DURGA IMPERIAL
RG-MH-11462 · RERA P51700007962 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
- Completion date moved by 36 months
- 1 extension taken
Clear
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DURGA IMPERIAL is a Others project by G K MALI & C K MALI in Thane, Maharashtra, registered with MahaRERA as P51700007962 on 18 Aug 2017. Possession is promised by 31 Oct 2026. The completion date has moved by 36 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameDURGA IMPERIAL
- TypeOthers
- Location
- KALYAN - SHILPHATA ROAD
- NETIVALI
- Kalyan
- Thane
- 421306
- Pincode421306
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700007962
- ReraGenie IDRG-MH-11462
Builder
- NameG K MALI & C K MALI
- Entity typeOthers
- PartnerGOPAL KRISHNA MALI k MALI
- PartnerCHANDRAKANT KRISHNA MALI K MALI
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Aug 2017
- Promised completion31 Oct 2026
- Revised completionRevised to 31 Oct 2026 (originally 30 Oct 2023)
- Buildings1 building record
- Documents filed100 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DURGA IMPERIAL A,B WING | NA | 31 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 45%.
DURGA IMPERIAL A,B WING: 44% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 1% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 31% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 20% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed56
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIJAY PANDEY |
| Engineer | ARUN R KHASNIS |
| Chartered Accountant | GAYAKWAD & ARRACKEN |
| Chartered Accountant | K NARAYANAN |
| Chartered Accountant | Manali Jaydip Godse |
| Partner | Role in project |
|---|---|
| G K MALI & C K MALI | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir We are applying for extension As there is Revision in Commencement Certificate as per revised KDMC norms, Increase in Sanctioned floors of Building A wing from 20 floors to 29 floors Building B wing from 8 floors to 20 floors Shortage of Labour post Covid 19 & Financial issues . OVERALL DELAY IN CONSTRUCTION INDUSTRY , SLOWDOWN & PANDEMIC COVID 19 We Request You to extend the Above project upto 30 Oct 2026. Thanks you
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 145/15/2015 | KALYAN | VERDICT IN FAVORING GK MALI CK MALI |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000303432 | Dhananjay Ashok Tawade | G K MALI & C K MALI | 28/11/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Jan 2024
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Rera Form 1.pdf | 30 May 2026 |
| Form 2File: Rera Form 2.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: GK MALI CK MALI SOLD UNSOLD MARCH 2026.pdf | 30 May 2026 |
| Form 3File: GK MALI CK MALI FORM 03 MARCH 2026.pdf | 30 May 2026 |
| Form 1File: Form-1 Rera Letter 31-12-2025.pdf | 21 Feb 2026 |
| Form 2File: Engineers Cerificate 31-12-25.pdf | 21 Feb 2026 |
| Form 3File: G K MALI C K MALI DURGA IMPERIAL FORM 03 DEC-2025.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: G K MALI C K MALI DURGA IMPERIAL SOLD UNSOLD 31-12-2025.pdf | 21 Feb 2026 |
| Form 1File: Rera Form 1.pdf | 12 Nov 2025 |
| Form 2File: Rera Form-2.pdf | 12 Nov 2025 |
| Form 3File: G K MALI & C K MALI 04-11-2025 FORM -03.pdf | 12 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: G K MALI & C K MALI SOLD & UNSOLD 30-09-2025.pdf | 12 Nov 2025 |
| Form 2A (FY 2024-2025)File: FORM-2A.pdf | 19 Aug 2025 |
| Form 1File: Rera Form 1.pdf | 7 Aug 2025 |
| Form 2File: Rera Form 2.pdf | 7 Aug 2025 |
| Form 3File: G K MALI & C K MALI FORM-3 30-06-2025.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: G K MALI & C K MALI SOLD & UNSOLD 30-06-2025.pdf | 7 Aug 2025 |
| Form 5 (FY 2024-2025)File: G K MALI AND C K MALI FORM 5.pdf | 4 Jun 2025 |
| Certificates of CA (Form 3)File: G K MALI AND C K MALI DURGA IMPERIAL FORM 3.pdf | 13 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate FORM 1 (1).pdf | 2 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginners Certificate FORM-2 (2).pdf | 2 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Qulality Assurance Certificate FORM2A(1).pdf | 2 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Annexure A-FORM 1.pdf | 25 Jan 2025 |
| Certificates of CA (Form 3)File: G K MALI CK MALI 31-12-2024.pdf | 25 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enigneers Certifiate 31-12-2024.pdf | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A-31-12-2024.pdf | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A-31-12-2024.pdf | 25 Jan 2025 |
| Certificates of CA (Form 3)File: FROM-3 G K MALI C K MALI SEP 24.pdf | 31 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 September.pdf | 30 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 September.pdf | 30 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 1.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: G K MALI C K MALI ANNEXURE F FORM 5 31-03-2024.pdf | 10 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March .pdf | 4 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June .pdf | 4 Nov 2024 |
| Certificates of CA (Form 3)File: G K MALI C K MALI FORM 3 31-03-2024.pdf | 4 Nov 2024 |
| Certificates of CA (Form 3)File: G K MALI C K MALI FORM 3 30-06-2024.pdf | 4 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March .pdf | 4 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Forn 2 June.pdf | 4 Nov 2024 |
| Building plan approvalFile: 1(2023).pdf | 11 Mar 2024 |
| Building plan approvalFile: 3(2023).pdf | 11 Mar 2024 |
| Building plan approvalFile: 2(2023).pdf | 11 Mar 2024 |
| Building plan approvalFile: 4(2023).pdf | 11 Mar 2024 |
| Building Plan Approval (IOD)File: 1(2023).pdf | 11 Mar 2024 |
| Building Plan Approval (IOD)File: 3(2023).pdf | 11 Mar 2024 |
| Building Plan Approval (IOD)File: 2(2023).pdf | 11 Mar 2024 |
| Building Plan Approval (IOD)File: 4(2023).pdf | 11 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Bandhkam Permission(2023).pdf | 27 Feb 2024 |
| Declaration in FORM BFile: G K MALI C K MALI FORMT STAMP PAPER.pdf | 21 Feb 2024 |
| Declaration in FORM BFile: GKMAKI CKMALI FORM B.pdf | 15 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: GK MALI CK MALI DURGA IMPERIAL.pdf | 24 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: GK MALI CK MALI DURGA IMPERIAL 2.pdf | 24 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: frm 5 21.pdf | 24 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 5 G K MALI 31-03-2022.pdf | 24 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM NO 5 G K MALI C K MALI AS ON 31-03-2023.pdf | 24 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Bandhkam Permission.pdf | 22 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: GK MALI CK MALI Town planing.pdf | 22 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: frm 1 311221.pdf | 22 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc 30622 (1).pdf | 22 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc 31323.pdf | 22 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form1 Architect Letter 30-09-2023 nw.pdf | 22 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GK MALI CK MALI Architect Cert 311223.pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate (30_03_2022).pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng 30622 n (1).pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Enginners Certificate (30-09-2022).pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Enginners Certificate (30_12_2022).pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: en 30923.pdf | 22 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GK MALI CK MALI Engg Cert 311223.pdf | 22 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Durga Imperial Commercial Completion Certificate.pdf | 22 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: part oc mali.pdf | 22 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2a 20.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2a 21.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2a 22.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2a 23.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: GKCK MALI DURGA 30-06-2023 COMP.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: GKCK MALI DURGA 30-09-2023.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: GKCK MALI DURGA 31-12-2023.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: mali form no 3 31-12-2022.pdf | 5 Jan 2024 |
| Certificates of CA (Form 3)File: mali form no 3 31-03-2023.pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: G K MALI MARCH 2018.pdf | 3 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: G K MALI MARCH 2018.pdf | 3 Aug 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| DURGA NAGAR | DURGA NAGAR PISAVALI KALYAN E | Completed | Aug 2015 | Aug 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DURGA IMPERIAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NETIVALI7,600+ in Thane
Filed coordinates, straight-line distance. 151 registered projects within 2 km.
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: G K MALI & C K MALI
G K MALI & C K MALI has 1 registration on MahaRERA, including DURGA IMPERIAL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if DURGA IMPERIAL is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DURGA IMPERIAL?
The registered promoter entity is G K MALI & C K MALI, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DURGA IMPERIAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against DURGA IMPERIAL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for DURGA IMPERIAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DURGA IMPERIAL?
The professionals named in the filing: Architect: VIJAY PANDEY; Engineer: ARUN R KHASNIS; Chartered Accountant: GAYAKWAD & ARRACKEN; Chartered Accountant: K NARAYANAN; Chartered Accountant: Manali Jaydip Godse. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DURGA IMPERIAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback