Completed Litigation declared Others project

EKA

By KUMBARE MATHWAD ASSOCIATES

RG-MH-12549 · RERA P52100004116 · Last updated on MahaRERA portal: 21 Feb 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 72 months
  • 4 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
24 of 94Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

EKA is a Others project by KUMBARE MATHWAD ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100004116 on 8 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 72 months from the original filing. 70 of the 94 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameEKA
  • TypeOthers
  • Location
    • SHRIKANT THAKARE ROAD
    • KOTHRUD
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004116
  • ReraGenie IDRG-MH-12549

Builder

  • NameKUMBARE MATHWAD ASSOCIATES
  • Entity typeOthers
  • PartnersDAMODAR NAMDEV KUMBARE, SANJAY DAMODAR KUMBARE, MAHESH ASHOK MATHWAD, RAKESH ASHOK MATHWAD
  • Named personsMAHESH MATHWAD, RAKESH ASHOK MATHWAD, SANJAY KUMBARE, ASHISH KUMBARE

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 21 Dec 2020)
  • Buildings1 building record
  • Documents filed121 files

Current status

74%70 of 94 units booked
100.0%Work done, per cost certificate

Figures as on 21 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EKANA272388694

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

EKA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed340

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots340
Closed/Covered340

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,743 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Dec 2025
LandownerVillageDistrict
SANJAY KUMBAREPune (M Corp.)Pune
MAHESH MATHWADPune (M Corp.)Pune
DAMODAR KUMBAREPune (M Corp.)Pune
KISHOR MATHWADPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI9415.97
Proposed, not sanctioned5,544 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchASHISH PLAZA SHASTRI NAGAR D P ROAD KOTHRUD PUNE 38
Estimated costRs 58.09 cr
Cost incurredRs 58.12 cr
Work done100.05%
BuildingWingEstimatedIncurred
EKANARs 55.85 crRs 55.88 cr
-NARs 2.24 crRs 2.24 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY AERAM ARCHITECT AERAM
EngineerJ W CONSULTANT LLP jadhav
Chartered AccountantDCRK AND ASSOCIATES
PartnerRole in project
KUMBARE MATHWAD ASSOCIATES-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100008733Dec 2020 → Dec 2021

Reason as filed by the promoterOur Project is almost 95 % Completed. However full completion is delayed due to 'Shortage of Labour mainly due to Global Pandemic. Now Slowly Labours are coming back and work is going in full swing. We need some time to complete entire project and complete handing over process.

EXT52100011980Dec 2020 → May 2023

Reason as filed by the promoterOur Project is 100% Completed and we also had received part OC. However we need further time to obtain full OC and complete society formation , handover process

EXT52100016699Dec 2020 → Dec 2025

Reason as filed by the promoterConstruction and Project Development work completed in full. All Amenities also completed and working. We also had got Part Occupancy Certificate. However Final Occupancy Certificate delayed due to legal issues between original tenants . Hence We need time for getting final OC and completing Handover Procedures

EA27122519051Dec 2020 → Dec 2026

Reason as filed by the promoterConstruction and Project Development work completed in full. All Amenities also completed and working. We also had got Part Occupancy Certificate. We also had given 100% possession to all sale customers However Final Occupancy Certificate delayed due to legal issues between original tenants . Hence We need time for getting final OC and completing Handover Procedures

Litigation declared1

CaseCourtStatus
479/2015/2015CIVIL COURT PUNEOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Mar 2023

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf21 Feb 2026
Withdrawal Update Form 3File: form 3.pdf21 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf27 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf27 Dec 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE DEC.pdf27 Dec 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE DEC.pdf27 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf27 Dec 2025
Withdrawal Update Form 3File: FORM 3.pdf27 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf8 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf8 Dec 2024
Certificates of CA (Form 3)File: KM-Form 3.pdf8 Dec 2024
Certificates of CA (Form 3)File: KM-Form 3.pdf8 Dec 2024
Certificates of CA (Form 5)File: KM-Form 5_ 23-24.pdf8 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2A ANNEXURE C.pdf8 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf8 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf8 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ANNEXURE C.pdf8 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KM-Form 5_ 23-24.pdf8 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf4 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf4 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE OCT.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE DEC.pdf4 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf4 Mar 2024
Certificates of CA (Form 3)File: FORM 3.pdf4 Mar 2024
Certificates of CA (Form 3)File: form 3.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_ F Y 2022-23.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: EKA- Sold unsold inventory- KM.pdf14 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf15 Apr 2023
Certificates of CA (Form 3)File: Form 3_compressed.pdf15 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc part 1.pdf29 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf25 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf6 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf6 Feb 2023
Certificates of CA (Form 3)File: Form 3_compressed.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kumbre Mathwad Associates - Form 5 (2019-20).pdf6 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf10 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE.pdf10 Oct 2022
Form 2AFile: FROM 2A.pdf10 Oct 2022
Certificates of CA (Form 3)File: FROM 3 KM Q2_compressed.pdf10 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 KM Q1 FY 2022 23.pdf25 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM ENG CERTIFICATE Q1 FY 22-23.pdf25 Jul 2022
Certificates of CA (Form 3)File: KM FORM 3 Q1 FY 22 23.pdf25 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARC CERTIFICATE Q4 2122.pdf25 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM ENG CER Q4 21-22_compressed.pdf25 Apr 2022
Form 2AFile: KM FORM 2A Q4 21-22_compressed.pdf25 Apr 2022
Certificates of CA (Form 3)File: KM FORM 3 Q4 21-22_compressed.pdf25 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KM Architect Certificete.pdf23 Mar 2022
Certificates of CA (Form 3)File: KM FORM 3 Q3 FY 21-22_compressed.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KM FORM 5 FY 20-21_compressed.pdf16 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf14 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf14 Dec 2021
Certificates of CA (Form 3)File: C A Certificate C.pdf14 Dec 2021
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate_compressed.pdf31 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf31 Jul 2021
Disclosure of sold/ booked inventoryFile: SOLD DECLARATION.pdf31 Jul 2021
Certificates of CA (Form 3)File: Form 3 Rera Certificate_compressed (1).pdf31 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CER Q3 2020-21_compressed.pdf20 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EKA ENG CER Q3 2020-21_compressed.pdf20 Apr 2021
Certificates of CA (Form 3)File: KM Rera Certificate Q3 FY 2020-21 (1)_compressed.pdf20 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KM ARCH CERTIFICATE Q2 20-21.pdf24 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM ENG CERTIFICATE Q2 20-21.pdf24 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM FORM 3 Q2 2021-4-6.pdf24 Nov 2020
Certificates of CA (Form 3)File: KM FORM 3 Q2 2021-1-3.pdf24 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech certificate Q2.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate March 20_compressed.pdf4 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate June 20_compressed.pdf4 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate March 20_compressed.pdf4 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate June 20_compressed.pdf4 Sep 2020
Certificates of CA (Form 3)File: KM RERA MARC 20_compressed (1).pdf4 Sep 2020
Certificates of CA (Form 3)File: KM RERA CERTIFICATE JUNE 20_compressed.pdf4 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE KM RERA DEC 19.PDF7 Feb 2020
Form 2AFile: FORM 2A KM RERA CERTIFICATE DEC 19.PDF7 Feb 2020
Certificates of CA (Form 3)File: RERA CERTIFICATE KM DEC Q3 DEC 19.PDF7 Feb 2020
Form 2AFile: FROM 2A.PDF13 Nov 2019

How this compares with Pune

74%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

Builder: KUMBARE MATHWAD ASSOCIATES

KUMBARE MATHWAD ASSOCIATES has 1 registration on MahaRERA, including EKA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EKA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKA?

The registered promoter entity is KUMBARE MATHWAD ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKA?

The professionals named in the filing: Architect: JAY AERAM ARCHITECT AERAM; Engineer: J W CONSULTANT LLP jadhav; Chartered Accountant: DCRK AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.