Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Elegant Residency is a Residential / Group Housing project by ELEGANT BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049271 on 3 Feb 2023. Possession is promised by 31 Dec 2026. 58 of the 65 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameElegant Residency
- TypeResidential / Group Housing
- Location
- OLD NAGARDAS ROAD
- MOGRA
- Andheri
- Mumbai Suburban
- 400069
- Pincode400069
- RERA no.P51800049271
- ReraGenie IDRG-MH-36326
Builder
- NameELEGANT BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersRAVISHANKAR MISRILAL GUPTA, FIROZ MOHAMMAD AKRAM SHAIK, VINOD RADHESHYAM PAHARIA, Anand Parab
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Feb 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ELEGANT RESIDENCY | NA | 18 | 18 | 65 | 0 | 65 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.
ELEGANT RESIDENCY: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 93% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 45% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed57
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ELEGANT RESIDENCY | NA | Rs 28.00 cr | Rs 19.30 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vivek Bhole Architects Pvt Ltd |
| Engineer | SURA AND ASSOCIATES |
| Chartered Accountant | Kapure and Kapure Chartered Accountants |
| Chartered Accountant | Prakash Rathi |
| Chartered Accountant | Jay Jhaveri |
| Partner | Role in project |
|---|---|
| ELEGANT BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 30626_compressed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 3062026_compressed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 June 26_compressed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: Architech Certificate March 26.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: Sure Certificate form 2.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: form 3 signed_promoter acceptance_compressed.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate 311125.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate 311125.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 2025 - 12-01-2026.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 2025 - 12-01-2026_compressed.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Signed_compressed.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Signed_compressed.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 25.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Engg Certificate FORM 2.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 25 signed.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Final - FY 2024-25.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: From 1 June 25_compressed.pdf | 5 Sep 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 5 Sep 2025 |
| Withdrawal Update Form 3File: Form 3_compressed_merged.pdf | 5 Sep 2025 |
| Withdrawal Update Form 1File: From 1 June 25_compressed.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: From 1 June 25_compressed.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3_compressed_merged.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form 3_compressed_merged.pdf | 6 Aug 2025 |
| Withdrawal Update Form 1File: From 1 June 25_compressed.pdf | 31 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 31 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 June 2024.pdf | 31 Jul 2025 |
| Withdrawal Update Form 1File: From 1 June 25_compressed.pdf | 19 Jul 2025 |
| Withdrawal Update Form 1File: From 1 June 25_compressed.pdf | 19 Jul 2025 |
| Withdrawal Update Form 1File: From 1 June 25_compressed.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 June 2024.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 June 2024.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 June 2024.pdf | 19 Jul 2025 |
| Form 1File: Form 1 - Elegant.pdf | 18 Jun 2025 |
| Form 2File: Form 2 - Elegant.pdf | 18 Jun 2025 |
| Form 3File: Form 3 - Elegant.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 25 - Elegant.pdf | 18 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Elegant.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Elegant.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Elegant.pdf | 2 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure - March 25 - Elegant.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elegant Builder - Signed Form 3.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 19 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate SEPT 24.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate SEPT 24.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SBI SEPT 24.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf | 25 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 March24 .pdf | 21 May 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY SOLD-UNSOLD_page-0001.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architic Certificate Marc 24.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sura Associate March24.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-1_merged.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 311223.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sura Engg Certificate Dec 23.pdf | 9 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Elegant Builders Dec 23 final_compressed.pdf | 9 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 300923.pdf | 2 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 311223.pdf | 1 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar 23.pdf | 1 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2023.pdf | 1 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 300623.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering certificate - 300623.pdf | 20 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SITE Engineering CERTIFICATE 310323.pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 300623 Signed copy_compressed.pdf | 20 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CA Certificate.pdf | 20 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY SOLD-UNSOLD.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ELGANT SIGNED_compressed.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Vivek Bhole.pdf | 9 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Elegant.pdf | 9 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Elegant Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOGRA6,700+ in Mumbai Suburban
Nityanand Nagar Vibhag IV Cooperative Housing
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED
FORTUNE ELITE
SAFFRON SPACES LIMITED
NICCO RESIDENCY
NEELKAMAL REALTY & CONSTRUCTION LLP
Parleshwar Aangan
Panom Developers LLP
ATHARV AARADHYAM
Atharv Infra LLP
Krishna Milan Heights
Milan Interbuilt Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: ELEGANT BUILDERS AND DEVELOPERS
ELEGANT BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including Elegant Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Elegant Residency is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Elegant Residency?
The registered promoter entity is ELEGANT BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Elegant Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Elegant Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Elegant Residency?
The professionals named in the filing: Architect: Vivek Bhole Architects Pvt Ltd; Engineer: SURA AND ASSOCIATES; Chartered Accountant: Kapure and Kapure Chartered Accountants; Chartered Accountant: Prakash Rathi; Chartered Accountant: Jay Jhaveri. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Elegant Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback