Home / Browse projects / Pune, Maharashtra / Elegance Vega
Elegance Vega
RG-MH-77853 · RERA P52100049473 · Last updated on MahaRERA portal: 23 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Elegance Vega is a Others project by Elegance Landmarks in Pune, Maharashtra, registered with MahaRERA as P52100049473 on 15 Feb 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 6 months from the original filing. 71 of the 74 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameElegance Vega
- TypeOthers
- Location
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049473
- ReraGenie IDRG-MH-77853
Builder
- NameElegance Landmarks
- Entity typePartnership
- PartnersAnil Raosaheb Khedkar, Ajit Jalindar Narute, Balaji Trimbak Shinde, Dattatray Hanmantrao Misale, Surekha Bapurao Funde, BalaVenkata Govindu Anneboyina, Rohan Bhaskar Savkar
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2026)
- Buildings2 building records
- Documents filed168 files
Current status
Figures as on 23 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 7 | 7 | 35 | 5 | 40 |
| B Wing | NA | 8 | 7 | 28 | 6 | 34 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.
A Wing78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
B Wing78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed110
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Wing | 11 | 44 | 55 |
| B Wing | 11 | 44 | 55 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Wing | NA | Rs 15.06 cr | Rs 12.35 cr |
| B Wing | NA | Rs 13.68 cr | Rs 11.22 cr |
| - | NA | Rs 2.58 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Viraj Tagare |
| Engineer | G A Bhilare |
| Engineer | Vivekanand D More |
| Engineer | Rohinee Badgujar |
| Chartered Accountant | CA Sameer Ladda |
| Chartered Accountant | Ayush Vinodkumar Dargad |
| Partner | Role in project |
|---|---|
| Elegance Landmarks | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) There Was a delay in obtaining the commencement certificate From The Local Municipal Corporation. 2. In our project there is basement parking arrangement, we have to excavate almost 35 feet as guided by Rcc consultant, it took 6 months time to complete excavation & foundation work 3. We are giving puzzle parking system to our customers which is independent system, so the design of parking and revise rcc work up to plinth takes 6 months time to reach plinth level. Our plinth level checking certificate was received on 29/02/2024. 4. In our first sanction only 3, 4 floors were sanctioned out o
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jan 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jan 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed168
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 (1).pdf | 23 Jul 2026 |
| Withdrawal Update Form 2File: Elegance vega june 26 (1) (1).pdf | 23 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 (4).pdf | 23 Jul 2026 |
| Form 2A (FY 2025-2026)File: 2025-2026 (2).pdf | 19 Jun 2026 |
| Form 2A (FY 2026-2027)File: 2026-2027 (1).pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Rera Main.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: Elegance Vega March 26.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3 Rera Main.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: Form 1 (6) (1)_compressed (1).pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: Elegance Vega sep 25 (2) (1).pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: Final RERA Form 3 Q2 (3) (1)_compressed.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: wu form 1.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: wu form 2.pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: final f3.pdf | 5 Feb 2026 |
| Layout approvalFile: LAYOUT.pdf | 14 Jan 2026 |
| Building plan approvalFile: FLOOR PLAN 2.pdf | 14 Jan 2026 |
| Building plan approvalFile: FLOOR PLAN 3.pdf | 14 Jan 2026 |
| Building plan approvalFile: FLOOR PLAN 4.pdf | 14 Jan 2026 |
| Building plan approvalFile: FLOOR PLAN 5.pdf | 14 Jan 2026 |
| Form 1File: form 1 jun 25 (2).pdf | 26 Nov 2025 |
| Form 2File: Elegance Vega june 25 (1) (2).pdf | 26 Nov 2025 |
| Form 3File: Scanned copy FORM 3 (1) (1).pdf | 26 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUN 25.pdf | 26 Nov 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 MAHARERA_FY 2023-2024.pdf | 3 Sep 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 MAHARERA_FY 2024-2025.PDF | 3 Sep 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A 24-25.pdf | 26 Aug 2025 |
| Form 2A (FY 2023-2024)File: form 2A 2023-24 ev (1).pdf | 26 Aug 2025 |
| Form 2A (FY 2022-2023)File: form 2A 22-23.pdf | 26 Aug 2025 |
| Form 1File: F1 MAR 23.pdf | 25 Aug 2025 |
| Form 2File: Form2 mar 23.pdf | 25 Aug 2025 |
| Form 3File: F3 Mar 23 (1).pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold Mar 23.pdf | 25 Aug 2025 |
| Form 1File: F1 SEP 24 EV (1)_11zon.pdf | 21 Aug 2025 |
| Form 2File: F2 Elegance Vega sep 24 (1).pdf | 21 Aug 2025 |
| Form 3File: Final q2.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 21 Aug 2025 |
| Form 1File: F1 DEC 24 EV (1).pdf | 21 Aug 2025 |
| Form 2File: F2 Elegance Vega Dec 24.pdf | 21 Aug 2025 |
| Form 3File: Final q3.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold Dec 24.pdf | 21 Aug 2025 |
| Form 1File: F1 JUNE 23 (1).pdf | 14 Aug 2025 |
| Form 2File: F2 Jun 23.pdf | 14 Aug 2025 |
| Form 3File: F3 Jun 23 (1).pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold jun 23.pdf | 14 Aug 2025 |
| Form 1File: F1 SEP 23 EV (1).pdf | 14 Aug 2025 |
| Form 2File: F2 Sep 23.pdf | 14 Aug 2025 |
| Form 3File: F3 SEP23 (1).pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sep 23.pdf | 14 Aug 2025 |
| Form 1File: F1 JUN 24.pdf | 14 Aug 2025 |
| Form 2File: F2 JUN 24.pdf | 14 Aug 2025 |
| Form 3File: F3 JUN24.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Jun 24.pdf | 14 Aug 2025 |
| Form 1File: F1 MAR 24 EV (1).pdf | 14 Aug 2025 |
| Form 2File: F2 MAR 24.pdf | 14 Aug 2025 |
| Form 3File: F3 MAR24 (1).pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold mar 24.pdf | 14 Aug 2025 |
| Form 1File: f1 mar 25 EV (1).pdf | 14 Aug 2025 |
| Form 2File: F2 Mar 25.pdf | 14 Aug 2025 |
| Form 3File: F3 MAR25 EV (1).pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold mar 25 (1).pdf | 14 Aug 2025 |
| Form 1File: F1 DEC 23 (1).pdf | 14 Aug 2025 |
| Form 2File: F2 Dec 23.pdf | 14 Aug 2025 |
| Form 3File: F3 DEC23 (1).pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec 23.pdf | 14 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED Q2 FORM 3_250428_204035_compressed.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 Q3_250428_204106_compressed.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 Q3_250428_204106_compressed.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3 Q4_250428_204127_compressed.pdf | 29 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (4).pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elegance Vega (1) (1).pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold (4).pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A (2).pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_compressed.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 20 Jan 2025 |
| Layout approvalFile: main layout_compressed (1).pdf | 5 Nov 2024 |
| Building plan approvalFile: plan 2.pdf | 5 Nov 2024 |
| Building plan approvalFile: plan 3.pdf | 5 Nov 2024 |
| Building plan approvalFile: plan 4.pdf | 5 Nov 2024 |
| Building plan approvalFile: plan 5.pdf | 5 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: main layout_compressed (1).pdf | 5 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 168 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Elegance Vega on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
Filed coordinates, straight-line distance. 294 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: Elegance Landmarks
Elegance Landmarks has 1 registration on MahaRERA, including Elegance Vega. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Elegance Vega is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Elegance Vega?
The registered promoter entity is Elegance Landmarks, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Elegance Vega?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Elegance Vega?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Elegance Vega?
The professionals named in the filing: Architect: Ar Viraj Tagare; Engineer: G A Bhilare; Engineer: Vivekanand D More; Engineer: Rohinee Badgujar; Chartered Accountant: CA Sameer Ladda; Chartered Accountant: Ayush Vinodkumar Dargad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Elegance Vega?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback