Home / Browse projects / Thane, Maharashtra / EAGLERIDGE WING A

Completed No litigation declared Residential / Group Housing project

EAGLERIDGE WING A

By ROMA BUILDERS PRIVATE LIMITED

RG-MH-56767 · RERA P51700019923 · Last updated on MahaRERA portal: 6 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 28 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

EAGLERIDGE WING A is a Residential / Group Housing project by ROMA BUILDERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700019923 on 13 Mar 2019. The registration is recorded completed; possession was promised by 30 Jul 2025.

At a glance

Project

  • NameEAGLERIDGE WING A
  • TypeResidential / Group Housing
  • Location
    • WOOD STREET
    • PATLIPADA
    • HIRANANDANI ESTATE
    • OFF GHODBUNDER ROAD
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019923
  • ReraGenie IDRG-MH-56767

Builder

  • NameROMA BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorNiranjan L Hiranandani
  • Other registrations28 more →
  • Completed28 of 29
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2019PromisedJul 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Mar 2019
  • Promised completion30 Jul 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed115 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EAGLERIDGE WING ANA380000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

EAGLERIDGE WING A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed137

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots137
Closed/Covered137

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area413 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8166.74
Proposed, not sanctioned8,117 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGalleria, Hiranandani Gardens, Powai, Mumbai - 400076

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs. Sharmistha Mukerjee
EngineerEr. Cyrus Pithawalla
EngineerEr. Prahsant A. Tarmale
Chartered AccountantS H PATRAWALA & CO
Chartered AccountantP B DESAI & CO
PartnerRole in project
ROMA BUILDERS PRIVATE LIMITED-

Litigation declared3

CaseCourtStatus
715/2013CIVIL JUDGE SR DIVISION THANE AT THANEPENDING
746/2008CIVIL JUDGE SR DIVISION THANE AT THANEDisposed Off
667/2017CIVIL JUDGE SR DIVISION THANE AT THANEPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 May 2022

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: RBPL EAGLERIDGE WING A INVENTORY UPDATE 30092023.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: EAGLERIDGE A.pdf29 Aug 2023
Disclosure of sold/ booked inventoryFile: RBPL EAGLERIDGE WING A INVENTORY UPDATE 31032023.pdf4 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc Regn Cert Eagleridge A and B.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: RBPL EAGLERIDGE WING A INVENTORY UPDATE 31122022.pdf5 Jan 2023
Disclosure of sold/ booked inventoryFile: Eagleridge Wing A Inventory Update 30092022.pdf10 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Eagleridge A Form V.pdf1 Oct 2022
Annual Audit Report of Statutory CA (Form 5)File: Eagleridge A Form V.pdf19 Sep 2022
Other - FinanceFile: Eagleridge A Form V.pdf19 Sep 2022
Status of ConveyanceFile: Conveyance Letter Update Eagleridge Wing A 250722.pdf25 Jul 2022
Disclosure of sold/ booked inventoryFile: Eagleridge Wing A Thane Inventory update 30062022.pdf12 Jul 2022
OtherFile: Eagleridge A RERA Account Closure.pdf6 Jun 2022
OtherFile: Layout.pdf2 Jun 2022
OtherFile: Stilt and First Floor A wing.pdf2 Jun 2022
OtherFile: Typical and Refuge Floor A wing.pdf2 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 OC final Eagleridge A.pdf30 May 2022
Certificates of CA (Form 3)File: Eagleridge A CA certificate OC Final.pdf27 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eagleridge Wing A OC final.pdf26 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Eagleridge OC.pdf26 May 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Eaglridge Wing A.pdf26 May 2022
Disclosure of sold/ booked inventoryFile: Eagleridge Wing A Thane Inventory Update 31032022.pdf19 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EAGLERIDGE A.pdf7 Apr 2022
Form 2AFile: EAGLERIDGE A FORM 2A.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eagleridge A.pdf6 Apr 2022
Certificates of CA (Form 3)File: Eagleridge A CA.pdf6 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: RERA letter status of AOA Eagleridge Wing A 240122.pdf24 Jan 2022
Disclosure of sold/ booked inventoryFile: Eagleridge A Inventory as on 31122021 C.pdf10 Jan 2022
Certificates of CA (Form 3)File: Eagleridge A CA certificate.pdf4 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eagleridge A.pdf3 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EAGLERIDGE A.pdf3 Jan 2022
Form 2AFile: FORM 2A Eagleridge A.pdf3 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Eagleridge Wing A - RERA Letter.pdf29 Dec 2021
Details of encumbrancesFile: RBPL CERSAI CERTIFICATE and REPORT.pdf26 Oct 2021
Disclosure of sold/ booked inventoryFile: Rera Eagleridge A.pdf14 Oct 2021
Certificates of CA (Form 3)File: EAGLERIDGE A compressed.pdf7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eagleridge A.pdf4 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A.pdf4 Oct 2021
Form 2AFile: Eagleridge A Form 2A.pdf4 Oct 2021
Details of encumbrancesFile: RBPL CERSAI Eagleridge Solitaire Chesterton Glen bldgs Thane.pdf13 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Forn V EAGLERIDGE A.pdf13 Sep 2021
Disclosure of sold/ booked inventoryFile: Rera Data - Eagleridge A.pdf1 Sep 2021
Disclosure of sold/ booked inventoryFile: Eagleridge Wing A.pdf30 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eagleridge A.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A Form 2.pdf12 Aug 2021
Form 2AFile: FORM 2A Eagleridge A.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Eagleridge A.pdf12 Aug 2021
Certificates of CA (Form 3)File: Eagleridge A CA.pdf12 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Eagleridge Wing A - Status of Formation of AOA.pdf6 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Eagleridge Wing A - Status of Formation of AOA.pdf6 Jul 2021
Details of encumbrancesFile: Encumbrance Eagleridge A.pdf17 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eagleridge A form 1.pdf15 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A form 2.pdf15 Jun 2021
Form 2AFile: Eagleridge A form 2A.pdf15 Jun 2021
Certificates of CA (Form 3)File: Eagleridge A form 3.pdf15 Jun 2021
Disclosure of sold/ booked inventoryFile: EAGLERIDGE - A.pdf10 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eagleridge Wing A form 1.pdf15 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A form 2.pdf15 Mar 2021
Form 2AFile: FORM 2A Eagleridge A.pdf15 Mar 2021
Certificates of CA (Form 3)File: Eagleridge A form 3.pdf15 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eagleridge Wing A form 1.pdf14 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A form 2.pdf14 Dec 2020
Form 2AFile: FORM 2A Eagleridge A.pdf14 Dec 2020
Certificates of CA (Form 3)File: Eagleridge A wing CA.pdf14 Dec 2020
Annual Audit Report of Statutory CA (Form 5)File: EAGLERIDGE A Form V.pdf28 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eagleridge A.pdf15 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A Engr.pdf15 Sep 2020
Form 2AFile: Eagleridge A 2A.pdf15 Sep 2020
Certificates of CA (Form 3)File: Eagleridge A CA.pdf15 Sep 2020
Details of Restarting of Construction work post lockdownFile: EAGLERIDGE A.pdf20 Jun 2020
Certificates of CA (Form 3)File: Eagleridge A CA web.pdf14 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Egaleridge A form 1 web.pdf11 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A form2.pdf11 Jun 2020
Form 2AFile: Eagleridge A 2A.pdf11 Jun 2020
Certificates of CA (Form 3)File: Eagleridge A Ca.pdf15 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eagleridge A arch.pdf12 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A engr.pdf12 Mar 2020
Form 2AFile: Eagleridge A 2A.pdf12 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EAGLERIDGE A.pdf18 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eagleridge A.pdf15 Dec 2019
Form 2AFile: Eagleridge A 2A.pdf15 Dec 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Hiranandani EstateOff Ghodbunder Road Thane W - 4006073,174CompletedDec 2018May 2017
Hiranandani EstateOff Ghodbunder Road Thane W - 4006073,174CompletedDec 2018May 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EAGLERIDGE WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD7,600+ in Thane

2 kmEAGLERIDGE WING ACompleted 67Lapsed / revoked 12Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: ROMA BUILDERS PRIVATE LIMITED

ROMA BUILDERS PRIVATE LIMITED has 29 registrations on MahaRERA, including FORTUNA B and Eagleton. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if EAGLERIDGE WING A is delayed beyond 30 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EAGLERIDGE WING A?

The registered promoter entity is ROMA BUILDERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EAGLERIDGE WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EAGLERIDGE WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EAGLERIDGE WING A?

The professionals named in the filing: Architect: Ms. Sharmistha Mukerjee; Engineer: Er. Cyrus Pithawalla; Engineer: Er. Prahsant A. Tarmale; Chartered Accountant: S H PATRAWALA & CO; Chartered Accountant: P B DESAI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EAGLERIDGE WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EAGLERIDGE WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EAGLERIDGE WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.