ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ELANZA

Registration lapsed No litigation declared Residential / Group Housing project

ELANZA

By SANTOSH MARIBA BAGADI

RG-MH-64504 · RERA P52100049275 · Last updated on MahaRERA portal: 29 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Rs 0.95 crore secured on the land, in favour of SHRI GANESH SAHAKARI BANK LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
15 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

ELANZA is a Residential / Group Housing project by SANTOSH MARIBA BAGADI in Pune, Maharashtra, registered with MahaRERA as P52100049275 on 7 Feb 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 13 of the 28 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameELANZA
  • TypeResidential / Group Housing
  • Location
    • SR. NO. 172/3/1
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049275
  • ReraGenie IDRG-MH-64504

Builder

  • NameSANTOSH MARIBA BAGADI
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredFeb 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Current status

46%13 of 28 units booked
79.9%Work done, per cost certificate

Figures as on 29 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ELANZANA7728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

ELANZA: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area774 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSHRI GANESH SAHAKARI BANK LTD
Secured amountRs 0.95 crore
CERSAI search filedYes
Declared on30 Sep 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION BUILDING PERMISSION DEPARTMENT
Permissible FSI1774.88
Proposed, not sanctioned1,775 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSR NO 53/1 B/2 AND 14,VINAYAK NAGAR NEW SANGVI , PIMPLE GURAV , PUNE 411061
Estimated costRs 6.50 cr
Cost incurredRs 5.20 cr
Work done79.92%
BuildingWingEstimatedIncurred
ELANZANARs 6.00 crRs 4.70 cr
-NARs 50.00 lakhRs 50.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAMAL KAVATHKAR
EngineerGanesh Deshmukh
EngineerPALASH RAJAN SHINDE
EngineerSWAPNIL LADKAT
Chartered AccountantHMA & Associates FRN 100537W CA Eshan P. Porwal Partner M. No. 195835
Chartered AccountantRakesh Parmar & company
Chartered AccountantNVM & Associates
PartnerRole in project
SANTOSH MARIBA BAGADI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM1 UPDATED.pdf29 Dec 2025
Withdrawal Update Form 1File: FORM1 UPDATED.pdf29 Dec 2025
Withdrawal Update Form 2File: FORM 2 UPDATED.pdf29 Dec 2025
Withdrawal Update Form 2File: FORM 2 UPDATED.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 updated.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 updated.pdf29 Dec 2025
Layout approvalFile: 1.pdf25 Dec 2025
Building plan approvalFile: 2_compressed.pdf25 Dec 2025
Building plan approvalFile: 3.pdf25 Dec 2025
Form 2A (FY 2024-2025)File: form 2a.PDF22 Aug 2025
Form 2A (FY 2023-2024)File: form 2a.PDF21 Aug 2025
Form 5 (FY 2023-2024)File: form 5 23-24.PDF21 Aug 2025
Form 5 (FY 2024-2025)File: form 5 24- 250001.PDF21 Aug 2025
Form 1File: form 1 quarter 4 2023-2024.PDF13 Aug 2025
Form 2File: form 2 quarter 4 2023-2024.PDF13 Aug 2025
Form 3File: form 3 qtr 4 2023 2024.PDF13 Aug 2025
Disclosure of Sold and Booked InventoryFile: disclosure sold unsold 07_04_2024.PDF13 Aug 2025
Form 1File: form 1 quarter 1 2024-2025.PDF13 Aug 2025
Form 2File: form 2 quarter 1 2024-2025.PDF13 Aug 2025
Form 3File: form 3 april to june 2024.PDF13 Aug 2025
Disclosure of Sold and Booked InventoryFile: disclosure april to june 2024.PDF13 Aug 2025
Form 1File: form 1 quarter 2 2024-2025.PDF13 Aug 2025
Form 2File: form 2 quarter 2 2024-2025.PDF13 Aug 2025
Form 3File: form 3 july to sept 2024.PDF13 Aug 2025
Disclosure of Sold and Booked InventoryFile: disclosure july to sept 2024.PDF13 Aug 2025
Form 1File: form 1 quarter 3 2024-2025.PDF13 Aug 2025
Form 2File: form 2 quarter 3 2024-2025.PDF13 Aug 2025
Form 3File: form 3 oct to dec 2024.PDF13 Aug 2025
Disclosure of Sold and Booked InventoryFile: disclosure oct to dec 2024.PDF13 Aug 2025
Form 1File: form 1 quarter 4 2024-2025.PDF13 Aug 2025
Form 2File: form 2 jan to march 2025.PDF13 Aug 2025
Form 3File: form 3 jan to march 2025.PDF13 Aug 2025
Disclosure of Sold and Booked InventoryFile: disclosure jan to march 2025.PDF13 Aug 2025
Form 1File: form 1 quarter 1 2025-2026.PDF13 Aug 2025
Form 2File: form 2 april to june 2025.PDF13 Aug 2025
Form 3File: form 3 april to june 2025.PDF13 Aug 2025
Disclosure of Sold and Booked InventoryFile: disclosure april to june 2025.PDF13 Aug 2025
Form 1File: form 1 1.PDF19 May 2025
Form 2File: form 2 1.PDF19 May 2025
Form 3File: quarter 1 form 3 updated elanza quarter 1.PDF19 May 2025
Form 1File: form 2 1.PDF19 May 2025
Form 2File: form 1 1.PDF19 May 2025
Form 3File: quarter 1 form 3 updated elanza quarter 1.PDF19 May 2025
Form 1File: form 2 1.PDF19 May 2025
Form 2File: form 1 1.PDF19 May 2025
Form 3File: quarter 1 form 3 updated elanza quarter 1.PDF19 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: 14671 mortgage deed elanza.PDF23 Feb 2025
Layout approvalFile: 1_compressed.pdf10 Feb 2025
Copy of Layout Approval (in case of layout)File: 1_compressed.pdf10 Feb 2025
Copy of the legal title reportFile: elanza search report 06_12_2024.PDF13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 1.PDF5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 2.PDF5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 3.PDF5 Feb 2024
Declaration about Commencement CertificateFile: declaration about commencement certificate latest.PDF3 Feb 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold or booked inventory latest.PDF3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 10002.PDF2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 2.PDF2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 3.PDF2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 2.PDF2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 3.PDF2 Feb 2024
Building plan approvalFile: 1.pdf28 Aug 2023
Building plan approvalFile: 2.pdf28 Aug 2023
Building plan approvalFile: 3.pdf28 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf28 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf28 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf28 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 0.pdf28 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 updated elanza quarter 1.PDF28 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 latest format.pdf4 Feb 2023
Declaration in FORM BFile: Declaration FORM B.pdf21 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of unsold sold flat.PDF10 Jan 2023
Proforma of Allotment letterFile: Elanza Model Form of allotement letter.PDF10 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.PDF10 Jan 2023
Deviation Report with respect to Allotment letterFile: Elanza Deviation report of allotement letter.PDF10 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Elanza Deviation report for AGREEMENT to sale.PDF10 Jan 2023
CERSAI detailsFile: cersai letter elanza.PDF9 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organization.PDF9 Jan 2023
Proforma of Agreement for saleFile: Rera - flat PDF.pdf8 Jan 2023
Copy of the legal title reportFile: elanza search report 2022 latest.PDF8 Dec 2022
Details of encumbrances concerned to FinanceFile: elanza encumbrance certificate.PDF8 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
THE WAVESR NO 176 ASHTVINAYAK COLONY WAKAD PUNE 41105755CompletedMar 2019Mar 2019

How this compares with Pune

46%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELANZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmELANZACompleted 146Lapsed / revoked 53Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 282 registered projects within 2 km.

Builder: SANTOSH MARIBA BAGADI

SANTOSH MARIBA BAGADI has 2 registrations on MahaRERA, including THE WAVE and ELANZA. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ELANZA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ELANZA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELANZA?

The registered promoter entity is SANTOSH MARIBA BAGADI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELANZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ELANZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELANZA?

The professionals named in the filing: Architect: SHAMAL KAVATHKAR; Engineer: Ganesh Deshmukh; Engineer: PALASH RAJAN SHINDE; Engineer: SWAPNIL LADKAT; Chartered Accountant: HMA & Associates FRN 100537W CA Eshan P. Porwal Partner M. No. 195835; Chartered Accountant: Rakesh Parmar & company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELANZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELANZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELANZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.