Home / Browse projects / Pune, Maharashtra / ECO VALLEY PLUS

Completed No litigation declared Residential / Group Housing project

ECO VALLEY PLUS

By NAMRATA JALAN VENTURES

RG-MH-26436 · RERA P52100016509 · Last updated on MahaRERA portal: 20 Jan 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2022Possession promisedregistration recorded completed
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

ECO VALLEY PLUS is a Residential / Group Housing project by NAMRATA JALAN VENTURES in Pune, Maharashtra, registered with MahaRERA as P52100016509 on 18 May 2018. The registration is recorded completed; possession was promised by 30 Apr 2022.

At a glance

Project

  • NameECO VALLEY PLUS
  • TypeResidential / Group Housing
  • Location
    • Kanhe
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016509
  • ReraGenie IDRG-MH-26436

Builder

  • NameNAMRATA JALAN VENTURES
  • Entity typePartnership
  • PartnersDEEPAK KANTILAL SHAH, SHAILESH KANTILAL SHAH, DWARKAPRASAD NARAYAN JALAN

Key dates

this monthRegisteredMay 2018PromisedApr 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 May 2018
  • Promised completion30 Apr 2022
  • Revised completionNone
  • Buildings5 building records
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C1-C2NA270000
C3-C4NA310000
D3-D4NA190000
D5-D6NA300000
D7-D8NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 20 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

C1-C291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C3-C491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D3-D491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D5-D691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D7-D891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed131

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots131
Closed/Covered95
Open Space36
BuildingClosed/CoveredOpen SpaceTotal
C1-C2201838
C3-C4241842
D3-D412012
D5-D623023
D7-D816016

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area25,933 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI23481.33
Proposed, not sanctioned23,481 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON DABHADE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCON
PartnerRole in project
NAMRATA JALAN VENTURES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011785Apr 2022 → Sep 2022

Reason as filed by the promoterOur work is 100% completed on site but the process of completion from PMRDA is taking time so that we are applying for the extension of our residential project"Eco Valley Plus" [Maharera No-P52100016509]

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Nov 2022

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NJV Form 5 FY 22_23.pdf20 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: Eco valley plus form 4_02022023.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 -ECO VALLEY PLUS FY 21-22.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Arch_Sept 2022.pdf26 Nov 2022
Certificates of CA (Form 3)File: Eco Valley Plus CA Certificate_Sept 2022.pdf26 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Eco vally Plus Compliation Certificate C1to C4 D3 to D8.pdf26 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Arch June 2022.pdf17 Aug 2022
Declaration about Commencement CertificateFile: NJV Format D .pdf28 Apr 2022
Disclosure of sold/ booked inventoryFile: Eco Valley Plus Inventory Disclosure.pdf28 Apr 2022
Certificates of CA (Form 3)File: Eco Valley Plus CA Certificate_March 2022.pdf28 Apr 2022
Building plan approvalFile: Plan_01.pdf27 Apr 2022
Building Plan Approval (IOD)File: Plan_01.pdf27 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate PMRDA_2017.pdf27 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate.pdf27 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate.pdf27 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NJV Architect cert_MArch 2022.pdf21 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Eco Valley Plus.pdf28 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Architec Cert_Sept 2021_compressed.pdf9 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NJV Engineers Certificate _compressed.pdf24 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus_June 2021.pdf8 Jul 2021
Certificates of CA (Form 3)File: Eco Valley Plus_CA Certificate March 2021.pdf29 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Vally Plus Architect Certificate 31 march 2021.pdf15 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Eco Valley Plus Form 5 FY 2019-20.pdf8 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eco Valley Plus Arch cert_Dec 2020.pdf22 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eco valley Plus Engg certificate_Dec 2020.pdf22 Jan 2021
Certificates of CA (Form 3)File: Eco Valley Plus CA Certificate_Dec 2020.pdf22 Jan 2021
Certificates of CA (Form 3)File: Eco valley CA Dec 2019.pdf24 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Eco Valley.pdf13 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Form 5 Final.pdf31 Oct 2019
Certificates of CA (Form 3)File: RERA CERTIFICATE ECO VALLEY PLUS Q1_compressed.pdf23 Oct 2019
Certificates of CA (Form 3)File: RERA CERTIFICATE ECO VALLEY PLUS Q2_compressed.pdf23 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2018.pdf16 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 2018.pdf16 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 2018.pdf16 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2019.pdf16 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2019.pdf16 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 2019.pdf16 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: ECO VALLEY FORM 5 RERA - AS ON 31032019 - SIGNED.pdf15 Oct 2019
Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE- Q1_compressed.pdf10 Oct 2019
Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE -Q2_compressed.pdf10 Oct 2019
Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE -Q3_compressed.pdf10 Oct 2019
Certificates of CA (Form 3)File: Eco Valley Plus_RERA CERTIFICATE -Q4_compressed.pdf10 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: ECO VALLEY PLUS (NJV) FORM 5.pdf10 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: eco vally plus complication certificate .pdf23 Sep 2019
Copy of the legal title reportFile: Title and Search Report - Eco Valley Phase II.pdf5 May 2018
Certificates of CA (Form 3)File: Eco Valley Plus PH II - CA Certificate_RERA.pdf5 May 2018
Layout approvalFile: Eco valley plus - SANCTION PLAN.pdf2 Nov 2017
Building plan approvalFile: Eco valley plus - SANCTION PLAN.pdf2 Nov 2017
PAN CardFile: NJV - PAN CARD.pdf2 Nov 2017
Details of encumbrancesFile: DECLARATION - NJV.pdf2 Nov 2017
Copy of Layout Approval (in case of layout)File: Eco valley plus - SANCTION PLAN.pdf2 Nov 2017
Building Plan Approval (IOD)File: Eco valley plus - SANCTION PLAN.pdf2 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: ECO VALLEY PLUS - NA.pdf2 Nov 2017
Declaration in FORM BFile: Form B - ECO VALLEY PULS.pdf2 Nov 2017
Proforma of Allotment letterFile: AGREEMENT TO SELL - Eco valley PLUS.pdf2 Nov 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER - BOOKING LETTER.pdf2 Nov 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ECO VALLEY PLUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kanhe13,700+ in Pune

2 kmECO VALLEY PLUSCompleted 9Lapsed / revoked 8Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: NAMRATA JALAN VENTURES

NAMRATA JALAN VENTURES has 1 registration on MahaRERA, including ECO VALLEY PLUS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ECO VALLEY PLUS is delayed beyond 30 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ECO VALLEY PLUS?

The registered promoter entity is NAMRATA JALAN VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ECO VALLEY PLUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ECO VALLEY PLUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ECO VALLEY PLUS?

The professionals named in the filing: Architect: ARCON. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ECO VALLEY PLUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ECO VALLEY PLUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ECO VALLEY PLUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.