Home / Browse projects / Kolhapur, Maharashtra / Dwarka Adreno

Completed No litigation declared Others project

Dwarka Adreno

By M/S Randive Builders and Developers

RG-MH-11428 · RERA P53000003557 · Last updated on MahaRERA portal: 25 Mar 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 70 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Aug 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 98%
0Complaints at MahaRERAon this registration
Jump to the 144 documents Report an error

Dwarka Adreno is a Others project by M/S Randive Builders and Developers in Kolhapur, Maharashtra, registered with MahaRERA as P53000003557 on 5 Aug 2017. The registration is recorded completed; possession was promised by 31 Aug 2026. The completion date has moved by 70 months from the original filing.

At a glance

Project

  • NameDwarka Adreno
  • TypeOthers
  • Location
    • E ward Line Bazaar
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416006
  • Pincode416006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000003557
  • ReraGenie IDRG-MH-11428

Builder

  • NameM/S Randive Builders and Developers
  • Entity typePartnership
  • GSTIN27AAHFR9603B1ZB
  • PartnersShobha Ramesh Randive, Shobha Ramesh Randive
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseOct 2020Revised toAug 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2017
  • Promised completion31 Aug 2026
  • Revised completionRevised to 31 Aug 2026 (originally 15 Oct 2020)
  • Buildings1 building record
  • Documents filed144 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dwarka AdrenoNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

Dwarka Adreno: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,419 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shekhar Ramesh Randive and othersKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI2465.56
Proposed, not sanctioned2,232 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchC S No 629 C Ward Shivaji Road Aaram corner Kolhapur 416002

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Amar B Upadhye
EngineerMr Pranav A Kulkarni Ashok Kulkarni
EngineerAnu-Abaji Construction and swara Consultancy
Chartered AccountantShankar Vitthal Patil
Chartered AccountantJ.P. Chougule & Company
PartnerRole in project
M/S Randive Builders and Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53000013620Oct 2020 → Aug 2023

Reason as filed by the promoterWe have completed our Project But, we are not received Completion Certificate from Kolhapur Municipal Corporation in within time limit . So we have require for further extension for up to date 31/08/2023.

EXT53000008400Oct 2020 → Oct 2021

Reason as filed by the promoterThe development work of our Real Estate Project is going on. We have submited the revised plan in respect of said project to the concerned Authority. Because of this we are unable to complete the said project in projected period i.e. on 15/10/2020.

EXT53000024821Oct 2020 → Aug 2026

Reason as filed by the promoterWe have applied for revised sanction in respect of said project. it is required more time to complete the project hence we are applied for extension of said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed144

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B randive.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 June 18.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Sept 2024.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 June2024.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Dec 2023.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Sept 2023.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 June 2023.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 March 2023.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Dec 2022.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Sept 2022.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 June 2022.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 March 2022.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Dec 2021.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 June 2021.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Sept 18.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Dec 18.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 June 19.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 dec 19.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 March 20.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 June 20.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Sept 20.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 dec 20.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 March 2021.pdf25 Mar 2025
Certificates of CA (Form 3)File: Form 3 Sept 2021.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 sept 24.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1 Jun 24.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 24.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 23.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 june 23.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 23.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 22.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 22.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 22.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 21.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 sept 21.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 21.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 21.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 20.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 20.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 20.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 20.pdf25 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 22.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Dec 2021.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Dec 2024.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry March 2022.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Form 3 June 2022.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Sept 2022.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Dec 2022.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry March 2023.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry June 2023.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry sept 2023.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Dec 2023.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry March 2024.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry June 2024.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Sept 2024.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Sept 2021.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry June 2021.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry March 2021.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Dec 2020.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Sept 2020.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry June 2020.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry March 2020.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Dec 19.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Sept 19.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry March 19.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Dec 18.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Sep 18.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Inventry Jun 18.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 2.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 24.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 24.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 24.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 24.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 23.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 23.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 23.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 23.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 22.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 22.pdf1 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 22.pdf1 Mar 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Dwarka SrustiR S No 817 1 Plot No 24 E Ward Kasaba Bawada Kolhapur10CompletedMay 2017May 2017
Dwarka VishwaC S No 384 Plot No 1 E Ward Mali Colony Kolhapur5CompletedNov 2015Nov 2015
Dwarka HeightsR S No 870A H S No 3B-3A E Ward Kasaba Bawada Kolhapur56CompletedFeb 2015Feb 2015
Dwarka ResidencyR S No 870-3A-A 3A-1-2 3A-1-3 E Ward Kasaba Bawada kolahpur28CompletedSep 2012Sep 2012

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one moved by 70 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Dwarka Adreno on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolhapur (M Corp.)880+ in Kolhapur

2 kmDwarka AdrenoCompleted 14Lapsed / revoked 6Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: M/S Randive Builders and Developers

M/S Randive Builders and Developers has 3 registrations on MahaRERA, including Dwarka Ravaji and Dwarka Adreno. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if Dwarka Adreno is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dwarka Adreno?

The registered promoter entity is M/S Randive Builders and Developers, a partnership as per the filing. Its GSTIN 27AAHFR9603B1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dwarka Adreno?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dwarka Adreno?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dwarka Adreno?

The professionals named in the filing: Architect: Mr Amar B Upadhye; Engineer: Mr Pranav A Kulkarni Ashok Kulkarni; Engineer: Anu-Abaji Construction and swara Consultancy; Chartered Accountant: Shankar Vitthal Patil; Chartered Accountant: J.P. Chougule & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dwarka Adreno?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dwarka Adreno. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dwarka Adreno to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.