Home / Browse projects / Thane, Maharashtra / Elite Platina 19

Completed No litigation declared Others project

Elite Platina 19

By VIJAY ASSOCIATES (WADHWA)

RG-MH-09552 · RERA P51700008189 · Last updated on MahaRERA portal: 5 Jul 2021

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Elite Platina 19 is a Others project by VIJAY ASSOCIATES (WADHWA) in Thane, Maharashtra, registered with MahaRERA as P51700008189 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 2 complaints are on record with the regulator.

At a glance

Project

  • NameElite Platina 19
  • TypeOthers
  • Location
    • Thane
    • Thane (M Corp.)
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008189
  • ReraGenie IDRG-MH-09552

Builder

  • NameVIJAY ASSOCIATES (WADHWA)
  • Entity typePartnership
  • PartnersNAVIN AMARLAL MAKHIJA, Vijay Vasudev Wadhwa, Vinita Vijay Wadhwa, Ritu Wadhwa Makhija, Rituvarsha Estates Pvt Ltd Rituvarsha Estates Pvt Ltd, Wadhwa Estate And Developers India Pvt Ltd Wadhwa Estate And Developers India Pvt Ltd, Wadhwa Constructions and Infrastructures Pvt Ltd Wadhwa Constructions and Infrastructures Pvt Ltd, Wadhwa And Associates Realtors Pvt Ltd Wadhwa And Associates Realtors Pvt Ltd, Raghuleela Estates Pvt Ltd Raghuleela Estates Pvt Ltd
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Elite Platina 19NA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Elite Platina 19: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed155

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots155
Closed/Covered101
Open Space54

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area545 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Money Magnum ConstructionsKurlaMumbai Suburban

Approvals and building plan

Permissible FSI6795.43
Proposed, not sanctioned6,795 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Conwood House, Yashodham, A K Marg, Mumbai - 400 064

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaakaar Architects
EngineerS R Estimation
Chartered AccountantGmj & Co.
PartnerRole in project
VIJAY ASSOCIATES (WADHWA)-

Litigation declared7

CaseCourtStatus
346/2011High Court BombayFor Pronouncement of Judgement
5751/2018High Court BombayDisposed of
62/2020Additional District and Sessions Judge ThaneAs per Order of Hon Bom HC all proceedings between the parties pending before any judicial or non ju
639/2019State Consumer Disputes Redressal Commission MaharashtraPending
367/2021 and IA No 3120/2021/2021High Court BombayAs per Order of Hon Bom HC all proceedings between the parties pending before any judicial or non ju
10350/2023High Court BombayPENDING This case is not likely to affect this current project adversely
St No 23035/2023High Court BombayPENDING This case is not likely to affect this current project adversely

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000023098SHEETAL SURESH NALAVADEVIJAY ASSOCIATES (WADHWA)31/01/2018
CC006000000056964Refund of booking amountVijay Wadhwa03/03/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jan 2020

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proforma of Allotment letterFile: 19EPA_AFS_RERA Upload_12062021.pdf5 Jul 2021
Details of encumbrancesFile: Elite Platina 19.pdf12 May 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Elite Platina-Soceity Registration Certificate.pdf15 Dec 2020
Details of encumbrancesFile: Encumbrances-dec-Elite-19.pdf17 Sep 2020
Details of Restarting of Construction work post lockdownFile: Post Covid - Elite.pdf16 Jul 2020
OtherFile: Legal Order Society_compressed.pdf7 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (Bldg 19)_compressed.pdf28 Jan 2020
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - BLDG 19.pdf13 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Elite 19.pdf7 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Elite Platina 19.pdf14 Nov 2019
Certificates of CA (Form 5)File: Elite Platina 19.pdf23 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-19,March.pdf26 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T-19,June.pdf26 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Platina 19 A-30-06-19.pdf22 Aug 2019
Certificates of CA (Form 3)File: Tower 19_compressed.pdf16 Aug 2019
Certificates of CA (Form 3)File: Tower 19 - December 2018_compressed.pdf13 Aug 2019
Certificates of CA (Form 3)File: Tower 19 - March 2019_compressed.pdf13 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Platina 19 A-31-12-18.pdf9 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Platina 19 A-31-03-19.pdf9 Aug 2019
OtherFile: Amended CFO NOC - Bldg 19_compressed (1).pdf25 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (Bldg 19)_compressed (1).pdf8 May 2019
Details of encumbrancesFile: Elite Platina 19.pdf5 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg-Certificate-Platina-T19.pdf26 Dec 2018
Certificates of CA (Form 3)File: Tower -19 CA Certificate 30-9-18.pdf26 Dec 2018
Certificates of CA (Form 5)File: VAW Elite Platina 19.pdf30 Sep 2018
Certificates of CA (Form 5)File: Elite Platina 19.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate T 19_as on 30-06-18.pdf5 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert-Platina 19-30-06-18.pdf5 Sep 2018
Certificates of CA (Form 3)File: CA Certificate_Tower 19_30-06-18.pdf5 Sep 2018
Certificates of CA (Form 3)File: CA Certificate_Tower 19_31-03-18.pdf5 Sep 2018
Details of encumbrancesFile: Encumbrances-Elite Platina-19 Aug 18.pdf28 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-Platina T19-31-03-18.pdf27 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Elite_T19_31-12-17.pdf17 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate_Elite-T19_31-12-17.pdf17 Mar 2018
Certificates of CA (Form 3)File: CA Certificate_Tower 19_31-12-2017.pdf17 Mar 2018
Certificates of CA (Form 3)File: CA Certificate_Elite_Tower 19_30-09-17.pdf18 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 19_Architect Certificate_30-09-17.pdf10 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tower 19_Engineer Certificate_30-09-17.pdf10 Nov 2017
Details of encumbrancesFile: Uploaded om RERA - Addl Encumb Note - Bldg No 19 - 03112017.pdf3 Nov 2017
Proforma of Allotment letterFile: Uploaded on RERA - Recd from Vimal Sir - Elite AFS_Revised - 03112017.pdf3 Nov 2017
Certificates of CA (Form 3)File: CA Certificate T19.pdf29 Jul 2017
Details of encumbrancesFile: EncumrbanceLtr-Building19.pdf28 Jul 2017
Declaration in FORM BFile: Declaration-19.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Bldg 19.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Tower 19_Engineer Certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: AgreementForSale-Final-RERA(DeveloperAndOwner)-compressed.pdf28 Jul 2017
Layout approvalFile: Sheet 1-compressed.pdf27 Jul 2017
Building plan approvalFile: CC- Bldg 19,20 - 17-4-17.pdf27 Jul 2017
PAN CardFile: PAN-VijayAssociates.pdf27 Jul 2017
Copy of the legal title reportFile: Title Report-October2013.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet 1-compressed.pdf27 Jul 2017
Building Plan Approval (IOD)File: CC- Bldg 19,20 - 17-4-17.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC- Bldg 19,20 - 17-4-17.pdf27 Jul 2017
OtherFile: Elite_19 - Letter on Proposed Plan Change - 27072017.pdf27 Jul 2017
Details of encumbrancesFile: Recd from Mukesh - Loan Trench 1_2 - Index 2 Page - 26072017.pdf26 Jul 2017
Details of encumbrancesFile: Elite_19 - Decl for Encumb - Signed by MG_SV - 24072017.pdf24 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
Elite Solitaire 15P51700006610Thane, ThaneAug 2017CompletedDec 2021Late, Jul 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Elite Platina 19 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

2 kmElite Platina 19Completed 166Lapsed / revoked 56Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 335 registered projects within 2 km.

Builder: VIJAY ASSOCIATES (WADHWA)

VIJAY ASSOCIATES (WADHWA) has 4 registrations on MahaRERA, including Elite Solitaire 16 and Elite Solitaire 15. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Elite Platina 19 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Elite Platina 19?

The registered promoter entity is VIJAY ASSOCIATES (WADHWA), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Elite Platina 19?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Elite Platina 19?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Elite Platina 19?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Elite Platina 19?

The professionals named in the filing: Architect: Saakaar Architects; Engineer: S R Estimation; Chartered Accountant: Gmj & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Elite Platina 19?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Elite Platina 19. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Elite Platina 19 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.