DZ CITY BLDG No. 4 and 5
RG-MH-81169 · RERA P51700031434 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 54 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DZ CITY BLDG No. 4 and 5 is a Residential / Group Housing project by SKYLINE ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700031434 on 23 Oct 2021. Possession is promised by 31 Dec 2030. The completion date has moved by 54 months from the original filing. 102 of the 210 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameDZ CITY BLDG No. 4 and 5
- TypeResidential / Group Housing
- Location
- KAUSA
- MUMBRA
- Thane (M Corp.)
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700031434
- ReraGenie IDRG-MH-81169
Builder
- NameSKYLINE ENTERPRISES
- Entity typePartnership
- PartnersNOOR MOHAMMAD DOST MOHAMMAD, MOHAMMED AAREEF MEHMOOD KHANDWANI, YUSUF TAIYAB MEMON, IMRAN IQBAL MEMON, IMTIYAZ ABDUL HAMID DAKHWE, ASIF ASHFAQUE ANSARI
- Other registrations10 more →
- Completed4 of 11
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Oct 2021
- Promised completion31 Dec 2030
- Revised completionRevised to 31 Dec 2030 (originally 30 Jun 2026)
- Buildings2 building records
- Documents filed197 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 4 | NA | 23 | 12 | 70 | 27 | 97 |
| BUILDING NO 5 | NA | 23 | 11 | 78 | 35 | 113 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.
BUILDING NO 446%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 30% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
BUILDING NO 546%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 30% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed125
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING NO 4 | 18 | 45 | 63 |
| BUILDING NO 5 | 14 | 48 | 62 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| D. Z. REALTY | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 5 | NA | Rs 53.75 cr | Rs 17.01 cr |
| BUILDING NO 4 | NA | Rs 43.00 cr | Rs 14.31 cr |
| - | NA | Rs 2.22 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RIGHT ANGLE |
| Engineer | SS CONS |
| Engineer | MOHD AYYAN MOHD IFTEKHAR SHAIKH |
| Chartered Accountant | A S SUTERWALA & CO |
| Chartered Accountant | SHABBAR & ASSOCIATES |
| Chartered Accountant | BHURANI & ASSOCIATES |
| Chartered Accountant | AS SUTERWALA & CO |
| Partner | Role in project |
|---|---|
| SKYLINE ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSubject: Request for Extension of MahaRERA Project Registration u/s 7(3) Project: DZ CITY BLDG No. 4 and 5 RERA Registration Number: P51700031434. With reference to the above subject, we respectfully submit that the above-mentioned project was registered with MahaRERA on 23 October 2021, with the original completion date of 30 June 2026. The project comprises two buildings, namely Building No. 4 and Building No. 5, each proposed to consist of 22 floors. However, the Commencement Certificate (CC) was granted only up to 11 floors for Building No. 4 and 10 floors for Building No. 5, and the RCC w
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed197
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 197 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect certificate 31-3-2022.pdf | 31 Jul 2026 |
| Form 2File: Engineer Certificate FY 21-22-Q4.pdf | 31 Jul 2026 |
| Form 3File: CA Certificate- Q4- 21-22 Upload.pdf | 31 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 21-22.pdf | 31 Jul 2026 |
| Form 2A (FY 2023-2024)File: Quality Assurance FY 2023-24.pdf | 31 Jul 2026 |
| Form 2A (FY 2025-2026)File: Quality Assurance FY 2025-26.pdf | 31 Jul 2026 |
| Form 2A (FY 2021-2022)File: Quality Assurance FY 2021-22.pdf | 29 Jul 2026 |
| Form 2A (FY 2022-2023)File: Quality Assurance FY 2022-23.pdf | 29 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate FY 2026-27 Q1.pdf | 22 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Certificate FY 2026-27 Q1.pdf | 22 Jul 2026 |
| Withdrawal Update Form 3File: CA Certificate FY 2026-27 Q1.pdf | 22 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q4.pdf | 18 Jun 2026 |
| Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q4.pdf | 18 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q4.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q3.pdf | 12 Mar 2026 |
| Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q3.pdf | 12 Mar 2026 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q3.pdf | 12 Mar 2026 |
| Withdrawal Update Form 1File: Architect Certificate FY 2025-26 Q2.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Engineer Certificate FY 2025-26 Q2.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: CA Certificate FY 2025-26 Q2.pdf | 9 Mar 2026 |
| Form 1File: Architect certificate 30-9-2022.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 22-23-Q2.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate- Q2- 22-23 Upload.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 22-23-Q2.pdf | 5 Mar 2026 |
| Form 1File: Architect certificate 31-12-2022.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 22-23-Q3.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate-Q3-22-23 Upload.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 22-23-Q3.pdf | 5 Mar 2026 |
| Form 1File: Architect certificate 31-3-2023.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 22-23-Q4.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate Upload- FY 22-23-Q4.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 22-23-Q4.pdf | 5 Mar 2026 |
| Form 1File: Architect certificate 31-3-2022.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 21-22-Q4.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate- Q4- 21-22 Upload.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 21-22.pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate 30-6-2023.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 23-24-Q1.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate Upload- FY 23-24-Q1 .pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 23-24-Q1.pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate 30-9-2023.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 23-24-Q2.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate Upload- FY 23-24-Q2.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 23-24-Q2.pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate 31-12-2023.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 23-24-Q3.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate FY 23-24-Q3.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 23-24-Q3.pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate FY 23-24-Q4.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 23-24- Q4.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate FY 23-24-Q4 Revised.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 23-24-Q4.pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate FY 24-25-Q1.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 24-25- Q1.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate FY 24-25-Q1 Revised.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q1.pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate FY 24-25-Q2.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 24-25-Q2.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate FY 24-25-Q2.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q2.pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate FY 24-25-Q3.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 24-25-Q3.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate FY 24-25-Q3.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory FY 24-25-Q3 .pdf | 5 Mar 2026 |
| Form 1File: Architect Certificate FY 24-25-Q4.pdf | 5 Mar 2026 |
| Form 2File: Engineer Certificate FY 24-25-Q4.pdf | 5 Mar 2026 |
| Form 3File: CA Certificate FY 24-25-Q4.pdf | 5 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory FY 24-25-Q4.pdf | 5 Mar 2026 |
| Form 1File: Architect certificate 30-6-2022.pdf | 28 Feb 2026 |
| Form 2File: Engineer Certificate FY 22-23-Q1.pdf | 28 Feb 2026 |
| Form 3File: CA Certificate- Q1- 22-23 Upload.pdf | 28 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- FY 22-23-Q1.pdf | 28 Feb 2026 |
| Form 2A (FY 2024-2025)File: Quality Assurance FY 2024-25.pdf | 18 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Audit Report FY 2024-25.pdf | 18 Dec 2025 |
| Form 5 (FY 2023-2024)File: Form 5-Audit Report FY 2023-24.pdf | 18 Dec 2025 |
| Form 5 (FY 2022-2023)File: Form 5-Audit Report FY 22-23.pdf | 18 Dec 2025 |
| Form 5 (FY 2021-2022)File: Form 5-Audit Report FY 21-22.pdf | 18 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate FY 25-26-Q1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Engineer Certificate FY 25-26-Q1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: CA Certificate FY 25-26-Q1.pdf | 6 Aug 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 197 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DZ CITY BLDG No. 4 and 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MUMBRA7,600+ in Thane
Filed coordinates, straight-line distance. 95 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: SKYLINE ENTERPRISES
SKYLINE ENTERPRISES has 11 registrations on MahaRERA, including Skyline Status and Sukhsagar Nagar. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 8 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if DZ CITY BLDG No. 4 and 5 is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DZ CITY BLDG No. 4 and 5?
The registered promoter entity is SKYLINE ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DZ CITY BLDG No. 4 and 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DZ CITY BLDG No. 4 and 5?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DZ CITY BLDG No. 4 and 5?
The professionals named in the filing: Architect: RIGHT ANGLE; Engineer: SS CONS; Engineer: MOHD AYYAN MOHD IFTEKHAR SHAIKH; Chartered Accountant: A S SUTERWALA & CO; Chartered Accountant: SHABBAR & ASSOCIATES; Chartered Accountant: BHURANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DZ CITY BLDG No. 4 and 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback