Home / Browse projects / Thane, Maharashtra / Ellora Heights

Completed No litigation declared Residential / Group Housing project

Ellora Heights

By Ellora Realcon LLP

RG-MH-25308 · RERA P51700006180 · Last updated on MahaRERA portal: 14 Jun 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • 2 extensions taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2019Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Ellora Heights is a Residential / Group Housing project by Ellora Realcon LLP in Thane, Maharashtra, registered with MahaRERA as P51700006180 on 14 Aug 2017. The registration is recorded completed; possession was promised by 31 Jul 2019. 2 complaints are on record with the regulator.

At a glance

Project

  • NameEllora Heights
  • TypeResidential / Group Housing
  • Location
    • GCC Club Road
    • GCC Club
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700006180
  • ReraGenie IDRG-MH-25308

Builder

  • NameEllora Realcon LLP
  • Entity typePartnership
  • PartnersMD Jamal Akhtar, Rizwan Ansari

Key dates

this monthRegisteredAug 2017PromisedJul 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion31 Jul 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ellora HeightsNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Ellora Heights: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,407 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Build MusallasAndheriMumbai Suburban
Ravi DevelopmentsKandivaliMumbai Suburban

Approvals and building plan

Permissible FSI6155.62
Proposed, not sanctioned6,156 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSamarth Vaibhav Lokhandwala Andheri West Mumbai 400053

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Ellora Realcon LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700002024Jul 2019 → Jul 2020

Reason as filed by the promoter1. The building is part of larger layout and there is joint podium for all the buildings of the layout and all the buildings are being developed by different developers, therefore construction of the podium is pending. 2. The RCC work has been completed and finishing work has been almost 80-90% completed except podium. 3. Lift installation work has been almost completed. 4. entire construction of the work will be finished within 6-8 months , however the additional time period is required for receipt of the occupation certificate and other formalities.

EXT51700025957Jul 2019 → Dec 2027

Reason as filed by the promoterWe hereby submit that our project name Ellora heights having registration number P51700006180 was completed within the stipulated timeline and we had uploaded Form 4 on 24/01/2020 Subsequently, we got permission for additional FSI of 2747.98 sq. meters and permission for additional construction from 12th floor to 20th floor in the project. We have uploaded the construction permission letter No......... dated ....... issued by the planning authority- Mira Bhayander Municipal Corporation having permission to construct up to 20th floor in the project and we are in the process to apply for necessa

Litigation declared1

CaseCourtStatus
469/2014District and sessions Court ThaneFor Framing Issues

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000193074Natwar AgarwalBuild Musallas19/03/2020
CC006000000231140MOHAN VAGARAM PATELMS Build Musallas18/05/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 as on 30_09_2024.pdf14 Jun 2025
Layout approvalFile: C4 GROUND AND TYPICAL FLOOR.PDF22 Mar 2025
Copy of Layout Approval (in case of layout)File: C4 GROUND AND TYPICAL FLOOR.PDF22 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Order no 56_Format A RERA Designated Bank Account.pdf17 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Order no 56_Format B.pdf17 Mar 2025
Certificates of CA (Form 3)File: Disclosure of Sold Unsold Inventory 31032024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 30062024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Disclosure of Sold Unsold Inventory 30092024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 31032024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 30062024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 30092024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 31032024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Form 3 as on 30062024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Form 3 as on 30092024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 31032024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 30062024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 30092024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Disclosure of Sold Unsold Inventory 31032024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 30062024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Disclosure of Sold Unsold Inventory 30092024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 31032024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 30062024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 30092024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 31032024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Form 3 as on 30062024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Form 3 as on 30092024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 31032024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 30062024.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory 30092024.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 as on 31033024.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 as on 31033024.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 as on 31032024.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 as on 31032024.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Certificate FY 23-24.pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Certificate FY 23-24.pdf28 Jan 2025
Layout approvalFile: 6 Project Information.pdf30 Dec 2024
Layout approvalFile: 6 Project Information.pdf30 Dec 2024
Copy of Layout Approval (in case of layout)File: 6 Project Information.pdf30 Dec 2024
Declaration in FORM BFile: Form B.pdf30 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 31032024.pdf30 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30062024.pdf30 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30092024.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 31032024 signed.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 30062024 Signed.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 30092024 Signed.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 30062024.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 30092024.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 31032024.pdf30 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Project Information.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: ELLORA HEIGHTS INFORMATION OF SOLD - BOOKED INVENTORY 31-03-2024.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: ELLORA HEIGHTS INFORMATION OF SOLD -BOOKED INVENTORY 30-06-2024.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: ELLORA HEIGHTS INFORMATION OF SOLD - BOOKED INVENTORY 30-09-2024.pdf30 Dec 2024
Declaration about Commencement CertificateFile: Declaration abt further CC_format D.pdf30 Dec 2024
Copy of Layout Approval (in case of layout)File: 6 Project Information.pdf30 Dec 2024
Declaration in FORM BFile: Form B.pdf30 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 31032024.pdf30 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30062024.pdf30 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30092024.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 31032024 signed.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 30062024 Signed.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 30092024 Signed.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 30062024.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 30092024.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 31032024.pdf30 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: 7 Project Information.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: ELLORA HEIGHTS INFORMATION OF SOLD - BOOKED INVENTORY 31-03-2024.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: ELLORA HEIGHTS INFORMATION OF SOLD -BOOKED INVENTORY 30-06-2024.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: ELLORA HEIGHTS INFORMATION OF SOLD - BOOKED INVENTORY 30-09-2024.pdf30 Dec 2024
Declaration about Commencement CertificateFile: Declaration abt further CC_format D.pdf30 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Ellora Heights Ragistration Certificate.PDF1 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 ERLLP Rera003.pdf29 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ERLLP - FORM 5.pdf17 Nov 2020
Architect’s Certificate on Completion of Project (Form 4)File: form 4 ellora_1.pdf24 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Annual Report_.pdf9 Nov 2019
Certificates of CA (Form 5)File: CA Annual Report for RERA.pdf13 Oct 2018
Layout approvalFile: 51_Page_1.pdf29 Jul 2017
Building plan approvalFile: 51_Page_3.pdf29 Jul 2017
Building plan approvalFile: covering letter.pdf29 Jul 2017
Building plan approvalFile: 51_Page_2.pdf29 Jul 2017
PAN CardFile: PAN Card .pdf29 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ellora Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GCC Club7,600+ in Thane

2 kmEllora HeightsCompleted 103Lapsed / revoked 74Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 275 registered projects within 2 km.

Builder: Ellora Realcon LLP

Ellora Realcon LLP has 1 registration on MahaRERA, including Ellora Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Ellora Heights is delayed beyond 31 Jul 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ellora Heights?

The registered promoter entity is Ellora Realcon LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ellora Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ellora Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ellora Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Ellora Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ellora Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ellora Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.