ECO VALLEY PLUS
RG-MH-26436 · RERA P52100016509 · Last updated on MahaRERA portal: 20 Jan 2024
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ECO VALLEY PLUS is a Residential / Group Housing project by NAMRATA JALAN VENTURES in Pune, Maharashtra, registered with MahaRERA as P52100016509 on 18 May 2018. The registration is recorded completed; possession was promised by 30 Apr 2022.
At a glance
Project
- NameECO VALLEY PLUS
- TypeResidential / Group Housing
- Location
- Kanhe
- Mawal
- Pune
- 412106
- Pincode412106
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100016509
- ReraGenie IDRG-MH-26436
Builder
- NameNAMRATA JALAN VENTURES
- Entity typePartnership
- PartnersDEEPAK KANTILAL SHAH, SHAILESH KANTILAL SHAH, DWARKAPRASAD NARAYAN JALAN
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 May 2018
- Promised completion30 Apr 2022
- Revised completionNone
- Buildings5 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C1-C2 | NA | 27 | 0 | 0 | 0 | 0 |
| C3-C4 | NA | 31 | 0 | 0 | 0 | 0 |
| D3-D4 | NA | 19 | 0 | 0 | 0 | 0 |
| D5-D6 | NA | 30 | 0 | 0 | 0 | 0 |
| D7-D8 | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 20 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
C1-C291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C3-C491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D3-D491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D5-D691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D7-D891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed131
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| C1-C2 | 20 | 18 | 38 |
| C3-C4 | 24 | 18 | 42 |
| D3-D4 | 12 | 0 | 12 |
| D5-D6 | 23 | 0 | 23 |
| D7-D8 | 16 | 0 | 16 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCON |
| Partner | Role in project |
|---|---|
| NAMRATA JALAN VENTURES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur work is 100% completed on site but the process of completion from PMRDA is taking time so that we are applying for the extension of our residential project"Eco Valley Plus" [Maharera No-P52100016509]
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Nov 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Nov 2022
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NJV Form 5 FY 22_23.pdf | 20 Jan 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Eco valley plus form 4_02022023.pdf | 2 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 -ECO VALLEY PLUS FY 21-22.pdf | 23 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Arch_Sept 2022.pdf | 26 Nov 2022 |
| Certificates of CA (Form 3)File: Eco Valley Plus CA Certificate_Sept 2022.pdf | 26 Nov 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Eco vally Plus Compliation Certificate C1to C4 D3 to D8.pdf | 26 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Arch June 2022.pdf | 17 Aug 2022 |
| Declaration about Commencement CertificateFile: NJV Format D .pdf | 28 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Eco Valley Plus Inventory Disclosure.pdf | 28 Apr 2022 |
| Certificates of CA (Form 3)File: Eco Valley Plus CA Certificate_March 2022.pdf | 28 Apr 2022 |
| Building plan approvalFile: Plan_01.pdf | 27 Apr 2022 |
| Building Plan Approval (IOD)File: Plan_01.pdf | 27 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate PMRDA_2017.pdf | 27 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate.pdf | 27 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate.pdf | 27 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NJV Architect cert_MArch 2022.pdf | 21 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Eco Valley Plus.pdf | 28 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Architec Cert_Sept 2021_compressed.pdf | 9 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NJV Engineers Certificate _compressed.pdf | 24 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus_June 2021.pdf | 8 Jul 2021 |
| Certificates of CA (Form 3)File: Eco Valley Plus_CA Certificate March 2021.pdf | 29 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Vally Plus Architect Certificate 31 march 2021.pdf | 15 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Eco Valley Plus Form 5 FY 2019-20.pdf | 8 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Arch cert_Dec 2020.pdf | 22 Jan 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eco valley Plus Engg certificate_Dec 2020.pdf | 22 Jan 2021 |
| Certificates of CA (Form 3)File: Eco Valley Plus CA Certificate_Dec 2020.pdf | 22 Jan 2021 |
| Certificates of CA (Form 3)File: Eco valley CA Dec 2019.pdf | 24 Jan 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Eco Valley.pdf | 13 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Form 5 Final.pdf | 31 Oct 2019 |
| Certificates of CA (Form 3)File: RERA CERTIFICATE ECO VALLEY PLUS Q1_compressed.pdf | 23 Oct 2019 |
| Certificates of CA (Form 3)File: RERA CERTIFICATE ECO VALLEY PLUS Q2_compressed.pdf | 23 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2018.pdf | 16 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 2018.pdf | 16 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 2018.pdf | 16 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2019.pdf | 16 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2019.pdf | 16 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 2019.pdf | 16 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: ECO VALLEY FORM 5 RERA - AS ON 31032019 - SIGNED.pdf | 15 Oct 2019 |
| Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE- Q1_compressed.pdf | 10 Oct 2019 |
| Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE -Q2_compressed.pdf | 10 Oct 2019 |
| Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE -Q3_compressed.pdf | 10 Oct 2019 |
| Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE -Q4_compressed.pdf | 10 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: ECO VALLEY PLUS (NJV) FORM 5.pdf | 10 Oct 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: eco vally plus complication certificate .pdf | 23 Sep 2019 |
| Copy of the legal title reportFile: Title and Search Report - Eco Valley Phase II.pdf | 5 May 2018 |
| Certificates of CA (Form 3)File: Eco Valley Plus PH II - CA Certificate_RERA.pdf | 5 May 2018 |
| Layout approvalFile: Eco valley plus - SANCTION PLAN.pdf | 2 Nov 2017 |
| Building plan approvalFile: Eco valley plus - SANCTION PLAN.pdf | 2 Nov 2017 |
| PAN CardFile: NJV - PAN CARD.pdf | 2 Nov 2017 |
| Details of encumbrancesFile: DECLARATION - NJV.pdf | 2 Nov 2017 |
| Copy of Layout Approval (in case of layout)File: Eco valley plus - SANCTION PLAN.pdf | 2 Nov 2017 |
| Building Plan Approval (IOD)File: Eco valley plus - SANCTION PLAN.pdf | 2 Nov 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: ECO VALLEY PLUS - NA.pdf | 2 Nov 2017 |
| Declaration in FORM BFile: Form B - ECO VALLEY PULS.pdf | 2 Nov 2017 |
| Proforma of Allotment letterFile: AGREEMENT TO SELL - Eco valley PLUS.pdf | 2 Nov 2017 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER - BOOKING LETTER.pdf | 2 Nov 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep ECO VALLEY PLUS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kanhe13,700+ in Pune
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
Residential Building on CTS No 107/1P -GIRIVAR
SHRIVAR BUILDERS LLP
Aranya
Naiknavare Township LLP.
Land of Dreams
Krisala Buildscape LLP
Mount Vista
Tirupati Lands and Building Constructions
Osian LifeLands 2
Planet-i Realty
RKL INDRAYANI CITY
R K LUNKAD HOUSING COMPANY
Builder: NAMRATA JALAN VENTURES
NAMRATA JALAN VENTURES has 1 registration on MahaRERA, including ECO VALLEY PLUS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ECO VALLEY PLUS is delayed beyond 30 Apr 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ECO VALLEY PLUS?
The registered promoter entity is NAMRATA JALAN VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ECO VALLEY PLUS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ECO VALLEY PLUS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ECO VALLEY PLUS?
The professionals named in the filing: Architect: ARCON. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ECO VALLEY PLUS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback