EKDANT POOJA CHSL

By LANDMARK INFRA

RG-MH-53970 · RERA P51700046891 · Last updated on MahaRERA portal: 27 Feb 2026

Source: official MahaRERA filing

Red flags

  • Possession 3 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
27 of 27Construction stages doneacross 3 buildings; every applicable stage filed complete
63 of 147Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

EKDANT POOJA CHSL is a Residential / Group Housing project by LANDMARK INFRA in Thane, Maharashtra, registered with MahaRERA as P51700046891 on 16 Sep 2022. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 84 of the 147 units on this registration are recorded sold or booked, and 27 of 27 construction stages are filed complete.

At a glance

Project

  • NameEKDANT POOJA CHSL
  • TypeResidential / Group Housing
  • Location
    • KULGAON
    • BADLAPUR EAST
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700046891
  • ReraGenie IDRG-MH-53970

Builder

  • NameLANDMARK INFRA
  • Entity typePartnership
  • PartnersRAJENDRA EKNATH PATIL, AMOL GAURUNATH ALSHI, AYUSH AMOL ALSHI
  • Other registrations6 more →
  • Completed4 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

3 months past promisethis monthRegisteredSep 2022PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Sep 2022
  • Promised completion31 Jul 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed70 files

Current status

57%84 of 147 units booked
100.0%Work done, per cost certificate

Figures as on 27 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EKDANT POOJA CHSL A WINGNA9742042
EKDANT POOJA CHSL B WINGNA9749049
EKDANT POOJA CHSL C WINGNA9756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 27 construction stages are filed complete across 3 buildings.

EKDANT POOJA CHSL A WING100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
EKDANT POOJA CHSL B WING100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
EKDANT POOJA CHSL C WING100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Open Space45
BuildingOpen SpaceTotal
EKDANT POOJA CHSL A WING1515
EKDANT POOJA CHSL B WING1515
EKDANT POOJA CHSL C WING1515

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,620 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Nov 2025
LandownerVillageDistrict
KONDIRAM NANAJI SHINGAREBadlapur (M Cl)Thane
ASHOK NATHAJI SHINDEBadlapur (M Cl)Thane
GANESH MAHESHWAR PARSEKARBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL COUNCIL
Permissible FSI7127.45
Proposed, not sanctioned7,127 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCOMMERCIAL PREMISES 1 A WING MANDAVKAR COMPLEX SANEWADI BADLAPUR WEST
Estimated costRs 25.11 cr
Cost incurredRs 25.11 cr
Work done100.0%
BuildingWingEstimatedIncurred
EKDANT POOJA CHSL C WINGNARs 9.87 crRs 9.87 cr
EKDANT POOJA CHSL B WINGNARs 7.48 crRs 7.48 cr
EKDANT POOJA CHSL A WINGNARs 7.01 crRs 7.01 cr
-NARs 75.00 lakhRs 75.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE DESIGNERS
EngineerSAAD CONSULTANT
EngineerDARSHAN A KASTURE
Chartered AccountantM N JAIN & CO
Chartered AccountantRAVIRAJ B DANGE AND ASSOCIATES
PartnerRole in project
LANDMARK INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A.pdf27 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf5 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf5 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf5 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf29 Nov 2025
Withdrawal Update Form 2File: FORM 2_11zon.pdf29 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Landmark Infra.pdf17 Sep 2025
Form 1File: FORM 1.pdf8 Aug 2025
Form 2File: FORM 2.pdf8 Aug 2025
Form 3File: Form 3 Landmark Infra.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf8 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure sold - unsold Land Mark Infra.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE- Q3.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 landmark_11zon (1).pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: LANDMARK INFRA FORM 5.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Rera.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Rera.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate landmark .pdf23 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory .pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Landmark Infra_11zon.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_11zon.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dec23_11zon.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate dec23 .pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_11zon.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure Mar 23 landmark .pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Jun 23 Landmark .pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sept 23 Landmark .pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Dec 23 Landmark .pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate landmark infra.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Architect Certificate_11zon.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture certificate Landmark Infra.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE JUN 23_11zon.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Landmark Infra.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Landmark Infra-11zon.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA AUDIT FORM 5 MAR23.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate- Landmark Infra 3_11zon.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate- Landmark Infra_11zon.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Landmark Infra (3)_11zon.pdf12 May 2023
Proforma of Allotment letterFile: New_draft-Ekdant_Pooja.pdf6 Sep 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION LETTER-AFS.pdf6 Sep 2022
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCRUMBANCES.pdf23 Aug 2022
Details of encumbrances concerned to LegalFile: LEGAL ENCRUMBANECS.pdf23 Aug 2022
Proforma of Allotment letterFile: Allotment letter format_11zon.pdf23 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf23 Aug 2022
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT TO ALLOTMENT LETTER.pdf23 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_200243306888_For_Asset_Based_Search_27_07_2022_19_21_56_548.pdf27 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_11zon.pdf27 Jul 2022
Layout approvalFile: LAYOUT PLAN-2.pdf16 Jul 2022
Building plan approvalFile: PLAN-1.pdf16 Jul 2022
PAN CardFile: company PAN.pdf16 Jul 2022
Copy of the legal title reportFile: TITLE REPORT.pdf16 Jul 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN-2.pdf16 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN-1.pdf16 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf16 Jul 2022
Declaration about Commencement CertificateFile: Declaration About Commencement certificate.pdf16 Jul 2022
Declaration in FORM BFile: FORM B BUILDER.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf16 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf16 Jul 2022

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKDANT POOJA CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR EAST7,600+ in Thane

Builder: LANDMARK INFRA

Landmark infra has 7 registrations on MahaRERA, including SHIV NAKSHATRA and Madhura Sai Samrudhi. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if EKDANT POOJA CHSL is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKDANT POOJA CHSL?

The registered promoter entity is LANDMARK INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKDANT POOJA CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKDANT POOJA CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKDANT POOJA CHSL?

The professionals named in the filing: Architect: SPACE DESIGNERS; Engineer: SAAD CONSULTANT; Engineer: DARSHAN A KASTURE; Chartered Accountant: M N JAIN & CO; Chartered Accountant: RAVIRAJ B DANGE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKDANT POOJA CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKDANT POOJA CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKDANT POOJA CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.