ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / DWARKAMAI

Registration lapsed No litigation declared Residential / Group Housing project

DWARKAMAI

By Rajlaxmi Associates

RG-MH-59518 · RERA P52100051997 · Last updated on MahaRERA portal: 12 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
68 of 110Construction stages doneacross 10 buildings; furthest along: Sanitary Fittings within the flats /..., 92%
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

DWARKAMAI is a Residential / Group Housing project by Rajlaxmi Associates in Pune, Maharashtra, registered with MahaRERA as P52100051997 on 13 Jul 2023. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 11 months from the original filing.

At a glance

Project

  • NameDWARKAMAI
  • TypeResidential / Group Housing
  • Location
    • Varulwadi
    • Junnar
    • Pune
    • 410504
  • Pincode410504
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051997
  • ReraGenie IDRG-MH-59518

Builder

  • NameRajlaxmi Associates
  • Entity typePartnership
  • PartnersDeepali Pawan Phulsundar, Anand Mangesh Bhaskar, Manisha Mangesh Bhaskar, Nikhil Dilip Jagtap, Revati Onkar Wagh, Sunita Manohar Wagh

Key dates

16 months past promisethis monthRegisteredJul 2023First promiseJul 2024Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on13 Jul 2023
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 1 Jul 2024)
  • Buildings10 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row House 10NA20000
Row House 1NA20000
Row House 2NA20000
Row House 3NA20000
Row House 4NA20000
Row House 5NA20000
Row House 6NA20000
Row House 7NA20000
Row House 8NA20000
Row House 9NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 12 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

68 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 92%.

Row House 1073%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 180%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 280%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 371%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 480%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 580%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 680%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 771%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Row House 879%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Row House 979%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Open Space10
BuildingOpen SpaceTotal
Row House 1011
Row House 111
Row House 211
Row House 311
Row House 411
Row House 511
Row House 611
Row House 711
Row House 811
Row House 911

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Anita Dharmaji JavalkarNarayangaonPune
Sangita Ganesh FadaleNarayangaonPune

Approvals and building plan

Sanctioning authorityJunnar Ambegaon sub division Pune Main Branch
Permissible FSI2394.32
Proposed, not sanctioned1,178 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWard No 6 Warulwadi Narayangaon Junnar Pune 410504

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Milind Panchal and Associates
EngineerEngineer Navnath D Jarag
Chartered AccountantCA A U Mojad and Associates
Chartered AccountantA U Mojad and Associates
PartnerRole in project
Rajlaxmi Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024159Jul 2024 → Jun 2025

Reason as filed by the promoter(1) Initially when we applied for Rera we took Rera registration validity for 1 year only; we considered time only for construction work completion (2) Our Construction work is completed upto 85% for balance work to complete we required time extension (3) We also need time extension for getting completion certificate/occupancy certificate from SDO Junnar for our project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 upto sept 2024.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 upto sept 2024.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: DOSUSEPT2024.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: scanf2a.pdf12 Nov 2024
Declaration in FORM BFile: Form B Self declaration.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech cert 20aug.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 arch cer.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 upto sept 2024compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg 20Aug.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 23.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM DEC .pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARCH 24.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DOS Sept 2023.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep engg.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec engg.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March engg.pdf25 May 2024
Disclosure of sold/ booked inventoryFile: DOS Sept 2023.pdf25 May 2024
Disclosure of sold/ booked inventoryFile: DOS Dec 2023 .pdf25 May 2024
Disclosure of sold/ booked inventoryFile: DOS Mar 2024.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sept Rajlaxmi Associates form no 3 Q 2pdfcompressed.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dec Rajlaxmi Associates form no 3 Q3 pdfcompressed.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: march Rajlaxmi Associates form no3 Q4d.pdf25 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 5.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 6.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 7.pdf4 Jul 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf28 Jun 2023
Layout approvalFile: 2mb sanctioned Plan compressed.pdf4 Jun 2023
Building plan approvalFile: 2mb sanctioned Plan compressed.pdf4 Jun 2023
PAN CardFile: 2mb pan.pdf4 Jun 2023
Copy of the legal title reportFile: 2mb Legal Title Report format A.pdf4 Jun 2023
Copy of the legal title reportFile: 2mb Legal search report flow Search Report Rajlaxmi Associate.pdf4 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letterfinance.pdf4 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance letterLegal.pdf4 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letterfinance.pdf4 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance letterLegal.pdf4 Jun 2023
Copy of Layout Approval (in case of layout)File: 2mb sanctioned Plan compressed.pdf4 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2mb sanctioned Plan compressed.pdf4 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf4 Jun 2023
Declaration in FORM BFile: 2mb Self declaration builderto3.pdf4 Jun 2023
CERSAI detailsFile: declaration about cersai.pdf4 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2mb CA Certificate.pdf4 Jun 2023
Proforma of Allotment letterFile: Dwarkamai Model Form of Allotment Letter.pdf4 Jun 2023
Proforma of Agreement for saleFile: Dwarkamai Model Form of Agreement.pdf4 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank letter.pdf4 Jun 2023
Deviation Report with respect to Allotment letterFile: deviation reportallotment letter.pdf4 Jun 2023
Deviation Report with respect to model copy of AgreementFile: deviation reportmodel form of aggrement.pdf4 Jun 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 11 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DWARKAMAI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Varulwadi13,700+ in Pune

2 kmDWARKAMAICompleted 7Lapsed / revoked 8Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Rajlaxmi Associates

Rajlaxmi Associates has 1 registration on MahaRERA, including DWARKAMAI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that DWARKAMAI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DWARKAMAI is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DWARKAMAI?

The registered promoter entity is Rajlaxmi Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DWARKAMAI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DWARKAMAI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DWARKAMAI?

The professionals named in the filing: Architect: Architect Milind Panchal and Associates; Engineer: Engineer Navnath D Jarag; Chartered Accountant: CA A U Mojad and Associates; Chartered Accountant: A U Mojad and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DWARKAMAI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DWARKAMAI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DWARKAMAI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.