EKA
RG-MH-12549 · RERA P52100004116 · Last updated on MahaRERA portal: 21 Feb 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
- Completion date moved by 72 months
- 4 extensions taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EKA is a Others project by KUMBARE MATHWAD ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100004116 on 8 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 72 months from the original filing. 70 of the 94 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameEKA
- TypeOthers
- Location
- SHRIKANT THAKARE ROAD
- KOTHRUD
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100004116
- ReraGenie IDRG-MH-12549
Builder
- NameKUMBARE MATHWAD ASSOCIATES
- Entity typeOthers
- PartnersDAMODAR NAMDEV KUMBARE, SANJAY DAMODAR KUMBARE, MAHESH ASHOK MATHWAD, RAKESH ASHOK MATHWAD
- Named personsMAHESH MATHWAD, RAKESH ASHOK MATHWAD, SANJAY KUMBARE, ASHISH KUMBARE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 21 Dec 2020)
- Buildings1 building record
- Documents filed121 files
Current status
Figures as on 21 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EKA | NA | 27 | 23 | 88 | 6 | 94 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
EKA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed340
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SANJAY KUMBARE | Pune (M Corp.) | Pune |
| MAHESH MATHWAD | Pune (M Corp.) | Pune |
| DAMODAR KUMBARE | Pune (M Corp.) | Pune |
| KISHOR MATHWAD | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EKA | NA | Rs 55.85 cr | Rs 55.88 cr |
| - | NA | Rs 2.24 cr | Rs 2.24 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAY AERAM ARCHITECT AERAM |
| Engineer | J W CONSULTANT LLP jadhav |
| Chartered Accountant | DCRK AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| KUMBARE MATHWAD ASSOCIATES | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur Project is almost 95 % Completed. However full completion is delayed due to 'Shortage of Labour mainly due to Global Pandemic. Now Slowly Labours are coming back and work is going in full swing. We need some time to complete entire project and complete handing over process.
Reason as filed by the promoterOur Project is 100% Completed and we also had received part OC. However we need further time to obtain full OC and complete society formation , handover process
Reason as filed by the promoterConstruction and Project Development work completed in full. All Amenities also completed and working. We also had got Part Occupancy Certificate. However Final Occupancy Certificate delayed due to legal issues between original tenants . Hence We need time for getting final OC and completing Handover Procedures
Reason as filed by the promoterConstruction and Project Development work completed in full. All Amenities also completed and working. We also had got Part Occupancy Certificate. We also had given 100% possession to all sale customers However Final Occupancy Certificate delayed due to legal issues between original tenants . Hence We need time for getting final OC and completing Handover Procedures
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 479/2015/2015 | CIVIL COURT PUNE | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Mar 2023
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 27 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 27 Dec 2025 |
| Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE DEC.pdf | 27 Dec 2025 |
| Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE DEC.pdf | 27 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 27 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 27 Dec 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 8 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 8 Dec 2024 |
| Certificates of CA (Form 3)File: KM-Form 3.pdf | 8 Dec 2024 |
| Certificates of CA (Form 3)File: KM-Form 3.pdf | 8 Dec 2024 |
| Certificates of CA (Form 5)File: KM-Form 5_ 23-24.pdf | 8 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2A ANNEXURE C.pdf | 8 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf | 8 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf | 8 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ANNEXURE C.pdf | 8 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KM-Form 5_ 23-24.pdf | 8 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 4 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 4 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE OCT.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE DEC.pdf | 4 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: form 3.pdf | 4 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 4 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_ F Y 2022-23.pdf | 4 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: EKA- Sold unsold inventory- KM.pdf | 14 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 15 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 15 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 15 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3_compressed.pdf | 15 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc part 1.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf | 25 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf | 6 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 6 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_compressed.pdf | 6 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kumbre Mathwad Associates - Form 5 (2019-20).pdf | 6 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 10 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE.pdf | 10 Oct 2022 |
| Form 2AFile: FROM 2A.pdf | 10 Oct 2022 |
| Certificates of CA (Form 3)File: FROM 3 KM Q2_compressed.pdf | 10 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 KM Q1 FY 2022 23.pdf | 25 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM ENG CERTIFICATE Q1 FY 22-23.pdf | 25 Jul 2022 |
| Certificates of CA (Form 3)File: KM FORM 3 Q1 FY 22 23.pdf | 25 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARC CERTIFICATE Q4 2122.pdf | 25 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM ENG CER Q4 21-22_compressed.pdf | 25 Apr 2022 |
| Form 2AFile: KM FORM 2A Q4 21-22_compressed.pdf | 25 Apr 2022 |
| Certificates of CA (Form 3)File: KM FORM 3 Q4 21-22_compressed.pdf | 25 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KM Architect Certificete.pdf | 23 Mar 2022 |
| Certificates of CA (Form 3)File: KM FORM 3 Q3 FY 21-22_compressed.pdf | 16 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KM FORM 5 FY 20-21_compressed.pdf | 16 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf | 14 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf | 14 Dec 2021 |
| Certificates of CA (Form 3)File: C A Certificate C.pdf | 14 Dec 2021 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate_compressed.pdf | 31 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 31 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD DECLARATION.pdf | 31 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3 Rera Certificate_compressed (1).pdf | 31 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CER Q3 2020-21_compressed.pdf | 20 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EKA ENG CER Q3 2020-21_compressed.pdf | 20 Apr 2021 |
| Certificates of CA (Form 3)File: KM Rera Certificate Q3 FY 2020-21 (1)_compressed.pdf | 20 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KM ARCH CERTIFICATE Q2 20-21.pdf | 24 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM ENG CERTIFICATE Q2 20-21.pdf | 24 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KM FORM 3 Q2 2021-4-6.pdf | 24 Nov 2020 |
| Certificates of CA (Form 3)File: KM FORM 3 Q2 2021-1-3.pdf | 24 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech certificate Q2.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate March 20_compressed.pdf | 4 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate June 20_compressed.pdf | 4 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate March 20_compressed.pdf | 4 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate June 20_compressed.pdf | 4 Sep 2020 |
| Certificates of CA (Form 3)File: KM RERA MARC 20_compressed (1).pdf | 4 Sep 2020 |
| Certificates of CA (Form 3)File: KM RERA CERTIFICATE JUNE 20_compressed.pdf | 4 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE KM RERA DEC 19.PDF | 7 Feb 2020 |
| Form 2AFile: FORM 2A KM RERA CERTIFICATE DEC 19.PDF | 7 Feb 2020 |
| Certificates of CA (Form 3)File: RERA CERTIFICATE KM DEC Q3 DEC 19.PDF | 7 Feb 2020 |
| Form 2AFile: FROM 2A.PDF | 13 Nov 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 121 filed documents as one ZIP, foldered, with a manifest
Keep EKA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOTHRUD13,700+ in Pune
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: KUMBARE MATHWAD ASSOCIATES
KUMBARE MATHWAD ASSOCIATES has 1 registration on MahaRERA, including EKA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if EKA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EKA?
The registered promoter entity is KUMBARE MATHWAD ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EKA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EKA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EKA?
The professionals named in the filing: Architect: JAY AERAM ARCHITECT AERAM; Engineer: J W CONSULTANT LLP jadhav; Chartered Accountant: DCRK AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EKA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback