Home / Browse projects / DUDHWALA AQUAPEARL

Registration lapsed No litigation declared Residential / Group Housing project

DUDHWALA AQUAPEARL

By DUDHWALA REAL ESTATE AND INVESTMENT

RG-MH-12494 · RERA P51900004897 · Last updated on MahaRERA portal: 4 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2022Possession promised46 months past this date
20 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 99%
1Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

DUDHWALA AQUAPEARL is a Residential / Group Housing project by DUDHWALA REAL ESTATE AND INVESTMENT in MUMBAI, 400008, registered with MahaRERA as P51900004897 on 9 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDUDHWALA AQUAPEARL
  • TypeResidential / Group Housing
  • Location
    • BELASIS ROAD
    • MUMBAI
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900004897
  • ReraGenie IDRG-MH-12494

Builder

  • NameDUDHWALA REAL ESTATE AND INVESTMENT
  • Entity typePartnership
  • PartnerDOSTMOHAMMED PATEL

Key dates

46 months past promisethis monthRegisteredAug 2017PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA190000
BUILDING 2 - STILT TO 25 FLOORNA290000
BUILDING 2- 26TH TO 31TH FLOORSNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 99%.

BUILDING 199%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%
BUILDING 2 - STILT TO 25 FLOOR99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92%
BUILDING 2- 26TH TO 31TH FLOORS54%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 4 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes90%

Parking filed326

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots326
Closed/Covered325
Open Space1
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 124125
BUILDING 2 - STILT TO 25 FLOOR2200220
BUILDING 2- 26TH TO 31TH FLOORS81081

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,994 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21829.09
Proposed, not sanctioned16,129 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR NAIR ROAD OPP MUMBAI CENTRAL STATION MUMBAI - 400 008

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S. SHAIKH & ASSOCIATES
ArchitectREZA KABUL ARCHITECTS PVT. LTD.
EngineerHANWARE CONSULTANTS
PartnerRole in project
DUDHWALA REAL ESTATE AND INVESTMENT-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400749Mohammed Iqbal Noor Mohammed BijalDUDHWALA REAL ESTATE AND INVESTMENT12/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Nov 2024

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Architects Certificate-23-12-24.pdf4 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Aquapearl_OC_upto 31st floor.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: AP Disclosure-31st-Mar-24.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: AP Disclosure-25th-Mar-24.pdf2 May 2024
Certificates of CA (Form 3)File: CA_DREI_upto 30-06-2023.pdf2 May 2024
Certificates of CA (Form 3)File: CA_DREI_upto 30-09-2023.pdf2 May 2024
Certificates of CA (Form 3)File: CA_DREI_upto 31-12-2023.pdf2 May 2024
Disclosure of sold/ booked inventoryFile: upto dec23-Aquapearl Sale Disclosure 26-31.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: upto dec23-Aquapearl Sale Disclosure 1-25.pdf3 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC Letter Dt 27-07-2017.pdf3 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_DREI_upto 31122022.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_DREI_upto 31032023.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_DREI_upto 30062023.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_DREI_upto 30092023.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_DREI_upto 31122023.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_DREI_ upto 31122022.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer _DREI_upto 30062023.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_DREI_upto 30092023.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_DREI_upto 31122023.pdf2 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Aqua-pearl FORM 5_2018-19.pdf1 Mar 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest of partners of DREI.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Aqua-pearl FORM 5_2020-2021.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aqua-pearl FORM 5_2021-2022.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Aqua-pearl FORM 5_2022-2023.pdf13 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of legal encumbrances.pdf29 Dec 2023
Details of encumbrances concerned to LegalFile: Details of legal encumbrances.pdf29 Dec 2023
Proforma of Agreement for saleFile: AFS.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Aqua-pearl30922.pdf8 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DREI Rera upto sept 2022.pdf8 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch_2021.pdf12 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_march_2022.pdf12 Dec 2022
Form 2AFile: Eng Certificate_Aquapearl_2021 (1).pdf12 Dec 2022
Form 2AFile: Eng Certificate_Aquapearl_2022 (1).pdf12 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: DRE - Form 5.pdf28 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: storon.pdf21 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan_0001 (1).pdf21 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg_dwc_10420.pdf21 Jan 2021
Certificates of CA (Form 3)File: DREI 300619.pdf21 Jul 2020
Certificates of CA (Form 3)File: DREI 300919.pdf21 Jul 2020
Certificates of CA (Form 3)File: DREI 311219.pdf21 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anjuman_Arch.pdf4 Feb 2020
Form 2AFile: ENGG_DWC_RERA.pdf29 Jan 2020
Certificates of CA (Form 5)File: DRE_Form5_Apr18toMarch19.pdf23 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_DRE_Sept_2019.pdf6 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DWC_Engg_Sept2019-compressed.pdf4 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: aRCH_Cert_DRE.pdf22 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eNGG_dre.pdf22 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certificate_Anjuman_Dt_11-04-2019-compressed.pdf17 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_Anjuman_Dt_10-04-2019-compressed.pdf17 Aug 2019
Form 2AFile: DRE_form2_compressed.pdf29 Apr 2019
Form 2AFile: Form2-compressed.pdf22 Feb 2019
Certificates of CA (Form 5)File: Form 5.pdf22 Feb 2019
Proforma of Allotment letterFile: Agreement for Sale-Draft.pdf13 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_101117.pdf14 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_6112017.PDF14 Nov 2017
Building plan approvalFile: 2085217_OC_signed.pdf7 Nov 2017
Building Plan Approval (IOD)File: 2085217_OC_signed.pdf7 Nov 2017
Layout approvalFile: LAYOUT-.pdf30 Jul 2017
Building plan approvalFile: IOD-.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT-.pdf30 Jul 2017
Building Plan Approval (IOD)File: IOD-.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE-SHK.pdf30 Jul 2017
OtherFile: annex--aqua.pdf30 Jul 2017
Certificates of CA (Form 3)File: C A Certificate.pdf29 Jul 2017
Declaration in FORM BFile: FORM B-aquapearl-1.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT FORM 2.pdf27 Jul 2017
Details of encumbrancesFile: Non Encumb.pdf24 Jul 2017
Proforma of Allotment letterFile: Allotment and Sales.pdf24 Jul 2017
PAN CardFile: PANCARD.pdf22 Jul 2017
Copy of the legal title reportFile: Mahenra C Jain_Title Certificate.PDF22 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert.pdf22 Jul 2017

Keep DUDHWALA AQUAPEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI

2 kmDUDHWALA AQUAPEARLCompleted 12Lapsed / revoked 18Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: DUDHWALA REAL ESTATE AND INVESTMENT

DUDHWALA REAL ESTATE AND INVESTMENT has 1 registration on MahaRERA, including DUDHWALA AQUAPEARL. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that DUDHWALA AQUAPEARL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DUDHWALA AQUAPEARL is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DUDHWALA AQUAPEARL?

The registered promoter entity is DUDHWALA REAL ESTATE AND INVESTMENT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DUDHWALA AQUAPEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DUDHWALA AQUAPEARL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DUDHWALA AQUAPEARL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DUDHWALA AQUAPEARL?

The professionals named in the filing: Architect: M/S. SHAIKH & ASSOCIATES; Architect: REZA KABUL ARCHITECTS PVT. LTD.; Engineer: HANWARE CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DUDHWALA AQUAPEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DUDHWALA AQUAPEARL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DUDHWALA AQUAPEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.