DURGA PRASAD is a Commercial project by MANJUNATH PAI in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/319/PR/170322/004772 on 17 Mar 2022. Possession is promised by 28 Dec 2021. 0 of the 20 units on this registration are recorded sold or booked, and 0 of 14 construction stages are filed complete.
At a glance
Project
- NameDURGA PRASAD
- TypeCommercial
- Location
- Karkala
- Udupi
- 576117
- Pincode576117
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1273/319/PR/170322/004772
- ReraGenie IDRG-KA-49112
Builder
- NameMANJUNATH PAI
- Entity typeProprietorship Firm
- Authorized SignatoryMANJUNATH PAI
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Mar 2022
- Promised completion28 Dec 2021
- Revised completionNone
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 25 Feb 2022, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DURGA PRASAD | - | - | - | 0 | 20 | 20 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 25 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 14 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 25 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MANJUNATH PAI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 1.10 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RATHAN SEQUEIRA |
| Engineer | RATHAN SEQUEIRA |
| Chartered Accountant | VIGNESH KAMATH |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed81
As listed on the registration, under the names the promoter filed them with; the newest 80 of 81 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/319/PR/170322/004772 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| project specificationFile: specification.pdf | 25 Feb 2022 |
| Power supply authority noc with fee payment receiptFile: MESCOM NOC with fee receipt.pdf | 25 Feb 2022 |
| proforma AOSFile: proforma AOS.pdf | 25 Feb 2022 |
| Septic tank, Soak pit and sewer line demarcation site planFile: SEPTIC TANK SHOWING SITE PLAN.pdf | 25 Feb 2022 |
| STP DRAWINGFile: STP-drawing.pdf | 25 Feb 2022 |
| Occupancy certficateFile: occupancy certficate-final.pdf | 25 Feb 2022 |
| sold and unsold detailsFile: sold unsold units.pdf | 25 Feb 2022 |
| affidavit for sold unsold unitsFile: affidavith sold unsold unit.pdf | 25 Feb 2022 |
| delay reason clarificationFile: clarification.pdf | 25 Feb 2022 |
| RTC, survey 216/1F | - |
| Mutation, survey 216/1F | - |
| Encumbrance Certificate, survey 216/1F | - |
| Conversion/Alienation Order, survey 216/1F | - |
| Sale/Title/Gift Deed, survey 216/1F | - |
| Khatha, survey 216/1F | - |
| Certificate issued by CA Form 1File: ca certficate.pdf | - |
| Certificate issued by Architect Form 2File: architect certfictae_compressed.pdf | - |
| Certificate issued by Engineer Form 3File: engineer certficate_compressed.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: litigation affidavith.pdf | - |
| Certificate from Chartered AccountFile: approval certficate.pdf | - |
| Balance Sheet 2020 - 2021File: BS 2021-22.pdf | - |
| Balance Sheet 2019 - 2020File: BS 2020-21.pdf | - |
| Balance Sheet 2018 - 2019File: BS 2019-20.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: P&L 21-22_compressed.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: P&L 20-21_compressed.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: P&L 19-20_compressed.pdf | - |
| Cash Flow Statement 2020 - 2021File: IS 21-22_compressed.pdf | - |
| Cash Flow Statement 2019 - 2020File: IS 20-21_compressed.pdf | - |
| Auditor's Report 2020 - 2021File: AR 21-22.pdf | - |
| Auditor's Report 2019 - 2020File: AR 21-22.pdf | - |
| Auditor's Report 2018 - 2019File: AR 19-20.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR 21-22.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR 20-21.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: ITR 2019-20.pdf | - |
| building licence renewed_compressed | - |
| sanction plan | - |
| single layout | - |
| sanction plan | - |
| sanction plan | - |
| single layout | - |
| single layout | - |
| single layout | - |
| completion certficate by engineer | - |
| title deed | - |
| CONVERSION ORDER_compressed | - |
| CONVERSION ORDER_compressed | - |
| proforma AOS | - |
| Proforma allottment | - |
| DURGA PRASAD brochure | - |
| form b | - |
| affidavth 3(1) | - |
| mescom noc | - |
| water noc | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| occupancy certficate-final | - |
| noc by panchayath | - |
| bank affidavith | - |
| Occupancy CertificateFile: occupancy certfiacte.pdf | - |
| Architect certificate for having completed the work(in format no 5)File: architect completion.pdf | - |
| Chartered Accountant certificate for having completed the work(in format no 4)File: FORM 4CC.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: completion affidavit.pdf | - |
| COMPLETION CERTIFCATEFile: completion certificate.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Udupi
Computed across the 260+ Udupi projects on ReraGenie, from their own filings.
Keep DURGA PRASAD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udupi260+ in Udupi
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
KARLA CITY CENTRE
M S MANASA PROPERTIES
GRASSLANDS - LAKESIDE
GRAZLANZ PROPERTIES LLP
MANDAVI DOWNTOWN
MANDAVI CONSTRUCTIONS
KIRTHI PALMVILLE PHASE II
KIRTHI CONSTRUCTION
RAINTREE
VINIT S AMIN
MANDAVI ROYAL GARDEN
MANDAVI INFRASTRUCTURES
See every Udupi project, with the district possession charts
Builder: MANJUNATH PAI
MANJUNATH PAI has 1 registration on RERA Karnataka, including DURGA PRASAD. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.
Frequently asked questions
What are my rights if DURGA PRASAD is delayed beyond 28 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of DURGA PRASAD?
The registered promoter entity is MANJUNATH PAI, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in DURGA PRASAD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at DURGA PRASAD?
The professionals named in the filing: Architect: RATHAN SEQUEIRA; Engineer: RATHAN SEQUEIRA; Chartered Accountant: VIGNESH KAMATH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DURGA PRASAD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback