Completed No litigation declared Residential / Group Housing project

EELA Phase-I

By M/s. Siddhashila Developers

RG-MH-19722 · RERA P52100012382 · Last updated on MahaRERA portal: 28 Apr 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
60 of 66Construction stages doneacross 6 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

EELA Phase-I is a Residential / Group Housing project by M/s. Siddhashila Developers in Pune, Maharashtra, registered with MahaRERA as P52100012382 on 1 Sep 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameEELA Phase-I
  • TypeResidential / Group Housing
  • Location
    • Marunji-Punawale
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012382
  • ReraGenie IDRG-MH-19722

Builder

  • NameM/s. Siddhashila Developers
  • Entity typePartnership
  • PartnersMr Vilas Chaganlal Rathod, Mr Pritam Vilas Rathod
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredSep 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings6 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-Building / Atira-ANA180000
B-Building / Atira-BNA180000
K-Building / Parking PodiumNA40000
J-EWS Building / EWSNA140000
C-Building / Gaia-ANA180000
D-Building / Gaia-BNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 28 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.

A-Building / Atira-A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B-Building / Atira-B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
K-Building / Parking Podium91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
J-EWS Building / EWS91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C-Building / Gaia-A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D-Building / Gaia-B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities21

As on 28 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Club HouseYes100%
Compound WallYes100%
Gas BankYes100%
Security CabinYes100%
Swimming Pool with Kids PoolYes100%
Under Ground Water TankYes100%

Parking filed589

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots589
Closed/Covered572
Open Space17
BuildingClosed/CoveredOpen SpaceTotal
A-Building / Atira-A281139
B-Building / Atira-B29029
K-Building / Parking Podium4490449
J-EWS Building / EWS25025
C-Building / Gaia-A21223
D-Building / Gaia-B20424

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,821 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Mr. Vilas Chaganlal RathodPune (M Corp.)Pune
Mrs. Shubhada Santosh SubhedarPune (M Corp.)Pune

Approvals and building plan

Permissible FSI25580.05
Proposed, not sanctioned25,580 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort Mumbai

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhikalpan Architects & Planners
PartnerRole in project
M/s. Siddhashila Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001332Dec 2018 → Dec 2019

Reason as filed by the promoterIn view of the construction work completed by our esteemed firm, we were sure of receiving payments amounting to Rs 12 crore after completion of J Building (MHADA - EWS) project. Likewise and in compliance of the regulations set up by competent authorities, we obtained completion certificate of J Building (MHADA) on 17/07/2018 so as to receive the necessary payment due upon MHADA to our firm. We were anticipating the clearance of payment due to us from MHADA till September, 2018. And hence intended to complete the Phase-I construction of the present project till December 2018 with the help of

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Dec 2019

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: EX NA Order Finel.pdf28 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: N A Order from callecter office.pdf28 Apr 2023
Declaration about Commencement CertificateFile: SCAN_20210813_124449710.pdf13 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 27-03-21 Phase-I_compressed.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 29-06-21 Phase-I_compressed.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Phase I 2019-20.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A)File: SCAN_20200114_173020626_compressed.pdf14 Jan 2020
Architect’s Certificate on Completion of Project (Form 4)File: COMPLETION-CERTIFICATE-080219.PDF1 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion Phase 1.pdf30 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate of K - Parking Building.pdf30 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Phase I.pdf30 Nov 2019
Engineers Certificate on Quality Assurance (Form 2A)File: SCAN_20190822_122545184_compressed.pdf21 Oct 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate ATIRA.pdf15 Oct 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate GAYA.pdf15 Oct 2019
OtherFile: Madhuban J-Building Completion Certificate.pdf25 Jul 2019
OtherFile: Completion Phase -I.pdf25 Jul 2019
Certificates of CA (Form 5)File: Form 5 - Phase I.pdf7 Jan 2019
Proforma of Allotment letterFile: RERA Agreement Phase I-.pdf20 Dec 2017
Building plan approvalFile: Plan1-38.pdf18 Dec 2017
Building Plan Approval (IOD)File: Plan1-38.pdf18 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: eela new CC.pdf18 Dec 2017
Layout approvalFile: Layout plan Copy 31-3-2017-ilovepdf-compressed.pdf28 Jul 2017
Building plan approvalFile: Layout plan Copy 31-3-2017.pdf28 Jul 2017
PAN CardFile: PAN_ Siddhashila Developers.pdf28 Jul 2017
Copy of the legal title reportFile: Title Report.pdf28 Jul 2017
Details of encumbrancesFile: Mortgage Deed Index II.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout plan Copy 31-3-2017-ilovepdf-compressed.pdf28 Jul 2017
Building Plan Approval (IOD)File: Layout plan Copy 31-3-2017.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Jul 2017
Declaration in FORM BFile: Declaration SD (Phase 01).pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase-I.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate PH-I.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Phase I.pdf28 Jul 2017
Proforma of Allotment letterFile: Agreement For Sale Phase-I Eela PDF.pdf28 Jul 2017
Proforma of Allotment letterFile: Booking Form.pdf28 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EELA Phase-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawale13,700+ in Pune

2 kmEELA Phase-ICompleted 162Lapsed / revoked 119Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 434 registered projects within 2 km.

Builder: M/s. Siddhashila Developers

M/s. Siddhashila Developers has 3 registrations on MahaRERA, including EELA Phase-I and EELA Phase-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EELA Phase-I is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EELA Phase-I?

The registered promoter entity is M/s. Siddhashila Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EELA Phase-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EELA Phase-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EELA Phase-I?

The professionals named in the filing: Architect: Abhikalpan Architects & Planners. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EELA Phase-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EELA Phase-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EELA Phase-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.