_2024_20_05_57_694.pdf11 Oct 2024
CERSAI detailsFile: CERSAI_Search_Report_200323822067_For_Asset_Based_Search_11_10_2024_20_01_17_779.pdf11 Oct 2024
CERSAI detailsFile: Disclosure for Secured.PDF11 Oct 2024
CERSAI detailsFile: Asset Based Declaration_New.pdf11 Oct 2024
CERSAI detailsFile: Debtor Based Declaration_NEW.pdf11 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.PDF11 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance.PDF11 Oct 2024
Other - TechnicalFile: 6.pdf11 Oct 2024
Other - TechnicalFile: 9.pdf11 Oct 2024
Other - TechnicalFile: 8.pdf11 Oct 2024
Other - TechnicalFile: 7.pdf11 Oct 2024
Other - TechnicalFile: 5.pdf11 Oct 2024
Other - TechnicalFile: 4.pdf11 Oct 2024
Other - TechnicalFile: 3.pdf11 Oct 2024
Other - TechnicalFile: 2.pdf11 Oct 2024
Other - TechnicalFile: Annexure-A.PDF11 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.PDF11 Oct 2024
Proforma of Agreement for saleFile: Final Agreement.pdf11 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured.PDF11 Oct 2024
Building plan approvalFile: Floor Plan (4).pdf13 Aug 2024
Building plan approvalFile: Thane Phase II CC dt 240124.pdf13 Aug 2024
Layout approvalFile: Thane Phase - II_compressed.pdf13 Aug 2024
PAN CardFile: 1 PAN Card (4).pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: Thane Phase - II_compressed.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Thane Phase II CC dt 240124.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan (4).pdf13 Aug 2024
Other - TechnicalFile: CC verify.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Abhishek Surve- Disclsoure of Interest in Other Real Estate Organizations.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Shailesh Binsale-Disclsoure of Interest in Other Real Estate Organizations.pdf13 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: ICIC BANK Letter.PDF13 Aug 2024

How this compares with Thane

44%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Embassy One Thane on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panchpakhadi7,600+ in Thane

2 kmEmbassy One ThaneCompleted 164Lapsed / revoked 67Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 386 registered projects within 2 km.

Builder: Tapir Constructions Limited

Tapir Constructions Limited has 2 registrations on MahaRERA, including Embassy One Thane - 1A 1B 1C and Embassy One Thane. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Embassy One Thane is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Embassy One Thane?

The registered promoter entity is Tapir Constructions Limited, a company as per the filing. Its CIN U70200DL2014PLC267441 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Embassy One Thane?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Embassy One Thane?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Embassy One Thane?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Embassy One Thane?

The professionals named in the filing: Architect: RAKHI UBHARE; Engineer: RAMESH RAMPURE; Engineer: Pritam Bhanushali; Chartered Accountant: AKORD AND CO; Chartered Accountant: R G V A & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Embassy One Thane?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Embassy One Thane. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Embassy One Thane to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.