Damji Shamji Corporate Square - Wing C
RG-MH-28147 · RERA P51800025317 · Last updated on MahaRERA portal: 11 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 2 extensions taken
- Rs 120.00 crore secured on the land, in favour of JM Financial Credit Solutions Limited
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Damji Shamji Corporate Square - Wing C is a Commercial project by Coronate Constructions in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800025317 on 10 Apr 2020. Possession is promised by 30 Dec 2026. The completion date has moved by 24 months from the original filing. 183 of the 194 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameDamji Shamji Corporate Square - Wing C
- TypeCommercial
- Location
- Pant Nagar
- Ghatkopar East
- Kurla
- Mumbai Suburban
- 400075
- Pincode400075
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800025317
- ReraGenie IDRG-MH-28147
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Apr 2020
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed155 files
Current status
Figures as on 11 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Damji Shamji Corporate Square - Wing C | NA | 13 | 10 | 0 | 194 | 194 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 100%.
Damji Shamji Corporate Square - Wing C: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed224
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Damji Shamji Corporate Square - Wing C | NA | Rs 25.00 cr | Rs 34.88 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Daisaria Associates |
| Engineer | Ashok Bhanushali |
| Chartered Accountant | Samir Damji Malde |
| Chartered Accountant | S.D.Malde & Co. |
| Chartered Accountant | NITIN MEGHJI MARU |
| Partner | Role in project |
|---|---|
| Coronate Constructions | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have already obtained Occupation certificate for the said building uptill 9th floor. Extension is only for the 10th floor, being pendency on the completion of layout conditions which is in process. The same pending documentations are anticipated to get over at the earliest for successfully obtaining the OCCUPATION CERTIFICATE for the Last Pending Floor.
Reason as filed by the promoterWe have acquired the development rights vide a Development Agreement in respect of the property falling under the purview of the said project. Pursuant thereto, we have completed the construction of our project comprising of 10 floors and have obtained the Part Occupation Certificate (for short, “OC”) up to 9 floors. We would also like to further state that premises on the 10th floor in our project are ready for occupation and possession in all respects but however, the OC is yet to be issued due to technical reasons viz. pendency of compliance of layout conditions by the owner of the land. In
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Mar 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Mar 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Mar 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Dec 2024
Documents filed155
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 155 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Corporate Square - C Wing.pdf | 11 Aug 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 11 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 27 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 27 Jun 2026 |
| Withdrawal Update Form 3File: Form 3_compressed.pdf | 27 Jun 2026 |
| Withdrawal Update Form 1File: Coronate Form 1.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Coronate Form 2.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Coronate Form 3.pdf | 4 Feb 2026 |
| Form 2A (FY 2024-2025)File: C Wing Form 2_001.pdf | 10 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 20 Dec 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 20 Dec 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 20 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 3 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 3 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 3 Oct 2025 |
| Form 1File: Architect Certificate.pdf | 4 Jul 2025 |
| Form 2File: Engineer Certificate.pdf | 4 Jul 2025 |
| Form 3File: CA Certificate.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf | 4 Jul 2025 |
| Form 1File: Architect Certificate.pdf | 4 Jul 2025 |
| Form 2File: Engineer Certificate.pdf | 4 Jul 2025 |
| Form 3File: CA Certificate.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf | 4 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 19 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 19 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 19 May 2025 |
| CERSAI detailsFile: Cersai Report.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 16 Jan 2025 |
| CERSAI detailsFile: CERSAI Report.pdf | 16 Jan 2025 |
| Declaration in FORM BFile: Form B.pdf | 19 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Damji Shamji Corporate Square C Wing - Part OC.pdf | 17 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect Certificate.pdf | 17 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 17 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (2023-2024).pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 25 Oct 2024 |
| CERSAI detailsFile: CERSAI Report.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 22 Jul 2024 |
| CERSAI detailsFile: CERSAI Report.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 16 Apr 2024 |
| CERSAI detailsFile: CERSAI Report.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 16 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 16 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (2022-2023).pdf | 10 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 11 Jan 2024 |
| CERSAI detailsFile: CERSAI Report.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 11 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 11 Jan 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale Corporate Square C wing.pdf | 2 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 13 Oct 2023 |
| CERSAI detailsFile: CERSAI Report.pdf | 13 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 13 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 19 Jul 2023 |
| CERSAI detailsFile: CERSAI Report.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 27 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 27 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 27 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 11 Apr 2023 |
| CERSAI detailsFile: CERSAI Report.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 30 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020 -2021.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 12 Jan 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Damji Shamji Corporate Square - A Wing | Pant Nagar Ghatkopar East Mumbai - 400075 | 59 | Completed | May 2019 | Aug 2018 |
| Damji Shamji Corporate Square - B Wing | Pant Nagar Ghatkopar East Mumbai 400075 | 151 | Completed | Jun 2012 | Late, Jun 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 155 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Damji Shamji Corporate Square - Wing C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ghatkopar East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 266 registered projects within 2 km.
THE VIEWS
AGNEL DEVELOPERS
THE VIEWS II
AGNEL DEVELOPERS
Drushti Emerald
SAMARTH DRUSHTI DEVELOPERS
East Syde
VL GAJAMUKH DEVELOPERS LLP
ROYAL ALTEZZA
SHRI GANESH DEVELOPERS
Samarpan
HS Construction
See every Mumbai Suburban project, with the district possession charts
Builder: Coronate Constructions
Coronate Constructions has 2 registrations on MahaRERA, including Damji Shamji Corporate Square - A Wing and Damji Shamji Corporate Square - Wing C. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Damji Shamji Corporate Square - Wing C is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Damji Shamji Corporate Square - Wing C?
The registered promoter entity is Coronate Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Damji Shamji Corporate Square - Wing C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Damji Shamji Corporate Square - Wing C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Damji Shamji Corporate Square - Wing C?
The professionals named in the filing: Architect: Daisaria Associates; Engineer: Ashok Bhanushali; Chartered Accountant: Samir Damji Malde; Chartered Accountant: S.D.Malde & Co.; Chartered Accountant: NITIN MEGHJI MARU. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Damji Shamji Corporate Square - Wing C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback